Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAdmitted-Finance | ₹9.6 L | L1 | Admitted-Finance |
| 2 | L2₹15.2 LAdmitted-Finance KOLKATA WEST BENGAL 700007 UDYAM WB 10 0014221 19AAFCA5993C1ZI R G MII STATUS AS NOT VERIFIED | KOLKATA | WEST BENGAL | 700007 | ₹15.2 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | AMC Services and Engineers Pvt Ltd L2 | TRANSREPOWER ENGINEERING SERVICES INDIA PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00 | Attending Troubleshooting repairs & overhaul of the DANA Spicer Off-Highway Transmission (Model: 3019FMHR24659-110, Sl. No: WBEA031655) fitted on a 30-Ton Escort Mobile Crane. The scope involves systematic isolation, fluid evacuation, and extraction from the crane foundation, followed by a complete strip-down and cleaning of all sub-components. A Root Cause Analysis (RCA) shall be conducted to identify the source of abnormal rubbing noise, followed by replacement of all damaged, worn/defective components , specifically including required set(s) of all bearings, clutch discs, pistons, seal kits, solenoids, and charging pumps of Transmission as per the list available at Sl.No. 3 of Section - VIII (Part No: 4264760/OVRKT) and other required OEM spares. Re-assembling to precision, ensuring internal clearances and backlash are calibrated to OEM tolerances, with all fasteners secured via a calibrated torque wrench as per manufacturer’s torque profiling standards, finishing the job with post-installation system priming, hydraulic pressure stability verification, and post repair road trail run with full-load test commissioning under EIC / his authorised supervision including cost of all labor, specialized service charges, overhauling charges, material freight, lodging /boarding charges of service engineers , GST/applicable taxes & while the provision of heavy lifting equipment (forklift/crane) for removal/installation of Gear Boxes from the Crane, shall be provided by the department on Free of Cost. | 1 | Job | 15,22,076 ₹15.2 L | 9,56,805 ₹9.6 L |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
2 Apr 2026, 3:00 pmClosed
Executiving Engineer (CSWD), ALHW
Executive Engineer (CSWD), Andaman Lakshadweep Harbour Works, Sri Vijaya Puram - 744101
Attending Troubleshooting, repairs and overhaul of the DANA Spicer Off-Highway Transmission (Model 3019FMHR24659-110, Sl. No WBEA031655) fitted on 30-Ton Escort Mobile Crane stationed at Haddo wharf in Sri Vijaya Puram.
2026_ALHW_903567_1
ALHW/DCEM/TECH(Q135)/1/2026 (Recall)
Open Tender
Machineries/ Mechanical Engg Items
60 days
Haddo Wharf, Sri Vijaya Puram
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹30,000
Yes
15 Apr 2026
24 Mar 2026
4 Apr 2026
24 Mar 2026
2 Apr 2026
24 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Attending Troubleshooting repairs & overhaul of the DANA Spicer Off-Highway Transmission (Model: 3019FMHR24659-110, Sl. No: WBEA031655) fitted on a 30-Ton Escort Mobile Crane. The scope involves systematic isolation, fluid evacuation, and extraction from the crane foundation, followed by a complete strip-down and cleaning of all sub-components. A Root Cause Analysis (RCA) shall be conducted to identify the source of abnormal rubbing noise, followed by replacement of all damaged, worn/defective components , specifically including required set(s) of all bearings, clutch discs, pistons, seal kits, solenoids, and charging pumps of Transmission as per the list available at Sl.No. 3 of Section - VIII (Part No: 4264760/OVRKT) and other required OEM spares. Re-assembling to precision, ensuring internal clearances and backlash are calibrated to OEM tolerances, with all fasteners secured via a calibrated torque wrench as per manufacturer’s torque profiling standards, finishing the job with post-installation system priming, hydraulic pressure stability verification, and post repair road trail run with full-load test commissioning under EIC / his authorised supervision including cost of all labor, specialized service charges, overhauling charges, material freight, lodging /boarding charges of service engineers , GST/applicable taxes & while the provision of heavy lifting equipment (forklift/crane) for removal/installation of Gear Boxes from the Crane, shall be provided by the department on Free of Cost. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.31 MB
BOQ_949745.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid