| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-Finance | ₹4.1 L | L1 | Accepted-Finance LESS |
| 2 | L2₹4.2 L+₹12,609.85 (3.11%)Rejected-Finance | ₹4.2 L+₹12,609.85 (3.11%) | L2 | Rejected-Finance MORE |
| 3 | L3₹4.2 L+₹14,194.29 (3.50%)Rejected-Finance | ₹4.2 L+₹14,194.29 (3.50%) | L3 | Rejected-Finance MORE |
| 4 | L4₹4.2 L+₹16,919.81 (4.17%)Rejected-Finance | ₹4.2 L+₹16,919.81 (4.17%) | L4 | Rejected-Finance MORE |
| Sl No | Description | Qty | Unit | M.Rajendran L3 | K SUBRAMANIAN L2 | CHITHRAVARSINI AND CO L1 | S.Manimegalai L4 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling the Old Damaged Cement Concrete as per the direction of the departmental officers. | 30 | M3 | 490 ₹14,700 | 486 ₹14,580 | 480 ₹14,400 Lowest | 487 ₹14,610 |
| 2.00 | Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS | 90.99 | M3 | 190 ₹17,289.05 | 185 ₹16,834.07 | 180 ₹16,379.1 Lowest | 190 ₹17,289.05 |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 16 | M3 | 5,350 ₹85,600 | 5,306 ₹84,896 | 5,200 ₹83,200 Lowest | 5,309 ₹84,944 |
| 4.00 | Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4
Feet) | 322 | M2 | 277 ₹89,194 | 270 ₹86,940 | 265 ₹85,330 Lowest | 275 ₹88,550 |
| 5.00 | Cement concrete 1:3:6 (one cement, three sand and six aggregater) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS | 17 | M3 | 5,800 ₹98,614.5 | 6,010 ₹1,02,185.02 | 5,650 ₹96,064.12 Lowest | 6,015 ₹1,02,270.04 |
| 6.00 | Plastering with cement mortar 1: 5 mix (One cement and five sand) 12 mm thick including cost and conveyance of all materials,finishing,curing,and all labour chargesetc.completeas Standard specification. | 348 | M2 | 275 ₹95,700 | 271 ₹94,308 | 265 ₹92,220 Lowest | 275 ₹95,700 |
| 7.00 | Conveyance of the excavated earth work and including all cost etc complete., | 114.99 | M3 | 165 ₹18,974.17 | 163 ₹18,744.18 | 159 ₹18,284.2 Lowest | 169 ₹19,434.15 |
| 8.00Add :- GST @ 18% | |||||||
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
18 Sept 2024, 3:00 pmClosed
The Assistant Commissioner , East Zone
The Assistant Commissioner, East Zone, Coimbatore Corporation,Singanallur, Coimbatore - 641005
Reconstruction of Storm water Drain at Udayampalayam area in ward No.50, East Zone
2024_MAWS_483073_14
E5/EASTZONE/2024
Open Tender
Civil Works - Others
Works
90 days
East Zone, Coimbatore Corporation, Singanallur
As Per Tender Conditions.
4 documents required · 4 mandatory
₹0
₹5,000
14 May 2026
12 Sept 2024
19 Sept 2024
12 Sept 2024
18 Sept 2024
12 Sept 2024
Amount
Dismantling the Old Damaged Cement Concrete as per the direction of the departmental officers.
Earth work excavation in all soils and sub soils to full depth as may be directed by the departmental officers except in hard rock requiring blasting but inclusive of shoring, strutting and balling out water wherever nessasary and depositing the surplus earth within initial lead of 10 metre and initial lift of 2 metre etc., complete as per Standard specifications SS
Cement concrete 1:4:8 (one cement, four sand and eight aggregater) using 40mm BSS HBG metal including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Centering with steel centering for revetment, drain and culvert upto 1.20m depth using MS sheet of size 0.90X0.60m 10 gauge thick and stiffened with MS 'L' angle wood runners of size 0.075 X 0.05 three rows with support by casurina pullys 0.075 cm at 0.45 m length including cost of nails etc., Area. 10.80 sq.mtr (upto 4 Feet)
Cement concrete 1:3:6 (one cement, three sand and six aggregater) using 20mm BSS HBG metal and including cost of all materials and labour charges for mixing, laying, compacting and curing etc, complete as per SS
Plastering with cement mortar 1: 5 mix (One cement and five sand) 12 mm thick including cost and conveyance of all materials,finishing,curing,and all labour chargesetc.completeas Standard specification.
Conveyance of the excavated earth work and including all cost etc complete.,
Add :- GST @ 18%
K SUBRAMANIAN (BID ID -1139365)
M.Rajendran (BID ID -1139397)
S.Manimegalai (BID ID -1139218)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.98 MB
E5-2024-SWD-EZ.pdf
Tender Documents • 1.25 MB
BOQ_574439.xls
BOQ • 0.27 MB
E5-ITB-EZ.pdf
Additional Documents • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .