Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.5 LAccepted-Finance | ₹44.5 L | L1 | Accepted-Finance AS per BOQ comparative statement generated |
| 2 | L2₹52.3 L+₹7.8 L (17.4%)Accepted-Finance CHUCHOT GONGMA | ₹52.3 L+₹7.8 L (17.4%) | L2 | Accepted-Finance AS per BOQ comparative statement generated |
| 3 | L3₹56.5 L+₹12.0 L (26.9%)Accepted-Finance | ₹56.5 L+₹12.0 L (26.9%) | L3 | Accepted-Finance AS per BOQ comparative statement generated |
| 4 | L4₹59.0 L+₹14.5 L (32.6%)Accepted-Finance R O BOGDANG | ₹59.0 L+₹14.5 L (32.6%) | L4 | Accepted-Finance AS per BOQ comparative statement generated |
Tender Value
₹84.3 L
EMD Value
₹2.0 L
Closing Date
6 Jul 2026, 4:00 pmClosed
Executive Engineer InFC division Leh
Office of the Executive Engineer InFC division Leh
Construction of irrigation canal Chesgon to Command Area Tsogtot.(Under Capex)
2026_PWD_19086_2
16 of I and FC Division Leh 2026-27
Open Tender
Civil Works - Canal
Percentage
90 days
LEH
Please refer to tender document
2 documents required · 2 mandatory
₹2,000
Payable To Executive Engineer InFC division Leh
₹2.0 L
10 Jul 2026
19 Jun 2026
8 Jul 2026
19 Jun 2026
6 Jul 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic excavator) over areas
(exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including
getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as
directed by Engineer-in-charge. | 374.85 | Cum | 208.42 | ₹78,126.24 |
| 2 | Dry stone pitching (any thickness) excluding cost of stones.
A. On Horizontal | 45 | Cum | 1,258.05 | ₹56,612.25 |
| 3 | B. On Top copings of banks | 36 | Cum | 1,437.44 | ₹51,747.84 |
| 4 | C. On Slopes | 90 | Cum | 1,545.08 | ₹1,39,057.2 |
| 5 | Reinforced cement concrete work in beams, suspended floors, roofs having
slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window
sills, staircases and spiral stair cases above plinth level up to floor five level,
excluding the cost of centering, shuttering, finishing and reinforcement, with
1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm
nominal size). | 113.5 | Cum | 11,551.66 | ₹13,11,113.41 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for : A.Foundations, footings, bases for columns. | 6.3 | Sqm | 306.15 | ₹1,928.75 |
| 7 | B. Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 255 | Sqm | 635.45 | ₹1,62,039.75 |
| 8 | Steel reinforcement for R.C.C. work including straightening, cutting, bending,
placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 13,620 | Kg | 109.33 | ₹14,89,074.6 |
| 9 | Providing and laying in-situ concrete lining using M-10 nominal mix concrete
(max. size of aggregates: 20mm nominal). A.Nallah Stone | 120 | Cum | 6,787.54 | ₹8,14,504.8 |
| 10 | B. On Horizontal (Nallah Stone) | 60 | Cum | 6,801.23 | ₹4,08,073.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_45494.xls
BOQ • 0.28 MB
corri25.pdf
PDF • 0.59 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .