| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹3.0 LAdmitted-Finance 233 CHITTARANJAN COLONY MAIL 9 1 NEW SOUTH PARK 700092 | KOLKATA | WEST BENGAL | 700092 | +0.00% | ₹3.0 L | L1 | Admitted-Finance |
| 2 | L2₹3.1 L+₹8,608 (2.88%)Admitted-Finance | +2.88% | ₹3.1 L+₹8,608 (2.88%) | L2 | Admitted-Finance |
| 3 | L3₹3.1 L+₹11,925 (3.99%)Admitted-Finance 17B GOBINDA GHOSHAL LANE KOLKATA 700025 | KOLKATA | WEST BENGAL | 700025 | +3.99% | ₹3.1 L+₹11,925 (3.99%) | L3 | Admitted-Finance |
Tender Value
₹3.0 L
EMD Value
₹6,000
Closing Date
12 Sept 2026, 1:00 pmClosed
EE CIVIL BR X
28, PRINCE ANWAR SHAH ROAD, KOLKATA-700033
MAINTENANCE OF ASPHALTUM ROAD NEAR 42A, 45/35 MOORE AVENUE ETC IN WARD-097, BR-X
2026_KMC_1040119_1
X/097/005/2026-2027
Open Tender
CIVIL WORKS
Percentage
90 days
WARD-97
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹6,000
15 Sept 2026
2 Sept 2026
15 Sept 2026
2 Sept 2026
12 Sept 2026
2 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 50 | MTR | 8.17 | ₹408.5 |
| 2 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 50 | MTR | 8.17 | ₹408.5 |
| 3 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 50 | MTR | 21.34 | ₹1,067 |
| 4 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 50 | MTR | 18.24 | ₹912 |
| 5 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation.(a) 1:3:6 proportion ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.23 & 3rd Corrigenda Addenda dtd-04.06.18, P-9 & 10) | 1.69 | M3 | 4,761 | ₹8,034.19 |
| 6 | Box cutting or filling in Road embankment in all sorts of soil including spreading the spoils properly over the flank as necessary or on berm to approximate grade & camber and rolling the sub-grade with power roller to proper camber and grade as per direction and satisfaction of Engineer-in-charge including uprooting and removing plants and jungles when and where necessary. (a) Depth up to 150 mm. | 83.48 | SQM | 14.4 | ₹1,202.11 |
| 7 | Picking up and removing old bituminous layer or sand sealing coat from old black topped surface and cleaning the exposed surface by scraping and stacking the material as directed. (a) By manual means : (i) From 25 mm to 50 mm thick. | 1,810.78 | SQM | 22.6 | ₹40,923.63 |
| 8 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (c) For Silver Sand | 2.32 | M3 | 990.4 | ₹2,299.21 |
| 9 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints with local sand. ( Ref :PWD (Bldg.)-2017, It. No. 1, Page No.14 & 3rd Corrigenda Addenda dtd-04.06.18,P-1) | 60.98 | SQM | 361 | ₹22,013.78 |
| 10 | Water Bound Macadam Sub Base by consolidating Jhama metal / Laterite chelly or stone metal / shingles of specific size in hard crust to requisite thickness (measured after compaction) in layers including screening of metals etc. as necessary, hand packing, sweeping, watering and rolling in stages with power roller to proper line, grade and camber, lighting, guarding & barricading and making necessary earthen bundh of one metre width on each side where necessary to protect edges and preparing the bed by necessary cutting or filling and rolling all complete including the cost of all materials and hire and labour charges of all men and machineries and compacting to the required density, as per Clause 404 of Specifications for Road & Bridge Works of MoRT&H (5th Revision). (i) For Construction of Sub Base by consolidating Jhama metal / Laterite (63 mm to 45 mm) (Moorum replaced with course sand) (For compacted thickness 75mm) | 341.74 | SQM | 188.23 | ₹64,326.47 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
tenderform.pdf
Tender Documents • 0.15 MB
civil.pdf
Additional Documents • 4.88 MB
BOQ_2554276.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .