| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.6 LAccepted-AOC 150 1ST STREET THOTTILPATHY SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹9.6 L Quoted ₹10.4 L | 1 | Accepted-AOC L1 |
| 2 | 2₹12.1 LRejected-AOC M 46 HOUSING BOARD UNIT MATHAYANKUTTAI METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | ₹12.1 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | SATHISH ENGINEERING L1 | MINO AND CO L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for arresting the coal pipe firmly, dismantling victaulic coupling and lowering down the mill outlet elbows to 4.5 m. floor including charges for scaffolding. | 24 | Nos | 4,540 ₹1.1 L | 5,000 ₹1.2 L |
| 2.00 | Charges for inspection of mill outlet elbows and changing the deflector block if any lifting the elbows and assembling with proper alignment with the existing pipe line and removing coal pipe supports and devolution of scraps to stores. | 24 | Nos | 4,540 ₹1.1 L | 5,000 ₹1.2 L |
| 3.00 | Charges for including drawl of materials from stores and removal of old eroded coal pipe after arresting the coal pipes firmly and providing necessary supports or platform and welding coal pipe pieces in MOE/coal pipes below MOE / MPO & Transition piece devolution of scraps to stores. | 50 | m2 | 342 ₹17,100 | 400 ₹20,000 |
| 4.00 | Charges for dismantling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures including transportation of supporting material from stores to site and re-fixing the Spool piece, MPO bodies and transition pieces and assembling to its original position and carrying out necessary related works. and devolution of scraps to stores etc. for a mill.(2A to 2F) | 6 | mills | 30,040 ₹1.8 L | 31,000 ₹1.9 L |
| 5.00 | Charges for removal of orifice 1 No. after dismantling the victaulic coupling, inspecting and inverting the same orifice or new orifice and assembling in position. | 10 | Nos | 650 ₹6,500 | 700 ₹7,000 |
| 6.00 | Cutting the worn out coal pipes of varied length grinding edges and welding with coal pipe collars in the respective area inclusive of cutting the spare coal pipe of same length and transporting of pipe from stores and devolution of scraps to stores.(Vertical portion) | 3 | Nos | 10,600 ₹31,800 | 11,000 ₹33,000 |
| 7.00 | Charges for hard facing of vertical coal pipe inside body in lengthwise and circle wise at 25 mm distance, 2 runs overlapping. | 24 | Nos | 10,700 ₹2.6 L | 12,000 ₹2.9 L |
| 8.00 | Cost of MS Welding electrodes | 25.1 | Kgs | 125 ₹3,137.50 | 150 ₹3,765 |
| 9.00 | Cutting gas | 2.1 | Sets | 4,700 ₹9,870 | 5,000 ₹10,500 |
| 10.00 | 3mm non-metallic gasket | 120 | Kgs | 280 ₹33,600 | 400 ₹48,000 |
Tender Value
Refer Docs
EMD Value
₹8,900
Closing Date
22 Oct 2024, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit II Dismantling patch welding and assembling of Mill outlet elbows orifices Transition pieces fabrication of spool piece Multiple port outlets etc Hard facing of vertical coal pipe 1mtr length after Transition piece 24 Nos
2024_EB_492055_1
CE / MTPS-I / SE / M-I / MP /OT.218 / 2024-25
Open Tender
Power/Energy Projects/Products
45 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹8,900
Yes
21 May 2026
8 Oct 2024
23 Oct 2024
8 Oct 2024
22 Oct 2024
8 Oct 2024
Amount
Charges for arresting the coal pipe firmly, dismantling victaulic coupling and lowering down the mill outlet elbows to 4.5 m. floor including charges for scaffolding.
Charges for inspection of mill outlet elbows and changing the deflector block if any lifting the elbows and assembling with proper alignment with the existing pipe line and removing coal pipe supports and devolution of scraps to stores.
Charges for including drawl of materials from stores and removal of old eroded coal pipe after arresting the coal pipes firmly and providing necessary supports or platform and welding coal pipe pieces in MOE/coal pipes below MOE / MPO & Transition piece devolution of scraps to stores.
Charges for dismantling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures including transportation of supporting material from stores to site and re-fixing the Spool piece, MPO bodies and transition pieces and assembling to its original position and carrying out necessary related works. and devolution of scraps to stores etc. for a mill.(2A to 2F)
Charges for removal of orifice 1 No. after dismantling the victaulic coupling, inspecting and inverting the same orifice or new orifice and assembling in position.
Cutting the worn out coal pipes of varied length grinding edges and welding with coal pipe collars in the respective area inclusive of cutting the spare coal pipe of same length and transporting of pipe from stores and devolution of scraps to stores.(Vertical portion)
Charges for hard facing of vertical coal pipe inside body in lengthwise and circle wise at 25 mm distance, 2 runs overlapping.
Cost of MS Welding electrodes
Cutting gas
3mm non-metallic gasket
Hyseal compound 30.45(Dum Dum Putty)
Cost of Hard facing Welding electrode
Cost of refractory
Charges for consumables and T& Ps.
MINO AND CO (BID ID -1166905)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.71 MB
BOQ_584588.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid