Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.6 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹12.3 L+₹72,225.75 (6.22%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹12.9 L+₹1.2 L (10.8%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | ||
| 4 | L4₹13.8 L+₹2.2 L (18.8%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
30 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Kupwara
Executive Engineer RnB Division Sulkote Kupwara
Upgrdation/Repairment of Halmathpora to Quasashi Mohalla road
2026_PWDJK_325953_5
NIT No. 53 of 2026-27 of RnB Division Kupwara
Open Tender
Civil Works
Item Rate
21 days
Halmathpora
Please refer Tender documents.
2 documents required · 2 mandatory
₹800
Executive Engineer RnB Division Kupwara
₹40,000
1 Oct 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
30 Sept 2026
25 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying in position specified grade of reinforced cement concrete includingcuring but excluding the cost of centering, shuttering, finishing and reinforcement. Allworks upto plinth level
1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 163.7 | cum | 7,788.4 | ₹12,74,961.08 |
| 2 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level | 4,747.37 | kg | 123 | ₹5,83,926.51 |
| 3 | Providing and laying of dry stone soling (hand packed tightly ) in consolidated and ramming, including all leads, lifts all carriage complete job . | 109.14 | cum | 1,000 | ₹1,09,140 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form work | 89.7 | sqm | 286.35 | ₹25,685.6 |
| 5 | Engagment of JCB | 7 | Hrs | 1,000 | ₹7,000 |
stage.html
html • 0.02 MB
finance_1101976.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.51 MB
BOQ_1101976.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .