| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC CHANDIGARH | ₹1.1 Cr | L1 | Accepted-AOC Agency Quoted less than departments justify rates. |
| 2 | L2₹1.1 Cr+₹70,372.71 (0.64%)Rejected-Finance CHANDIGARH | CHANDIGARH | CHANDIGARH | 160001 | ₹1.1 Cr+₹70,372.71 (0.64%) | L2 | Rejected-Finance Agency Quoted less than departments justify rates but on Higher Side |
| 3 | L3₹1.2 Cr+₹6.4 L (5.77%)Rejected-Finance 3582 SECTOR 23 CHANDIGARH | CHANDIGARH | CHANDIGARH | CHANDIGARH | ₹1.2 Cr+₹6.4 L (5.77%) | L3 | Rejected-Finance Agency Quoted less than departments justify rates but on Higher Side |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
27 May 2026, 12:00 pmClosed
Exe. Engineer Roads Division No 3 MC Chandigarh
Exe. Engineer Roads Division No 3 MC Chandigarh
DISMANTLING AND RECONSTRUCTION OF FLOORING OF BACK SERVICE LANE IN SECTOR 22 A, B, C and D, CHANDIGARH
2026_MCC_92271_1
MCC/2026/ROADS-III/04-11
Open Tender
Civil Works - Others
Percentage
180 days
Work
Please refer Tender documents.
8 documents required · 8 mandatory
₹3,000
₹2.3 L
10 Aug 2026
12 May 2026
27 May 2026
12 May 2026
27 May 2026
12 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing concrete manually/ by mechanical means and disposal of material within 50 metres lead as per direction of Engineer in charge.Nominal concrete 1:3:6 or richer mix ( i/c equivalent design mix) (DSR 15.2.1) | - | Cum | - | - |
| 2 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer in charge Nominal concrete 1:4:8 or leaner mix DSR (15.2.2) | - | cum | - | - |
| 3 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. In lime mortar (15.7.3) | - | Cum | - | - |
| 4 | Disposal moorum/building rubbish/malba/similar unservicable, dismantled or waste material by mechanical transport including loading, transporting, unloading to approved muncipal dumping ground for C & D lead upto 10 km for all lifts, complete as per directions of Enginner -in- charge. | - | Cum | - | - |
| 5 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:5:10 (1 cement : 5 manufactured sand derived from Recycled Concrete Aggregate (RCA) : 10 graded stone aggregate 40 mm nominal size Recycled Aggregate (RA) (DSR 4.1.10 A) | - | Cum | - | - |
| 6 | Cement concrete pavement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size), including finishing complete. | - | Cum | - | - |
| 7 | Extra for using 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)instead of 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | - | Cum | - | - |
| 8 | Providing and fixing 5mm thick Asbestos strip of 65 mm thick wide for providing joints in concrete at regular interval including nailing complete in all respect to the entire satisfaction of the Engineer in Charge. | - | Rmt | - | - |
| 10 | Credit of Material
Bricks | - | Nos | - | - |
| 11 | Brick Bats | - | Cum | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 6.33 MB
BOQ_112927.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .