Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹6.4 L+₹19,470 (3.15%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification | |
| 5 | Not Admitted-Fee/PreQual/Technical DUKHERI ROAD DUKHERI VILLAGE DUKHERI ROAD MOHRA AMBALA CANTT AMBALA CANTT AMBALA HARYANA 133004 | AMBALA | HARYANA | 133004 | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | Mehar Enterprises L2 | JAI DURGA ENGINEERS AND CONTRACORS L1 |
|---|---|---|---|---|---|
| 1.01 | Arrangement of all required safety equipment (i.e safety belts, folding ladders, safety helmets, safety shoes, masks, oxygen cylinder etc.) for safety of man power during execution of work. | 1 | Job | 20,500 ₹24,190 | 19,000 ₹22,420 Lowest |
| 1.02 | Making temporary platform for safety working inside the sump for removing the spindles, coupler and gates and removing the same after completion of work. | 2 | Job. | 19,800 ₹23,364 | 19,600 ₹23,128 Lowest |
| 1.03 | Cleaning of sluice gate guide strips with the help of chemical solution, removing of all the dust / rusts etc. greasing the guide strips for free movements. | 2 | Job. | 10,100 ₹11,918 | 9,000 ₹10,620 Lowest |
| 1.04 | Removing of gear box & head stocks by cutting and opening of nut bolt etc. with the help of gas cutter/welding set, manual labour & long boom crane etc. | 2 | Job. | 10,000 ₹11,800 | 9,000 ₹10,620 Lowest |
| 1.05 | Cutting & removing of central coupler of spindles pin/nut bolt etc inside the main inlet sump with the help of making temporary arrangement of Jhula /temporary platform etc. as required. | 2 | Job. | 19,800 ₹23,364 | 19,700 ₹23,246 Lowest |
| 1.06 | Cutting of lower coupler pins, nut bolts etc. with the help of gas cutter, welding set, manual labour & crane etc. as required inside the sump having 30 feet deep and having gas & sewage flow. | 2 | Job. | 41,000 ₹48,380 | 38,000 ₹44,840 Lowest |
| 1.07 | Removing both the spindle outside the sump with the help of mobile crane. The job include the provision of hanging the sluice gate at its position with the help of suitable size of SS/MS chain till re-installation of the same at its place | 2 | Job. | 19,800 ₹23,364 | 18,400 ₹21,712 Lowest |
| 1.08 | Repairing of S.S. spindle i/c remetalling, turning, re-threading & polishing etc. as required. | 2 | Job. | 16,200 ₹19,116 | 15,200 ₹17,936 Lowest |
| 1.09 | Cutting the lower spindle upto appropriate size for opening of complete sluice gate upto the crown of the puddle/trunk sewer for free flow of raw sewage. Making the new threads for coupling the same and providing 2 Nos. nut bolts/pins 12 mm dia. And coupler of appropriate size. | 2 | Job. | 29,600 ₹34,928 | 28,000 ₹33,040 Lowest |
| 1.10 | Making & fixing the SS pin of required size for lower coupler at sluice gate with nut bolts and washer. The job includes the fixing of the same with sluice gates inside the sump. | 2 | Job. | 23,000 ₹27,140 | 22,500 ₹26,550 Lowest |
Tender Value
Refer Docs
EMD Value
₹12,800
Closing Date
7 Nov 2025, 3:00 pmClosed
EE(SDW)VI
Delhi Jal board WSTP Keshopur
Repair / Renovation of flow controlling system of Trunk Sewer at main sump of 20 and 40 MGD STP Keshopur. (RE-invited)
2025_DJB_280457_6
NIT NO. 11 (2025-2026) EE(SDW)VI
Open Tender
Miscellaneous Works
Works
30 days
Delhi Jal board WSTP Keshopur
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
As per NIT
₹12,800
Yes
21 Nov 2025
30 Oct 2025
7 Nov 2025
30 Oct 2025
7 Nov 2025
30 Oct 2025
Arrangement of all required safety equipment (i.e safety belts, folding ladders, safety helmets, safety shoes, masks, oxygen cylinder etc.) for safety of man power during execution of work.
Making temporary platform for safety working inside the sump for removing the spindles, coupler and gates and removing the same after completion of work.
Cleaning of sluice gate guide strips with the help of chemical solution, removing of all the dust / rusts etc. greasing the guide strips for free movements.
Removing of gear box & head stocks by cutting and opening of nut bolt etc. with the help of gas cutter/welding set, manual labour & long boom crane etc.
Cutting & removing of central coupler of spindles pin/nut bolt etc inside the main inlet sump with the help of making temporary arrangement of Jhula /temporary platform etc. as required.
Cutting of lower coupler pins, nut bolts etc. with the help of gas cutter, welding set, manual labour & crane etc. as required inside the sump having 30 feet deep and having gas & sewage flow.
Removing both the spindle outside the sump with the help of mobile crane. The job include the provision of hanging the sluice gate at its position with the help of suitable size of SS/MS chain till re-installation of the same at its place
Repairing of S.S. spindle i/c remetalling, turning, re-threading & polishing etc. as required.
Cutting the lower spindle upto appropriate size for opening of complete sluice gate upto the crown of the puddle/trunk sewer for free flow of raw sewage. Making the new threads for coupling the same and providing 2 Nos. nut bolts/pins 12 mm dia. And coupler of appropriate size.
Making & fixing the SS pin of required size for lower coupler at sluice gate with nut bolts and washer. The job includes the fixing of the same with sluice gates inside the sump.
Hiring of long boom crane to carry out all works safety.
Repairing of guide channels & strips etc. for smooth operation of gate with oiling & greasing the same.
Breaking the RCC block for sluice gate fully opened with the help of pneumatic hammer etc. inside the sump having sewage flow and foul gases.
Repair of gear box, providing & fixing of bush, nut spindle etc. for smooth operation of gear box & sluice gates.
Providing & fixing of thrust bearing. (2 Nos. each gear box).
Providing and fixing of MS bracket (2 Nos for each sluice gate) of required shape and size for smooth and in position proper movement of spindle of sluice gate
Reassembling of sluice gates with both spindles, both couplers, coupler pins, gear box, head stock etc. on their positions and testing commissioning of the same for smooth operation and openings etc.
Painting the complete system with one coat of epoxy primer and two coats of enamel paint after cleaning the surface area.
Transportation, loading & unloading charges of men and material both side To & Fro.
Mehar Enterprises (BID ID -1636496)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.13 MB
BOQ_370213.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .