Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹36.9 L
EMD Value
₹73,800
Closing Date
16 Nov 2026, 6:00 pm6d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
GE (SB) KARWAR
GARRISON ENGINEER (SEABIRD) KARWAR Naval Base, Sankrubagh (PO) Karwar - 581308
SPECIAL REPAIRS TO WASHROOMS AT FIRST FLOOR AND SECOND FLOOR OF SUNKEN TREATMENT OF BUILDING P-05 OF SITE A2 AT NAVAL BASE AREA KARWAR
2026_MES_791672_1
8547/E8
Open Tender
Civil Works
Item Rate
180 days
GE (SB) KARWAR
AS PER NIT
8 documents required · 8 mandatory
₹500
GE (SB) KARWAR
₹73,800
Yes
16 Nov 2026
19 Oct 2026
18 Nov 2026
19 Oct 2026
16 Nov 2026
2 Nov 2026
19 Oct 2026 - 26 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of concrete of any description and in any position, not otherwise specifically provided for, including removal of debris to MoD land, complete all as specified and directed by the Engineer-in-Charge.
(i) Before quoting the tender, bidders are advised to ascertain the distance to the MoD land where excavated material/debris is to be disposed of. No extra claim whatsoever shall be entertained on this account.
(ii) This item shall be considered as per site requirements. | 50 | Cum | 1.25 | ₹62.5 |
| 2 | Treatment of sunken floor slab comprising the following specifications, complete all as specified:
(i) M&L for cleaning the sunken/lowered portion of RCC slab surface (including vertical total depth plus skirting height) of floors by wire brushing, chiselling out any mortar sticking to the surface and brooming completely. Provide 40 mm thick average PCC 1:2:4, Type B0, using 12.5 mm graded aggregate as padding concrete to achieve proper slope.
(ii) Rendering of uneven surfaces with 10 mm thick CM 1:4 mixed with integral waterproofing compound as per manufacturer’s instructions. Fill with water and check for dampness and seepage. Where seepage is noticed, nozzles shall be fixed and grouting carried out (WPC shall be measured and paid separately).
(iii) All junction points of side walls where CI/GI pipes pass through shall be sealed with epoxy putty.
(iv) After drying of putty, wash the slab and sides of the sunken portion with water and clean thoroughly.
(v) M&L for applying two coats of polymer-modified cementitious waterproof coating as per manufacturer’s instructions to bottom and vertical sides up to finished floor level +100 mm height. Total thickness of two layers shall be 1 mm. When the second layer is still tacky, coarse sand shall be sprinkled over vertical and bottom surfaces. (This item shall be measured and paid separately.)
(vi) Plaster the bottom and sides up to the bottom of skirting with minimum 20 mm thick CM 1:4 mixed with integral waterproofing compound as per manufacturer’s instructions including rounding of corners and junctions and forming slopes towards spout. (WPC shall be measured and paid separately.)
(vii) All pipes laid in the sunken portion shall be covered with 50 mm thick PCC 1:3:6 all around after applying anti-corrosive paint. (Black paint shall be paid separately.) | 115.28 | Sqm | - | - |
| 3 | M&L for applying two coats of polymer-modified cementitious waterproof coating as per manufacturer’s instructions to bottom and vertical sides up to finished floor level +100 mm height. Total thickness of two layers shall be 1 mm. When the second layer is still sticky, coarse sand spray shall be carried for the vertical and bottom surfaces of the sunken portion, complete all as specified and directed. | 115.28 | Sqm | 1 | ₹115.28 |
| 4 | Supply only integral waterproofing compound, complete all as specified and directed. | 75 | KG | 2 | ₹150 |
| 5 | M&L for PCC in 1:5:10, Type E2 (using 40 mm graded aggregate) as in sunken floor of toilets, complete all as specified and directed. | 50 | Cum | 3 | ₹150 |
| 6 | Demolition of stone slabs and tiles of any description and thickness in floors, aprons, etc., laid, bedded, and pointed in any mortar, complete all as specified and directed. | 91.5 | 10 Sqm | 4 | ₹366 |
| 7 | M&L for green marble 20 mm thick, machine-cut (table rubbed and polished), in steps, jambs, pillars, window sills, cooking platforms, and the like, set in cement mortar (1:4), including pointing in white cement (1:2) using marble dust with admixture of pigment to match shade of slab, including grinding and polishing, complete all as specified and directed. | 15 | Sqm | 5 | ₹75 |
| 8 | M&L for coloured, non-skid, jointless ceramic tiles, 7–8 mm thick, with area of each tile exceeding 0.11 sqm but not exceeding 0.18 sqm, in floors, etc., set and jointed in neat cement slurry and pointed with white or coloured cement to match, including 15 mm thick screed bed in cement mortar 1:4, including taking down old screed bed, complete all as specified and directed. | 150 | Sqm | 6 | ₹900 |
| 9 | M&L for coloured glazed ceramic tiles of size 1200 × 600 mm, 7–8 mm thick, in dado/skirting, set and jointed in neat cement slurry and pointed with white or coloured cement to match, complete all as specified and directed. | 750 | Sqm | 7 | ₹5,250 |
| 10 | M&L for 15 mm thick screed bed in cement mortar 1:4, including taking down old screed bed, complete all as specified and directed. | 750 | Sqm | 8 | ₹6,000 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.43 MB
BOQ_887585.xls
BOQ • 0.33 MB
Tender8547.pdf
Tender Documents • 1.22 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .