| 1 | L1₹69.2 LAccepted-AOC C 9 53 IIND FLOOR SECTOR 08 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | L1 | Accepted-AOC DUE TO L1 BIDDER | |
| 2 | L2₹73.1 L+₹3.9 L (5.59%)Rejected-Finance PLOT NO 79 SIS PARK DICHAON ENCLAVE PP2914 NAJAFGARH SOUTH WEST DELHI NEW DELHI 110043 | WEST DELHI | DELHI | 110043 | L2 | Rejected-Finance OTHER THAN L1 BIDDER |
| Sl No | Description | Qty | Unit | L G BUILDERS L1 | M/S Parmod Johar L2 |
|---|---|---|---|---|---|
| 1.00NOTE:- FOR ALL PAINTING , WATER PROOFING ITEMS AND STRUCTURAL REPAIR ITEMS:- The following precautionary measures shall be ensured by the contractor before and during execution of the work:- (i) All the painting works and water proofing works shall be got executed through original material manufacturing company and their authorised applicators as approved by GE and contractor should submit MOU with the manufacturing company and their authorised applicator alongwith performance guarantee otherwise recovery of Rs 2000.00 per week will be made from the contractors dues from the date of commencement of work. (ii) Submission of MOU will be mandatery requirement before execution of work as the entire work shall be executed with the approved firm only. (iii) Contractor shall give guarantee from OEM of 5 years for effectiveness of painting carried out by them from the certified date of completion of work. (iv) Contractor shall deposit entire quantity of material(proprietory materials) in sealed containers required for painting works covered under subject contract in the custody of Engineer-in-Charge. | |||||
| 1.01(v) The materials as required shall be issued to contractor by JE/Engineer-in-Charge on daily basis and the empty containers/bags shall be deposited in the store of Engineer-in-Charge by the contractor,for verification as per standard consumption/coverage prescribed by the manufactures. (vi) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor,glasses and joinery. (vii) The work shall be executed in multy storey buildings up to Eight storey height and cost of suitable scaffolding,Mechanical Suspended Platform and Safety Net shall be deemed to be included in quoted rates by the tenderer as directed. (viii) During the execution of work, in case of any damages such as the GAS PIPE LINE or water supply, cable etc. the contractor will have to got it repaired/replaced at his own cost and nothing will be paid extra on account and all these items wii be removed/repaired by contractor at their cost. (ix) All the Demolished bldg material wil be removed outside MOD land by the contractor at his own expenses. The rate of removal is deened to be included in unit rate quated. | |||||
| 1.02(x) The contractor shall provide all safety equipments as per IS standards to labours. (xi) The work will be carried out in following steps as appended below:- | |||||
| 1.03 | M&L for complete removal of old existing treatment of wall(external/internal) and ceiling finished using mechanical dry wall sander machine (having mechanical vacuum mechanism) having RPM not less than 1500,sanding pad of 320 grit or above to completely remove old existing treatment for wall and ceiling surface and ready to take new surface finishes complete all as specified and directed. | 29,008 | Sqm | 15 ₹4,35,120 | 10 ₹2,90,080 Lowest |
| 1.04 | M&L for applying waterproof cement based putty @0.8 kg(undiluted) per sq mtr. Of average thickness 2.5mm in two coats on prepared wall(external/internal) and ceiling surfaces as per sr item No 1.00 above in the following steps:-
(i) Filling cracks in wall using crack seal compound Asian smart care crack seal or equivalent.
(ii) Mix the putty powder @ 0.8 kg/sqm by adding 35to40% water by volume or as per approved manufacturer's instruction and mix it with electric putty mixer with the mixing capacity of min 2.5 kg putty per minute upto 5to10 minutes.
(iii) Apply the first coat of the prepared mix with the help of fully automatic airless spary machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI with bottom to top configuration and allow 6-8 hrs to dry the putty surface.
(iv) Apply the second coat of the prepared mix with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI with horizontal configuration. | 29,008 | Sqm | 35 ₹10,15,280 Lowest | 50 ₹14,50,400 |
| 1.05(v) Allow 6-8 hrs to dry putty surface then prepare the surface by electronic wall sander machine to apply subsequent coats of primer complete all as specified and directed. Note:- Primer shall be measured and paid seperately under relevant item. | |||||
| 1.06 | M&L for applying one coat of acrylic water based exterior grade/interior grade primer @0.9ltr(undiluted)/10 sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI on prepared and wall (external) surfaces as per srl item no.1.03 and 1.04 above.Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. | 29,008 | Sqm | 55 ₹15,95,440 | 10 ₹2,90,080 Lowest |
| 1.07 | M&L for applying two coats of anti fungal weather proof grade exterior acrylic emulsion paint of approved tint @1.8 ltrs/10sqm(undiluted) or as per approved manufacturer's instruction over prepared and primed surface of external wall as per srl item No. 1.03 to 1.04 above. Allow 6-8 hrs to dry the surface in subsequent coats of paint complete all as specified and directed. | 21,456 | Sqm | 85 ₹18,23,760 Lowest | 135 ₹28,96,560 |
| 1.08 | M&L for applying two coats of oil bound emulsion distemper on prepared and primed wall (internal) and ceiling surfaces as per sr item No 1.03 & 1.04 above of approved tint including priming with alkali resistant primer complete all as specified and direct | 7,552 | Sqm | 45 ₹3,39,840 Lowest | 50 ₹3,77,600 |
| 2.00 | Demolition of brick work built in cement mortar including all quoins, arches, pillars etc including rubbish off the premises beyond MOD land complete all as specified and directed. | 14.5 | Cum | 400 ₹5,800 Lowest | 500 ₹7,250 |
Tender Value
₹80 L
EMD Value
₹1.4 L
Closing Date
25 Jul 2026, 6:00 pmClosed
CWE NO 2 DELHI CANTT
HQ CWE NO 2 DELHI CANTT PIN-110010
STRUCTUARL REPAIRS AND SMART PERIODICAL SERVICES TO CERTAIN BLDGS IN OFFRS FAFA MD ACCN IN THE AREA OF AGE B/R-II UNDER GE(WEST) DELHI CANTT-10
2026_MES_773405_1
8662/WEST/TOKEN-09/2026-27/E8
Open Tender
Civil Works
Item Rate
180 days
GE WEST DELHI CANTT
ALL AS PER NIT DOCUMENTS
8 documents required · 8 mandatory
₹1,000
Yes
GE WEST DELHI CANTT-10
₹1.4 L
Yes
22 Sept 2026
20 Jun 2026
27 Jul 2026
20 Jun 2026
25 Jul 2026
11 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | (v) The materials as required shall be issued to contractor by JE/Engineer-in-Charge on daily basis and the empty containers/bags shall be deposited in the store of Engineer-in-Charge by the contractor,for verification as per standard consumption/coverage prescribed by the manufactures.
(vi) After completion of painting work contractor shall remove and clean all the droplets/stain of paint left on the floor,glasses and joinery.
(vii) The work shall be executed in multy storey buildings up to Eight storey height and cost of suitable scaffolding,Mechanical Suspended Platform and Safety Net shall be deemed to be included in quoted rates by the tenderer as directed.
(viii) During the execution of work, in case of any damages such as the GAS PIPE LINE or water supply, cable etc. the contractor will have to got it repaired/replaced at his own cost and nothing will be paid extra on account and all these items wii be removed/repaired by contractor at their cost.
(ix) All the Demolished bldg material wil be removed outside MOD land by the contractor at his own expenses. The rate of removal is deened to be included in unit rate quated. | - | - | - | - |
| 1.02 | (x) The contractor shall provide all safety equipments as per IS standards to labours.
(xi) The work will be carried out in following steps as appended below:- | - | - | - | - |
| 1.03 | M&L for complete removal of old existing treatment of wall(external/internal) and ceiling finished using mechanical dry wall sander machine (having mechanical vacuum mechanism) having RPM not less than 1500,sanding pad of 320 grit or above to completely remove old existing treatment for wall and ceiling surface and ready to take new surface finishes complete all as specified and directed. | 29,008 | Sqm | - | - |
| 1.04 | M&L for applying waterproof cement based putty @0.8 kg(undiluted) per sq mtr. Of average thickness 2.5mm in two coats on prepared wall(external/internal) and ceiling surfaces as per sr item No 1.00 above in the following steps:-
(i) Filling cracks in wall using crack seal compound Asian smart care crack seal or equivalent.
(ii) Mix the putty powder @ 0.8 kg/sqm by adding 35to40% water by volume or as per approved manufacturer's instruction and mix it with electric putty mixer with the mixing capacity of min 2.5 kg putty per minute upto 5to10 minutes.
(iii) Apply the first coat of the prepared mix with the help of fully automatic airless spary machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI with bottom to top configuration and allow 6-8 hrs to dry the putty surface.
(iv) Apply the second coat of the prepared mix with the help of fully automatic airless spray machine of putty application having flow speed of max 6 ltrs per minutes with a maximum pressure 3300 PSI with horizontal configuration. | 29,008 | Sqm | - | - |
| 1.05 | (v) Allow 6-8 hrs to dry putty surface then prepare the surface by electronic wall sander machine to apply subsequent coats of primer complete all as specified and directed.
Note:- Primer shall be measured and paid seperately under relevant item. | - | - | - | - |
| 1.06 | M&L for applying one coat of acrylic water based exterior grade/interior grade primer @0.9ltr(undiluted)/10 sq mtrs diluted with water in 1:1 ratio to be applied with fully automatic airless spray machine of paint application with a flow speed of min 1 ltr per minute having a pressure of 3300 PSI on prepared and wall (external) surfaces as per srl item no.1.03 and 1.04 above.Allow 6-8 hrs to dry the surface for painting of subsequent coats complete all as specified and directed. | 29,008 | Sqm | - | - |
| 1.07 | M&L for applying two coats of anti fungal weather proof grade exterior acrylic emulsion paint of approved tint @1.8 ltrs/10sqm(undiluted) or as per approved manufacturer's instruction over prepared and primed surface of external wall as per srl item No. 1.03 to 1.04 above. Allow 6-8 hrs to dry the surface in subsequent coats of paint complete all as specified and directed. | 21,456 | Sqm | - | - |
| 1.08 | M&L for applying two coats of oil bound emulsion distemper on prepared and primed wall (internal) and ceiling surfaces as per sr item No 1.03 & 1.04 above of approved tint including priming with alkali resistant primer complete all as specified and direct | - | Sqm | - | - |
| 2Demolition of brick work built in cement mortar including all quoins, arches, pillars etc including rubbish off the premises beyond MOD land complete all as specified and directed. | |||||
| 3 | M&L for brick work with sub class 'B' Burnt bricks (old size) straight or curved on plan exc 6m mean radius and built in CM 1:6 complete all as specified and directed. | 2 | Cum | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.32 MB
TENDER.pdf
Tender Documents • 0.89 MB
BOQ_865995.xls
BOQ • 0.84 MB
AMDT.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .