| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical MUGALGARHI MAJRA FULRAI TEHSEEL SIKANDRARAO HATHRAS | Accepted-Technical AS PER TECHNICAL BID PAPER |
| 2 | Accepted-Technical | Accepted-Technical AS PER TECHNICAL BID PAPER |
| 3 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-REASON FOR CONTRACTOR LETTER |
Tender Value
₹1.1 Cr
EMD Value
₹2.2 L
Closing Date
12 May 2026, 3:00 pmClosed
se bundelkhand circle upavp jhansi
se bundelkhand circle upavp jhansi
TOURISM DEVELOPMENT AND BEAUTIFICATION OF PRACHIN GANESH MANDIR AND BANKHANDI SHRI SHAKTIPEETH AT KALPI DISTT. JALAUN (UP)
2026_UPHDB_1140318_1
136/ac-3/12 date 16.04.2026 si 15
Open Tender
Civil Works
90 days
PRACHIN GANESH MANDIR AND BANKHANDI SHRI SHAKTIP
Please refer Tender documents.
4 documents required · 4 mandatory
₹5,310
EXECUTIVE ENGINEER CD BUNDELKHAND 01 UPAVP JHANSI
₹2.2 L
Yes
22 May 2026
22 Apr 2026
12 May 2026
22 Apr 2026
12 May 2026
22 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1DETAILED ESTIMATE FOR THE PROPOSED TOURISM DEVELOPMENT AND BEAUTIFICATION OF PRACHIN GANESH MANDIR AT KALPI DISTT. JALAUN (UP) | ||||||
| 0.999 | Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.50 meter and lead upto 30 meter and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and sides of foundation trenches or into the plinth and removal and disposal of sur-plus earth as directed by the Engineer incharge up to a distance of 30 meters from the foundation trenches. DAR 2.6.1 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 0.999 | Supplying and filling in plinth with sand under floors, including watering, ramming, consolidating and dressing complete. DSR 2.27 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 0.999 | Providing and laying cement concrete 1:4:8 (1 cement :4 coarse sand :8 graded Stone aggregate 40 mm nominal size) including supply of all materials, labour T & P rtc required for proper completion of the work and curing complete also including cost of formwork in foundation & floors. (DSR-4.1.8) | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 0.999 | Treatment of soil under existing floors using chemical emulsion @ one litre per hole, 300 mm apart including drilling 12 mm diameter holes and plugging with cement mortar 1 :2 (1 cement : 2 Coarse sand) to match the existing floor:With Chlorpyriphos/Lindane E.C. 20% with 1% concentration DSR 2.35.3.1 | - | SQM | - | - | BI01010001010000000000000515BI0100001113 |
| 0.999 | Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift. DSR 2.25(a) | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
| 0.999 | Boring with hydraulic piling rigs with power units, providing and installing cast in situ single under reamed piles of specified diameter and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the length of the pile to be embedded in pile cap etc. all complete. (Length of pile for payment shall be measured upto to the bottom of pile cap) : 300 mm dia piles DSR 20.3.1 | - | RM | - | - | BI01010001010000000000000515BI0100001113 |
| 0.999 | Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. 1.Initial test DSR 20.6.1 | - | NOS | - | - | BI01010001010000000000000515BI0100001113 |
| 0.999 | Vertical load testing of piles in accordance with IS 2911 (Part IV) including installation of loading platform by Kentledge method and preparation of pile head or construction of test cap and dismantling of test cap after test etc. complete as per specification & the direction of Engineer in-charge. 2.Routine test DSR 20.6.1.2 | - | NOS | - | - | BI01010001010000000000000515BI0100001113 |
| 0.999 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) (Plinth beam) DSR 5.1.2 | - | CUM | - | - | BI01010001010000000000000515BI0100001113 |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_2129444.xls
BOQ • 0.68 MB
FINCHICALBID.pdf
Tender Documents • 1.01 MB
TECHNICALD.pdf
Tender Documents • 11.63 MB
Download all tender documents and submit your bid