Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.3 CrAdmitted-Finance | ₹2.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.6 Cr+₹36.5 L (16.1%)Admitted-Finance | ₹2.6 Cr+₹36.5 L (16.1%) | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Tender terms and conditions not fulfilled |
| Sl No | Description | Qty | Unit | M/S. Y.M. ENTERPRISES L2 | M/S B.P. ASSOCIATES L1 |
|---|---|---|---|---|---|
| 1.00Poles and Stay Arrangement | |||||
| 1.01 | Galvanised steel pole of tubular in designed and swaged of the length 7 meters with top cap welded and lightning spike and including muff. (Maximum 20 poles per Km) | 760 | Nos | 13,900 ₹1,16,20,400 | 11,990 ₹91,12,400 Lowest |
| 1.02 | Stay arrangement for 7M/8M steel poles | 570 | Nos | 5,750 ₹36,05,250 | 3,600 ₹20,52,000 Lowest |
| 2.00Installation Accessories & Fixtures for ADSS OF Cable: | |||||
| 2.01 | Joint Closure Kits(24F ADSS) | 14 | Nos | 2,500 ₹36,750 | 1,900 ₹26,600 Lowest |
| 2.02 | Pig Tail 20M FCPC | 360 | Nos | 345 ₹1,30,410 Lowest | 1,300 ₹4,68,000 |
| 3.00Services inclusive of all of the following: | |||||
| 3.01 | Erection of 7 m / 8m poles including excavation, Construction of RCC foundation for mounting/erecting the poles/fixing of MUFF concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of-Way (RoW) permission and sign writing on poles with paint | 760 | Nos | 6,800 ₹51,68,000 Lowest | 9,850 ₹74,86,000 |
| 3.02 | Slinging/ Laying of ADSS OFC route on installed poles including supply of all accessories by clamping formed OFC dead end & termination fittings, OFC suspension fittings, adjustable cable storage bracket as per EI and stringing OFC over the poles along with Link testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes. This also includes cost towards collection of ADSS Cable/ AOF cable and accessories from BSNL's Store Depot. | 38 | kms | 1,40,000 ₹57,45,600 | 92,000 ₹34,96,000 Lowest |
| 3.03 | Splicing and termination of OFC of 24F size at joints and termination box | 14 | Nos | 3,000 ₹42,000 Lowest | 3,800 ₹53,200 |
Tender Value
₹2.2 Cr
EMD Value
₹5.6 L
Closing Date
16 Apr 2025, 11:00 amClosed
AGM (MM)
O/o CGMT, NE_II Circle, BSNL Dimapur
Tender for procurement of 7 M and 8 M tubular poles with accessories,Installation Accessories and Fixtures for ADSS OFC,Slinging of ADSS Cable and associated works along with testing and commissioning of ADSS Cable route on Turnkey basis in BSNL, ARP
2025_BSNL_231254_1
NE2CO-23/17(11)/3/2025-CFA - Zone-B ADSS OFC under 4G Saturation Project, ARP BA
Open Tender
OFC Laying Works
Works
365 days
Arunachal Pradesh
Please refer Tender documents.
26 documents required · 26 mandatory
₹2,000
AO (Cash), O/o CGMT, NE-II Circle, Dimapur
₹5.6 L
3 Jun 2025
26 Mar 2025
17 Apr 2025
26 Mar 2025
16 Apr 2025
26 Mar 2025
26 Mar 2025 - 2 Apr 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Poles and Stay Arrangement | |||||
| 1.01 | Galvanised steel pole of tubular in designed and swaged of the length 7 meters with top cap welded and lightning spike and including muff. (Maximum 20 poles per Km) | - | Nos | - | - |
| 1.02 | Stay arrangement for 7M/8M steel poles | - | Nos | - | - |
| 2Installation Accessories & Fixtures for ADSS OF Cable: | |||||
| 2.01 | Joint Closure Kits(24F ADSS) | - | Nos | - | - |
| 2.02 | Pig Tail 20M FCPC | - | Nos | - | - |
| 3Services inclusive of all of the following: | |||||
| 3.01 | Erection of 7 m / 8m poles including excavation, Construction of RCC foundation for mounting/erecting the poles/fixing of MUFF concreting, curing, Backfilling, Reinstatement, Compaction of earth, Stay arrangements etc. including obtaining Right-of-Way (RoW) permission and sign writing on poles with paint | - | Nos | - | - |
| 3.02 | Slinging/ Laying of ADSS OFC route on installed poles including supply of all accessories by clamping formed OFC dead end & termination fittings, OFC suspension fittings, adjustable cable storage bracket as per EI and stringing OFC over the poles along with Link testing & Acceptance Testing and makeover of route with As Built Diagram (ABD) of installed Cable routes. This also includes cost towards collection of ADSS Cable/ AOF cable and accessories from BSNL's Store Depot. | - | kms | - | - |
| 3.03 | Splicing and termination of OFC of 24F size at joints and termination box | - | Nos | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 5.03 MB
BOQ_260974.xls
BOQ • 0.26 MB
BOQ.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .