| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹20.8 LAccepted-AOC | ₹20.8 L | L1 | Accepted-AOC Eligible |
| 2 | L2₹20.9 L+₹12,325 (0.59%)Rejected-Finance 3 176 ARULJOTHI NAGAR KARANAMPETTAI SULUR VIA COIMBATORE 641401 | COIMBATORE | TAMIL NADU | 641401 | ₹20.9 L+₹12,325 (0.59%) | L2 | Rejected-Finance In Eligible |
| Sl No | Description | Qty | Unit | KSR AND CO L1 | SRI MURUGAN CONSTRUCTIONS L2 |
|---|---|---|---|---|---|
| 1.00 | Dismantling Plain cement concrete existing drain including all charges. | 60 | M3 | 520 ₹31,200 Lowest | 520 ₹31,200 Lowest |
| 2.00 | Dismantling RCC by Manual/ by using deploying Machineries including all charges | 11 | M3 | 4,610 ₹50,710 Lowest | 4,610 ₹50,710 Lowest |
| 3.00 | Earthwork excavation in all soils and sub soils except hard rock not requiring blasting with initial lead and lift including re-filling the sides of foundation in layer of 15 cm thick watering , ramming ,depositing the surplus earth in the premises as directed by departmental officers etc., complete as per standard specification. as per SS 20 B TNDSS NO: 23&24VI (S2), VII 9,10 | 178 | M3 | 197 ₹35,066 Lowest | 197 ₹35,066 Lowest |
| 4.00 | Plain Cement Concrete of mix 1 : 4 : 8 (One Cement Four sand Eight aggregates) using 40mm gauge hard broken including cost conveyance of all materials to site including formwork and centering labour charges, transporting and placing in position including shoring, strutting, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification.as per the standard specifications. TNDSS NO: 28 V, VI (S2) V,VI (S5A) VII | 44 | M3 | 5,687 ₹2,50,228 Lowest | 5,687 ₹2,50,228 Lowest |
| 5.00Supplying and errecting centering to sides and soffits including supports and strutting for drainage sides and culvert body wall sides using 90cm x 60cm and B.G 10stifened with welded mild steel angles of size 25mm x 25mm x 3mm for boarding laid over( silver oak joists ) of size 10cm x 6.50cm spaced at about 90cm including all labour charges and cost and conveyance of all materials to site etc. complete complying with standard specification. TNDSS NO: 30&86 | |||||
| 5.10 | Side wall | 627 | M2 | 575 ₹3,60,525 Lowest | 575 ₹3,60,525 Lowest |
| 5.20 | Culvert | 46 | M2 | 937 ₹43,102 Lowest | 937 ₹43,102 Lowest |
| 6.00 | Plain Cement Concrete 1:2:4 Mix (one part cement, two part sand and four part of aggrigate) using 20mm size ISS HBG metal machine crushed from approved quarry including cost and conveyance of all materials to site, loading and unloading charges and labour charges for mixing, laying,vibrating and curing etc. complete. Complying with std. specifications. | 122 | M3 | 7,120 ₹8,68,640 Lowest | 7,120 ₹8,68,640 Lowest |
| 7.00 | Providing Granolithic floor finish of the 25mm thickness with plain cement concrete 1:2:4 (One Cement, Two sand and Four aggregate) using 10 to 12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trawl, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) | 162 | M2 | 177 ₹28,674 Lowest | 177 ₹28,674 Lowest |
| 8.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of sand, but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - The Coarse and Fine aggregates to be used should comply with the requiremnents of IS standards. (No separate payment will be made by the Department for the excess usage of materials) -Footing, Plinth beam, Tie beam/Lintel, Ground Floor Roof beam, salbs, Sloped roof beam and slabs.30 V, VI (S5) VII & 13 | 12 | M3 | 8,264 ₹99,168 Lowest | 8,264 ₹99,168 Lowest |
Tender Value
₹25.3 L
EMD Value
₹25,300
Closing Date
23 Oct 2025, 3:00 pmClosed
Executive Officer
Kannampalayam Town Panchayat Kannampalayam Coimbatore 641402
General Fund 2025-26 Reconstruction of Strom Water Drain at ward No 6 Nanjappa Nagar Main Road in Kannampalayam Town Panchayat Coimbatore District
2025_DTP_614507_1
119/2025
Open Tender
Civil Works
Item Rate
180 days
Kannampalayam Town Panchayat
As per Norms
3 documents required · 3 mandatory
₹0
₹25,300
23 Mar 2026
15 Oct 2025
23 Oct 2025
15 Oct 2025
23 Oct 2025
15 Oct 2025
15 Oct 2025 - 23 Oct 2025
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BID.pdf
Additional Documents • 0.29 MB
BOQ_734182.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .