Loading…
Loading…
Tender Value
₹23.8 L
EMD Value
₹47,600
Closing Date
28 Sept 2026, 1:00 pmDue tomorrow
DG CIVIL/BR-VIII
5 S N BANERJEE ROAD
RESTORATION OF PAVER BLOCK FOOTPATH AND BITUMINOUS SURFACE AT ALLENBY RD DISTURBED DUE TO CONSTRUCTION OF STORM WATER PUMPING STATION AND ITS NETWORK AT NORTHERN PARK IN WD NO-70,BR- VIII
2026_KMC_1042532_1
DGC/VIII/70/06/26-27/R
Open Tender
CIVIL WORKS
Percentage
60 days
W-70
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹47,600
21 Sept 2026
21 Sept 2026
30 Sept 2026
21 Sept 2026
28 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthwork in cutting to form road section in correct profile including removal of spoils not exceeding initial lead of 50m and initial lift of 1.5m (Mode of measurement: pre works and post works) (i) In ordinary soil | 188.94 | M3 | 79.9 | ₹15,096.31 |
| 2 | Supplying, spreading and compacting Sand to required thickness, in layers not exceeding 150 mm to proper gradient and camber, inundating each layer by water and packing and ramming layer by layer to achieve desired compaction, including lighting, guarding, barricading and making adequate earthen bundh where necessary, curing with water as per direction, mending cracks and depressions by ramming wherever necessary. Note:- Add cost at site of the materials to arrive at the complete rate. The compaction factor for dry, clean sand may be taken as 0.835. (The payment is to be made on the basis of finished compacted volume). (b) For Medium Sand | 62.98 | M3 | 1,275.29 | ₹80,317.76 |
| 3 | BUILDING WORKS(D) Flooring..A. ORIGINAL WORKS..(3)Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | 839.75 | SQM | 24 | ₹20,154 |
| 4 | ORDINARY CEMENT CONCRETE(MIX 1:3:6) WITH GRADE A STONECHIPS (20 MM NOMINAL SIZEEXCLUDING SHUTTERING AND REINFORCEMENT, IF ANY,IN GROUND FLOOR AS RELEAVANT CODE. | 83.23 | M3 | 4,458 | ₹3,71,039.34 |
| 5 | TAKING OUT AND RELAYING OF EXISTING INTERLOCKING PAVER BLOCKS IN FOOT PATH OR PASSAGE ETC. OVER 20-40 MM THICK MEDIUM YELLOW SAND BED WITH TRUE TO LINE, LEVELLING, PROPER COMPACTION WITH VIBRATER ETC. WITH JOINTING WITH KERB/EDGE TO BE MADE WITH CEMENT CONCRETE (1:2:4) ETC. AS PER THE DIRECTION OF THE ENGINEER IN CHARGE.INCLUDING COST OF TAKING OUT AND USING 20% NEW SAND AND ALL MATERIALS, LABOUR ETC.COMPLET. ETC.COMPLET. | 1,399.58 | SQM | 108 | ₹1,51,154.64 |
| 6 | Supplying and Laying in the specified pattern of Interlocking Concrete Block Pavements (ICBP) with concrete blocks (with Concrete grade as specified as per Table 1 of IS 15658 : 2006) manufactured from BIS licensee manufacturer, with spacer nib (Small protruding profiles on the vertical face of a paver block used as a device for keeping minimum joint gap in between the paving blocks, as per Cl. No 3.26 of IS: 15658)and of specified size and shape with aspect ratio (The ratio of length to thickness of a paver block, as per CL.No.3.3 of IS: 15658) as per Table 2 of IS :15658 with flexural strength/breaking load as per Annexure G of IS:15658.on the prepared base course of specified CBR as per Table 1 of IRC SP 63 (2018) or else as mentioned in design and drawing with a cushion of compacted bedding sand of 25-35 mm thick (grading of the bedding sand as per clanse 6.5.1 of IRC SP 63) and filling up the gaps in between paver blocks with joint filling sand (the grading of the joint filling sand will he us per clause 6.5.2 of IRC SP 63) and completing the edges with cut blocks as per Cl. No. 8.7 af IRC SP-63(2018) with proper confinement of bedding and joint filling sand, compaction levelling and filling up of the edge gap. 50mm thick (ii) Coloured Decorative (12th Corrigenda & addenda dated14.10.2020) | 209.94 | SQM | 875 | ₹1,83,700.13 |
| 7 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. b) flat channel stone. | 600 | MTR | 8.17 | ₹4,902 |
| 8 | Taking out stone slab of kerb & channel of road side drain and stacking as directed. a) vertical kerb stone. | 600 | MTR | 8.17 | ₹4,902 |
| 9 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). b) flat channel stone. | 600 | MTR | 18.24 | ₹10,944 |
| 10 | Resetting of Stone Slabs of kerb & channel of road side drain to correct line and level including cement pointing (1:2). a) Vertical Kerb | 600 | MTR | 21.34 | ₹12,804 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.55 MB
BOQ_2558813.xls
BOQ • 0.36 MB
TF.pdf
Tender Documents • 1.07 MB
civil_oid_compressed.pdf
Additional Documents • 1.12 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .