| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.4 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹16.0 L+₹1.5 L (10.7%)Rejected-Finance 0 BAGHI NAUGARH NAUGARH CHANDAULI UTTAR PRADESH 232111 | CHANDAULI | UTTAR PRADESH | 232111 | L2 | Rejected-Finance L2 | |
| 3 | L3₹16.7 L+₹2.2 L (15.5%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S Kamlesh Kumar Singh L1 | AKANKSHA ASSOCIATES L2 | SIDDHI ENGINEERING AND INFRASTRUCTURE L3 |
|---|---|---|---|---|---|---|
| 1.00 | Ordinary jungle clearance (Only where the growth is continuous). | 200 | Sqm | 4 ₹800 | 3.9 ₹780 | 3.5 ₹700 Lowest |
| 2.00 | E/W in filling and embankments including lead up to 30 m & lift up to 1.50 m excluding mechanical compaction but including manual compaction and dressing to profiles | 1,312.8 | Cum | 90 ₹1,18,152 Lowest | 200 ₹2,62,560 | 190 ₹2,49,432 |
| 3.00 | S/Laying filter behind abutment 20 to 40 mm cum M-150 class brick ballast | 29.63 | Cum | 5,800 ₹1,71,854 | 2,200 ₹65,186 | 1,950 ₹57,778.5 Lowest |
| 4.00 | 1st Class Brick work in 1:4 C.M. with coarse including cost of all material, Labour and T&P | 71.8 | Cum | 5,800 ₹4,16,440 | 5,500 ₹3,94,900 Lowest | 7,180 ₹5,15,524 |
| 5.00 | Centering and Shuttering for RCC work including cost of all material, Labor and T&P | 98.48 | Sqm | 900 ₹88,632 | 1,000 ₹98,480 | 850 ₹83,708 Lowest |
| 6.00 | Bending,Binding, Cutting and Placing of reinforcement including cost of all material, Labour and T&P | 2.97 | M.T. | 90,000 ₹2,67,300 | 78,000 ₹2,31,660 | 74,999 ₹2,22,747.03 Lowest |
| 7.00 | P/L Cement conctreate 1:1.5:3 M 20 with 4.75 to 20 mm aggregate well mixed and laid in position complete i/c all leads of all construction materials i/c curing and finishing having well graded crusher broken stone aggregate | 38.49 | Cum | 7,200 ₹2,77,128 Lowest | 9,200 ₹3,54,108 | 9,599 ₹3,69,465.51 |
| 8.00 | P/L Cement conctreate 1:1:2 M 25 with 4.75 to cum 10 mm aggregate well mixed and laid in position complete i/c all leads of all construction materials i/c curing and finishing having well graded crusher broken stone aggregate | 4.95 | Cum | 7,200 ₹35,640 Lowest | 11,500 ₹56,925 | 10,199 ₹50,485.05 |
| 9.00 | Providing and fixing 75 mm dia PVC pipe in weep hole per R.M. | 6 | R.M. | 90 ₹540 Lowest | 100 ₹600 | 99 ₹594 |
| 10.00 | Providing and laying 25 mm joint filler board (bituminous) per sqm | 8.94 | Sqm | 400 ₹3,576 Lowest | 2,700 ₹24,138 | 2,199 ₹19,659.06 |
Tender Value
Refer Docs
EMD Value
₹40,000
Closing Date
3 Feb 2026, 1:00 pmClosed
Executive Engineer
Executive Engineer, Sharda Sahayak Division-28, Haidergarh, Barabanki.
AS PER TENDER NOTICE 06
2026_UPIDC_1109107_1
06/EE/2025-26
Open Tender
Civil Works - Canal
Item Rate
30 days
Haidergarh
Please refer Tender documents.
2 documents required · 2 mandatory
₹890
₹40,000
10 Jun 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
3 Feb 2026
27 Jan 2026
Ordinary jungle clearance (Only where the growth is continuous).
E/W in filling and embankments including lead up to 30 m & lift up to 1.50 m excluding mechanical compaction but including manual compaction and dressing to profiles
S/Laying filter behind abutment 20 to 40 mm cum M-150 class brick ballast
1st Class Brick work in 1:4 C.M. with coarse including cost of all material, Labour and T&P
Centering and Shuttering for RCC work including cost of all material, Labor and T&P
Bending,Binding, Cutting and Placing of reinforcement including cost of all material, Labour and T&P
P/L Cement conctreate 1:1.5:3 M 20 with 4.75 to 20 mm aggregate well mixed and laid in position complete i/c all leads of all construction materials i/c curing and finishing having well graded crusher broken stone aggregate
P/L Cement conctreate 1:1:2 M 25 with 4.75 to cum 10 mm aggregate well mixed and laid in position complete i/c all leads of all construction materials i/c curing and finishing having well graded crusher broken stone aggregate
Providing and fixing 75 mm dia PVC pipe in weep hole per R.M.
Providing and laying 25 mm joint filler board (bituminous) per sqm
Providing and laying tarfelt in two layer with coating in each layer with bitumen (85/25) grade between abutment and slab per sqm
Cement pointing on 1:2 Cement and fine sand mortor including supply of material, labour and T&P. etc. all complete the work. As per direction of Engineer-in-charge.
Supplying and fixing of 75x75x6 angle iron including all cost of material, labour and T&P.
Finishing wall with water proofing cement paint of approved make such as super snowcem, Durocem robiecem, Guttu cem, Super cem quality and of required shade on new wall surface (two coats) over one coat of white cement primer to give and even shade after throughly brushing the surface to remove powdered materials including curing and cost of all materials
Painting chainage in V.R.B.
Dry Brick on edge solling for making Ramp including preparing sub-grade,filling joints with local earth spreading, a binding coat of 1 cm of local earth on entire surface made and all labour , T&P to complete the job per sq. metre.
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.68 MB
BID06.pdf
Tender Documents • 1.46 MB
BOQ_2047924.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .