Tender Value
Refer Docs
EMD Value
₹20,000
Closing Date
8 Mar 2023, 2:00 pmClosed
Executive Engineer JPDCL ED-I Parade Jammu
Office of Executive Engineer JPDCL ED-I Parade Jammu
Rate Contract for Supply Erection Testing Commissioning For Replacement of 1 Ckt KM ACSR 30 MM WEASEL Conductor By 50 MM LT AB Cable On ST and PCC Pole for the financial year 2023-24 on Turn Key basis
2023_PDD_205208_1
ED-I/e-NIT/13 of 2023-24 dt 15/02/2023
Open Tender
Electrical Works
Turn-key
30 days
Parade Jammu
Please refer tender documents
11 documents required · 11 mandatory
₹1,000
Executive Engineer JPDCL ED-I Parade Jammu
₹20,000
15 Jul 2023
15 Feb 2023
9 Mar 2023
15 Feb 2023
8 Mar 2023
15 Feb 2023
Amount
ERECTION FOR REPLACEMENT OF 1 CKT. KM ACSR 30 MM² (WEASEL) CONDUCTOR BY 50 MM² LT AB CABLE ON ST POLE.
50 mm² AB Cable
Striaght Through Cable Jointing Kit
Suspension/Tension Clamp with Eye-Hook
8 Mtr. Long ST Pole
Cement Bottoming of Pole
Nuts & Bolts
Danger Plates
Anti Climbing Device with clamps
Earthing complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr. Long through GI strip
Red Oxide paint
Al. paint
Insulating Piercing Connectors
PG Clamps
Guy Rod Complete
Branch Cutting
Route Clearance for Corridor of 5 mtr
Dismantel of old conductor & allied material write back to divisional store estiamte rate calculated for 3-phase 4-wire conductor.
ERECTION FOR REPLACEMENT OF 1 CKT. KM ACSR 30 MM² (WEASEL) CONDUCTOR BY 120 MM² LT AB CABLE ON ST POLE.
120 mm² AB Cable
Striaght Through Cable Jointing Kit
Suspension/Tension Clamp with Eye-Hook
8 Mtr. Long ST Pole
Cement Bottoming of Pole
Nuts & Bolts
Danger Plates
Anti Climbing Device with clamps
Earthing complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr. Long through GI strip
Red Oxide paint
Al. paint
Insulating Piercing Connectors
PG Clamps
Guy Rod Complete
Branch Cutting
Route Clearance for Corridor of 5 mtr
Dismantel of old conductor & allied material write back to divisional store estiamte rate calculated for 3-phase 4-wire conductor.
ERECTION FOR REPLACEMENT OF 1 CKT. KM ACSR 30 MM² (WEASEL) CONDUCTOR BY 50 MM² LT AB CABLE ON PCC POLE.
50 mm² AB Cable
Striaght Through Cable Jointing Kit
Suspension/Tension Clamp with Eye-Hook
8 Mtr. Long PCC Pole
Stone Pad 300x300x75 mm
Nuts & Bolts
Danger Plates
Anti Climbing Device with clamps
Earthing complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr. Long through GI strip
Red Oxide paint
Al. paint
Insulating Piercing Connectors
PG Clamps
Guy Rod Complete
Branch Cutting
Route Clearance for Corridor of 5 mtr
Dismantell of old conductor & allied material write back to divisional store estiamte rate calculated for 3-phase 4-wire conductor.
ERECTION FOR REPLACEMENT OF 1 CKT. KM ACSR 30 MM² (WEASEL) CONDUCTOR BY 120 MM² LT AB CABLE ON PCC POLE.
120 mm² AB Cable
Striaght Through Cable Jointing Kit
Suspension/Tension Clamp with Eye-Hook
8 Mtr. Long PCC Pole
Stone Pad ( 300 mm x300 mm x 75 mm)
Nuts & Bolts
Danger Plates
Anti Climbing Device with clamps
Earthing complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr. Long through GI strip
Red Oxide paint
Al. paint
Insulating Piercing Connectors
PG Clamps
Guy Rod Complete
Branch Cutting
Route Clearance for Corridor of 5 mtr
Dismantell of old conductor & allied material write back to divisional store estiamte rate calculated for 3-phase 4-wire conductor.
ERECTION FOR REPLACEMENT OF 1 CKT. KM ACSR 30 MM² (WEASEL) CONDUCTOR BY 50 MM² HT AB CABLE ON ST POLE.
50 mm² AB Cable
Heat Shrinkable Outdoor Cable Termination Kit
Suspension/Tension Clamp with Eye-Hook
9 Mtr. Long ST Pole
Cement Bottoming of Pole
Nuts & Bolts
Danger Plates
Anti Climbing Device with clamps
Earthing complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr. Long through GI strip
Red Oxide paint
Al. paint
Insulating Piercing Connectors
PG Clamps
Guy Rod Complete
Branch Cutting
Route Clearance for Corridor of 5 mtr
Dismantell of old conductor & allied material write back to divisional store estiamte rate calculated for 3-phase 4-wire conductor.
ERECTION FOR REPLACEMENT OF 1 CKT. KM ACSR 30 MM² (WEASEL) CONDUCTOR BY 120 MM² HT AB CABLE ON ST POLE.
120 mm² AB Cable
Heat Shrinkable Outdoor Cable Termination Kit
Suspension/Tension Clamp with Eye-Hook
9 Mtr. Long ST Pole
Cement Bottoming of Pole
Nuts & Bolts
Danger Plates
Anti Climbing Device with clamps
Earthing complete by GI Pipe 40 mm or GI Rod 20 mm 2.5 mtr. Long through GI strip
Red Oxide paint
Al. paint
Insulating Piercing Connectors
PG Clamps
Guy Rod Complete
Branch Cutting
Route Clearance for Corridor of 5 mtr
Dismantell of old conductor & allied material write back to divisional store estiamte rate calculated for 3-phase 4-wire conductor.
The Trikuta Engineer
JASMEET SINGH
AA ENTERPRISES
M/S APR CONSTRUCTIONS
M/s GCS Associates
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .