Loading…
Loading…
Tender Value
₹10.0 L
EMD Value
₹19,998
Closing Date
13 Oct 2026, 5:00 pm
Executive Officer
nagar palika parishad shamli
Construction of beautyfication and interlocking tiles from barkhandi school
2026_DOLBU_1187726_16
330/E-T/PWC/2026-27
Open Tender
Civil Works
Percentage
30 days
Construction of beautyfication and interlocking ti
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Executive Officer
₹19,998
22 Sept 2026
22 Sept 2026
14 Oct 2026
22 Sept 2026
13 Oct 2026
22 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of Reinforced Cement Concrete by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in 1 volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately | 6.38 | Cum | 400 | ₹2,552 |
| 2 | Deduct the cost of old bricks | 440 | nos | 4.2 | ₹1,848 |
| 3 | Ded the cost of old bricks/bats | 0.96 | cum | 600 | ₹576 |
| 4 | Cartage of Ballast, Kankar, Coal, Grit or Sand 1 etc. including loading and unloading but excluding stackings on pucca roads. Upto 8 Km. | 0.95 | cum | 2,000 | ₹1,900 |
| 5 | R. C. C Work with cement approved coarse sand and 2cm. Guage approved stone grit in nalla 1:1.5:3 proportion excluding supply of rainforcement and its bending piit including its fixing and binding the same with 24B.W. GG.I Binding wire and including necessaey centering and etc. Supply ofall materials, labour and T&P etc. required for proprer complation of work | 0.63 | Cum | 7,400 | ₹4,662 |
| 6 | M.S. (tor or plain)in plain work such as R.C.C. or R.B. work including bending for proper shape and including supply of steel and its wastage bend, hooks and authorised overlapping shall be measured and including cost of binding wire wastage including supply of all labour material T&P etc. required for proper completion of the work. | 0.4 | Qtl | 7,901.8 | ₹3,160.72 |
| 7 | M-150 Brick work in 1:3 one cement and three course sand mortar in superstructure including necessary Cutting & moulding of bricks as required thickness of walls not to be less than 1½ brick. Add extra labour to above items. | 22.74 | Cum | 4,995 | ₹1,13,586.3 |
| 8 | Stone ballast, coarse sand & cement in the proportion of 8:4:1 including supply of all materials, labour, Tools & plants etc required for proper completion of the work. | 1.21 | Cum | 4,850 | ₹5,868.5 |
| 9 | P/L of 12 mm thick cement plasterin 1:3 Cement & C/Sand mortar | 116.19 | Sqm | 180 | ₹20,914.2 |
| 10 | Provding wall putty on new Surface with approved quality material of Berger/J.K/Birla or similar mak 2 coats. | 116.19 | Sqm | 67 | ₹7,784.73 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
technicaldocument.pdf
Tender Documents • 1.52 MB
BOQ_2236865.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .