| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹54.6 LAccepted-Finance N 3 91 IRC VILLAGE NAYAPALLI BHUBANESWAR 751015 | BHUBANESWAR | KHORDHA | ODISHA | 751015 | ₹54.6 L | L1 | Accepted-Finance . |
| 2 | L2₹98.7 L+₹44.0 L (80.6%)Accepted-Finance | ₹98.7 L+₹44.0 L (80.6%) | L2 | Accepted-Finance . |
| 3 | L3₹1.5 Cr+₹94.4 L (172.8%)Accepted-Finance | ₹1.5 Cr+₹94.4 L (172.8%) | L3 | Accepted-Finance . |
| 4 | L4₹2.5 Cr+₹2.0 Cr (363.2%)Accepted-Finance | ₹2.5 Cr+₹2.0 Cr (363.2%) | L4 | Accepted-Finance . |
| 5 | Rejected-Technical | - | - | Rejected-Technical non-responsive |
Tender Value
Refer Docs
Closing Date
14 Nov 2022, 3:00 pmClosed
SUPERINTENDING ENGINEER, RO MORTH BHUBANESWAR
Regional office Ministry of Road Transport and Highways, Plot no 184 Bhubaneswar Odisha.
Preparation of Detailed Project Report DPR for Construction of Bridge with approaches at 1. km 126.744 TEL River on NH 26 and 2. km 92.200 Mahendratanaya River on NH 326A in the State of Odisha
2022_MoRTH_712468_1
03-ROBBSR-2022-23/DPR
Open Tender
Civil Works - Others
Item Rate
300 days
Mahendratanaya River and TEL River
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Pay and accounts officer PAO 034756 NH, Kolkata
Exempted
7 Jun 2023
15 Sept 2022
15 Dec 2022
15 Sept 2022
14 Nov 2022
15 Sept 2022
Amount
Key Personnel
Team Leader cum Senior Bridge Engineer
Highways Cum Pavement Engineer
Bridge/Structural Engineer
Material-cum-Geo-technical Engineer-Geologist
Senior Survey Engineer
Senior Geologist
Environmental Specialist
Quantity Surveyor/ Documentation Expert
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
To be filled by Consultant
Support Staff
Office Manager
Typist
Office Boy
Night Watchman
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Duty Travel to Site (Fixed Costs)
Office Rent (Fixed Costs) The rent cost includes maintenance, Cleaning, repairs, etc.
Office Supplies, Utilities and Communication ( Fixed Costs )
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Office Furniture and Equipment ( Rental )
Office Furniture and Equipment
Reports and Document Printing
Monthly Report (per month)
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
IX Survey and Investigation
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials , labourer.
Detailed topographic surveys using Air Borne Tomography and Air Borne LiDAR Technology
B. Investigation (Fixed cost)
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Any other investigations/surveys
Sub-Soil Investigation (Boring)
(a) Boaring in all type of soils (other than hard rock)
(b) Boaring in hard rock
NET WORK SURVEY AND GPR
Net work Survey of the existing Highways as a responsitory for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Cost of supply and fixing boundary pillars
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967:Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum )
Land acquisition Team including support staff and logistics/transportation
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Logistic for Land Acquisition Team
Computer including necessary peripherals
Printer
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
VKS Infratech Mgmt Pvt Ltd
Segmental Consulting and Infrastructure Advisory Pvt Ltd
Marc Technocrats Private Limited
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .