Loading…
Loading…
Tender Value
₹2.5 L
EMD Value
₹12,380
Closing Date
29 Jun 2026, 6:55 pm4d left
Similar tender results from the same govt authority in the past 3 years.
EXECUTIVE ENGINEER REW BUDGAM
EXECUTIVE ENGINEER REW BUDGAM
Construction of bathroom at Hussainia Colony near Masjid Sharief Chattergam
2026_RDPR_313144_12
NIT_13 REW BUDGAM OF 2026-27
Open Tender
Civil Works
30 days
B.K.PORA
Please refer Tender documents.
3 documents required · 3 mandatory
₹200
EXECUTIVE ENGINEER REW BUDGAM
₹12,380
20 Jun 2026
20 Jun 2026
30 Jun 2026
20 Jun 2026
29 Jun 2026
20 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 0_) | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed.All kinds of soil : 1 meter from cutting edge. | 6.08 | cum | 479.3 | ₹2,914.14 | BI01010001010000000000000515BI0100001117 |
| 0_) | i) Suppluing and laying of Dry Stone soling hand Packed Tightly Including rammining, watering complete. | 2.1 | cum | 931 | ₹1,955.1 | BI01010001010000000000000515BI0100001118 |
| 0_) | II) S/S of Boulders/GSB filling under room floors incl. watering and rammig with hand rammer. | 2.4 | cum | 931 | ₹2,234.4 | BI01010001010000000000000515BI0100001119 |
| 0_) | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 4.7 | cum | 5,733.6 | ₹26,947.92 | BI01010001010000000000000515BI0100001121 |
| 0_) | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering,
finishing and reinforcement 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 1.18 | cum | 9,395.7 | ₹11,086.93 | BI01010001010000000000000515BI0100001122 |
| 0_) | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level : Mild steel and medium tensile steel bars | 116.78 | Kgs | 115.35 | ₹13,470.57 | BI01010001010000000000000515BI0100001123 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns | 29.25 | Sqm | 286.35 | ₹8,375.74 | BI01010001010000000000000515BI0100001124 |
| 0_) | Centering and shuttering including strutting, propping etc. and removal of form work for :Suspended floors, roofs, landings, balconies and access platforms. | 6.66 | Sqm | 718.2 | ₹4,783.21 | BI01010001010000000000000515BI0100001125 |
| 0_) | Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) | 4.71 | Cum | 7,877.4 | ₹37,102.55 | BI01010001010000000000000515BI0100001126 |
| 0_) | Extra for brick work with common burnt clay bricks/cement concrete bricks in superstructure above plinth level upto floor five level | 4.71 | Cum | 1,455.65 | ₹6,856.11 | BI01010001010000000000000515BI0100001127 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_1013382.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid