| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 4 6 1 KALABAIRAVANKADU AYAKKARANBULAM II VEDHARANYAM TALUK NAGAPATTINAM DISTRICT 614707 | AYAKKARANBULAM | NAGAPATTINAM | TAMIL NADU | 614707 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.1 Cr+₹92,859.59 (0.82%)Admitted-Finance | ₹1.1 Cr+₹92,859.59 (0.82%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | shree ananda kamatchi contractors L2 | M/s Sri Ezhumalaiyan Construction L1 |
|---|---|---|---|---|---|
| 1.0001. Periodic Renewal of Black Topping to L-047 -Keelaiyur to Mankudi Road KM 0/0-4/821 in Keelaiyur Block | |||||
| 2.00Advance BT patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site including cost and conveyance of metal from approved Quarry, labour charges for tamping to required level, line and grade etc complete complying with standard specifications. | |||||
| 3.00 | KM 0/0 - 1/0 | 3.75 | Sq.m | 4,598 ₹17,242.5 | 4,552 ₹17,070 Lowest |
| 4.00 | KM 1/0 - 2/0 | 3.38 | Sq.m | 4,604 ₹15,561.52 | 4,558 ₹15,406.04 Lowest |
| 5.00 | KM 2/0 - 3/0 | 4.13 | Sq.m | 4,618 ₹19,072.34 | 4,572 ₹18,882.36 Lowest |
| 6.00Advance BT patch work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site including cost and conveyance of metal from approved Quarry, labour charges for tamping to required level, line and grade etc complete complying with standard specifications. | |||||
| 7.00 | KM 0/0 - 1/0 | 5.63 | Sq.m | 4,926 ₹27,733.38 | 4,877 ₹27,457.51 Lowest |
| 8.00 | KM 1/0 - 2/0 | 5.81 | Sq.m | 4,932 ₹28,654.92 | 4,883 ₹28,370.23 Lowest |
| 9.00 | KM 2/0 - 3/0 | 7.69 | Sq.m | 4,939 ₹37,980.91 | 4,890 ₹37,604.1 Lowest |
| 10.00 | KM 3/0 - 4/0 | 6.94 | Sq.m | 4,946 ₹34,325.24 | 4,897 ₹33,985.18 Lowest |
Tender Value
₹1.2 Cr
Closing Date
3 Jul 2024, 3:00 pmClosed
Additional Collectot Dev
DRDA, Collectorate Campus, Nagapattinam
01. Periodic Renewal of Black Topping to L-047 -Keelaiyur to Mankudi Road KM 0/0-4/821 in Keelaiyur Block, 02.Periodic Renewal of Black Topping to MRL-18 -Kolapadu - Andipalayam Sithaimoor Road KM 0/0-1/0 in Thalainayar Block
2024_RDTN_134970_1
Nagai Dt/PMGSY-Rn. BT-DIPR//1996/2023-224/Pkg-01R
Open Tender
Civil Works - Roads
Item Rate
120 days
Keelayur and Thalainayar Block
As per the Technical Bid
8 documents required · 8 mandatory
₹2.3 L
Exempted
DRDA, Collectorate Campus, Nagapattinam
13 Sept 2024
25 Jun 2024
3 Jul 2024
25 Jun 2024
3 Jul 2024
25 Jun 2024
25 Jun 2024 - 27 Jun 2024
28 Jun 2024
Amount
01. Periodic Renewal of Black Topping to L-047 -Keelaiyur to Mankudi Road KM 0/0-4/821 in Keelaiyur Block
Advance BT patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site including cost and conveyance of metal from approved Quarry, labour charges for tamping to required level, line and grade etc complete complying with standard specifications.
Advance BT patch work for making up the undulation in the existing B.T surface to an average thickness of 25mm using 13.20mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site including cost and conveyance of metal from approved Quarry, labour charges for tamping to required level, line and grade etc complete complying with standard specifications.
Applying Tack coat using 2.00-2.50kgs of 10sqm over the BT surfaces including cost of bitumin emulsion supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tackcoat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification 503(MoRD)
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Provision for Painting the Center and Edge Line with Thermo Plastic Paint Including cost of Materials and Labour Charges etc
Provision for HM stone of size 0.90 m x 0.15 m x 0.15 m(missing stone)
Provision for Kilometre Stones 1.65m x 0.45m x 0.15m(missing stone)
Provision for Repainting Cautionary board
Provision for Cautionary New board
Provision for Refixing and Repainting Logo board
Provision for Refixing and Repainting Citizen Information board
Provision for Road Reflector
Provision for Repainting and Refixing Name board
Provision for Incentive fund New Name board
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
02.Periodic Renewal of Black Topping to MRL-18 -Kolapadu - Andipalayam Sithaimoor Road KM 0/0-1/0 in Thalainayar Block
Advance BT patch work for making up the undulation in the existing B.T surface to an average thickness of 50mm using 45mm IRC size HBG metal with 44 Kg of Bitumen-for 1cum of metal mixed in hot mix plant laying at site including cost and conveyance of metal from approved Quarry, labour charges for tamping to required level, line and grade etc complete complying with standard specifications.
Applying Tack coat using 3.00kgs of 10sqm over the BT surfaces including cost of bitumin emulsion supplied departmentally at section stores cost of which will be recovered herewith including conveyance of bitumen emulsion to actual work spot handling charges for brushing cleaning and including labour charges for preparing the surface for laying to actual work spot handling charges for brushing cleaning and to tackcoat and labour for applying the required quantity of bitumen emulsion including the hire charges and fuel charges for tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights flags etc. complete as per standard specification 503(MoRD)
Providing and laying bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading,premixed with bituminous binder @5.4 to 5.6 percent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment,rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT & H speciications clause 507 complete in all respects
Provision for HM stone of size 0.90 m x 0.15 m x 0.15 m(missing stone)
Provision for Kilometre Stones 1.65m x 0.45m x 0.15m(missing stone)
Provision for New Cautionary board
Provision for New Logo board
Provision for Refixing and Repainting Citize Information board
Provision for Repainting and Refixing Name board
Provision for Incentive fund New Name board
For the First Year from the date of completion of work
For the Second Year from the date of cpmpletion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above RENEWAL & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package}(Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
shree ananda kamatchi contractors
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.28 MB
TB.pdf
Tender Documents • 0.75 MB
PB.pdf
Additional Documents • 0.19 MB
BOQ_211286.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .