Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹13.8 LAdmitted-Finance | -21.57% | ₹13.8 L | L1 | Admitted-Finance |
| 2 | L2₹14.3 LAdmitted-Finance | -18.97% | ₹14.3 L | L2 | Admitted-Finance |
| 3 | L3₹15.0 LAdmitted-Finance | -14.99% | ₹15.0 L | L3 | Admitted-Finance |
Tender Value
₹17.6 L
EMD Value
₹35,248
Closing Date
26 May 2026, 6:00 pmClosed
Sr DGM Bhilwara
Sr DGM Bhilwara
Plantation With 5 Years Maintenance at Industrial Area Soniyana District Chittorgarh
2026_RIICO_559893_2
2026-27/08
Open Tender
Civil Works
Percentage
1885 days
RIICO Bhilwara
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,180
RIICO
₹35,248
27 May 2026
16 May 2026
27 May 2026
16 May 2026
26 May 2026
16 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m, including taking out the excavated soil and depositing and refilling of jhiri with watering & ramming and disposal of surplus excavated soil as directed with in a lead of 50 meter. All kinds of soils | 0.6 | Cum | 178 | ₹106.8 |
| 2 | 2, Supply & Stacking good soil of earth at site complete including loading unloading & Transportation etc., Good soil of earth | 0.6 | Cum. | 240 | ₹144 |
| 3 | 2, Different varieties of Shady plants, Height 5’-6’ (14â€x14â€) Many Branches | - | Each | 125 | - |
| 4 | Preparation of Thavala sizing 60 cms. Diametre & 10 cms. Deep once in a month. | - | Per Thawala | 1.2 | - |
| 5 | Maintenace of Plants by the contractor including of pits/bids watering preparation of Thavala Hoeing weeding etc. & application of insecticides etc. & security if the plant die during maintenance contractor has to replace same height plant at his own cost | - | Per Plant Per month | 18 | - |
| 6 | Earth, Sand, Lime, Morrum manure or sludge For 1 Km. | - | Cum | 57 | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
tdplantsoni.pdf
Tender Documents • 0.19 MB
BOQ_996704.xls
BOQ • 0.31 MB
plantcondat.pdf
Additional Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].