Loading…
Loading…
Tender Value
₹54.7 L
EMD Value
₹1.6 L
Closing Date
9 Sept 2026, 11:00 am
Superintending Archaeologist
The Superintending Archaeologist, Archaeological Survey of India, Chennai Circle, Fort St George, Chennai-600 009
As per NIT
2026_ASI_922917_1
T-15014/308/2026-CHENNAI CIRCLE
Open Tender
Civil Works
Works
180 days
Brahmadesam
As per NIT
6 documents required · 6 mandatory
₹0
₹1.6 L
Yes
20 Aug 2026
20 Aug 2026
10 Sept 2026
20 Aug 2026
9 Sept 2026
20 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | GST % |
|---|---|---|---|---|---|---|
| 1 | Careful removal of debris mixed with fallen stone architectural members by using labour or mechanical means and disposing the debris outside of the monument including labour charges, loading and unloading charges, conveyance charges and other applicable taxes etc complete as directed by the department officials | 1,603.01 | 1 CUM | 275.23 | ₹4,41,196.44 | 18% |
| 2 | Collection of useful stone members for restoration of prakara wall and stacking of remaining architectural members using mechanical means including labour charges, loading and unloading charges and other applicable taxes etc complete as directed by the department officials
a. Mazdoor Grade - I - 20 Nos. @ ₹ 766/- Basic rate as per TNSoR 2025-26 + 13% EPF + 3.25% ESI
b. Mazdoor Grade - II - 11.25 Nos. @ ₹ 628 Basic rate as per TNSoR 2025-26 + 13% EPF + 3.25% ESI
c. Hire and running charges of light crane - 5 days | 1 | 1 No | 56,453.62 | ₹56,453.62 | 18% |
| 3 | Carefully removing the damaged/out of plumb outer veneering prakara wall towards western side of the main temple after documentation and stacking available stones for reuse including labour charges, loading and unloading charges and other applicable taxes etc complete as directed by the department officials | 45.07 | 1 CUM | 1,198.46 | ₹54,014.59 | 18% |
| 4 | Carefully removing the weakend/dead core filling of outer veneering prakara wall towards western side of the main temple after documentation and disposing the waste materials without causing any damage to the structure including labour charges, loading and unloading charges, conveyance charges and other applicable taxes etc complete as directed by the department officials | 35.74 | 1 CUM | 937.83 | ₹33,518.04 | 18% |
| 5 | Earth work excavation in hard soil for laying foundation concrete including charges for necessary lead and lift to fillup in low lying areas including labour charges, loading and unloading charges, conveyance charges and other applicable taxes etc complete as directed by the department officials | 38.85 | 1 CUM | 533.13 | ₹20,712.1 | 18% |
| 6 | Laying levelling course using 20mm brick aggregate in lime mortar 1:2, including cost & conveyance of all materials, labour charges, loading unloading charges, transportation charges, mixing, laying, consolidation & ramming and other applicable taxes etc complete as directed by the department officials | 15.54 | 1 CUM | 8,900.3 | ₹1,38,310.66 | 18% |
| 7 | Construction of RR Masonry footings using existing stones in Lime Mortar 1:2 including cost & conveyance of all materials, labour charges, loading & unloading charges, transportation charges, mixing and other applicable taxes etc complete as directed by the department officials | 27.97 | 1 CUM | 9,706.79 | ₹2,71,498.92 | 18% |
| 8 | Restoration of stone masonry veneering wall to its original position with existing available stones by cutting/dressing the stone where ever necessary and using Lime Mortar 1:2 including cost & conveyance of all materials, labour charges, loading & unloading charges transportation charges, mixing of mortar, lifting & placing of stones and other applicable taxes etc complete as directed by the department officials | 65.79 | 1 CUM | 13,136.42 | ₹8,64,245.07 | 18% |
| 9 | Providing core filling between stone veneering using stone spalls convert from boulders available at site of size from 80mm to 120mm in Lime Mortar 1:2 including cost & conveyance of all materials, labour charges, loading & unloading charges, transportation charges, mixing of mortar, lifting & placing and other applicable taxes etc complete as directed by the department officials | 61.12 | 1 CUM | 6,527.2 | ₹3,98,942.46 | 18% |
| 10 | Provision for Pointing on stone work with lime mortar 1:1.5 including cost & conveyance of all materials, labour charges, loading & unloading charges, transportation charges, mixing of mortar and other applicable taxes etc complete as directed by the department officials | 269.36 | 1 SQM | 384.55 | ₹1,03,582.39 | 18% |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.10 MB
NITbrahmapurishwaracompressed.pdf
Tender Documents • 19.74 MB
BOQ_969848.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].