Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.8 LAccepted-AOC 35 VILLAGE GOPI 127308 | CHARKI DADRI | HARYANA | 127308 | ₹49.8 L | L1 | Accepted-AOC L1 |
| 2 | L2₹51.4 LRejected-AOC BHIMWANI LOHARA RD HARYANA | ₹51.4 L | L2 | Rejected-AOC L2 |
| 3 | L3₹54.4 LRejected-AOC H NO 12 N EXTENSION NEW PALAM VIHAR GURUGRAM H NO 12 N EXTENSION NEW PALAM VIHAR GURUGRAM 122001 | GURUGRAM | HARYANA | 122001 | ₹54.4 L | L3 | Rejected-AOC L3 |
| 4 | L4₹55.9 LRejected-AOC HARYANA HR | JIND | HARYANA | 126101 | ₹55.9 L | L4 | Rejected-AOC L4 |
| Sl No | Description | Qty | Unit | Rambir Singh contractor L2 | Rajbir L4 | M/S DDR Buildtech L3 | The balaji co operative society L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Providing and fixing Self Priming Monoblock Pump 1 HP make Crompton set complete work given Head 6- 45 meters, Discharge 57-13 LPM complete in all respect as per satisfaction of engineer in charge. | 1 | Nos. | 18,000 ₹18,000 | 6,200 ₹6,200 | 6,000 ₹6,000 | 5,500 ₹5,500 |
| 2.00 | Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty) (complete in all respect) as directed by Engineer-in-charge: Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves` (690.00) SDS. | 8 | Each | 2,000 ₹16,000 | 740 ₹5,920 | 690 ₹5,520 | 100 ₹800 |
| 3.00 | Analysis of Rates for 100 HP Control panel board | 1 | Each | 1,45,000 ₹1.4 L | 1,56,000 ₹1.6 L | 1,45,000 ₹1.4 L | 90,000 ₹90,000 |
| 4.00 | Good Earth | 675 | cum | 150 ₹1.0 L | 356 ₹2.4 L | 290 ₹2.0 L | 100 ₹67,500 |
Tender Value
₹50.8 L
EMD Value
₹1.0 L
Closing Date
16 Mar 2026, 12:00 pmClosed
PARVEEN KUMAR
Municipal Corporation Gurugram
Estimate for repair and renovation with construction of operator room, toilet and boundary wall at water works booster sec 18, ward 02, Division 3A under mcg. Re-call
2026_HRY_507011_1
20267068B10F D0A6 4695 804E 08DAF85993AB285ULB
Open Tender
Civil Works
250 days
Gurugram
2 documents required · 2 mandatory
₹5,000
₹1.0 L
Yes
9 Apr 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
16 Mar 2026
9 Mar 2026
Providing and fixing Self Priming Monoblock Pump 1 HP make Crompton set complete work given Head 6- 45 meters, Discharge 57-13 LPM complete in all respect as per satisfaction of engineer in charge.
Supply, Erection,testing and commissioning of Puffin 18W White Round Bright LED Panel Light Ceiling Downlight Lamp Kit with LED Driver Surface Mount LED Ceiling Light (Pack of 1)(2 Year Warranty) (complete in all respect) as directed by Engineer-in-charge: Make:-Philips,Bajaj,GE,Wipro,K-lite,crompton greaves` (690.00) SDS.
Analysis of Rates for 100 HP Control panel board
Good Earth
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
Estimate for repair and renovation with construction of operator room, toilet and boundary wall at water works booster sec 18, ward 02, Division 3A under MCG.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
techsummary_585763.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_585763.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid