Loading…
New: tenders and results on WhatsApp
New: Find tenders, results and companies on WhatsApp, by text or voice note
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.0 L+₹4,145 (0.59%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.1 L+₹9,473 (1.36%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance | |
| 4 | L4₹7.3 L+₹30,755 (4.40%)Admitted-Fee/PreQual/Technical/Finance | L4 | Admitted-Fee/PreQual/Technical/Finance | |
| 5 | L5₹7.3 L+₹30,769 (4.40%)Admitted-Fee/PreQual/Technical/Finance | L5 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | LAKSHMINARAYANAN K L4 | MANIKANDAN L3 | ARUMUGAM SIVASANKARAN SANKARAN L5 | ARAVIND ASSOCIATES L9 | GAJENDRAN L8 | M.VALARMATHI L7 | S Velayutham L10 | V S DURAIVEL L6 | A ANANTHASAYANAM L2 | prathiksha enterprises L1 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling and clearing away and carefully stacking the materials useful for reuse of Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs. | 102 | M2 | 40 ₹4,080 | 38 ₹3,876 Lowest | 39.51 ₹4,030 | 51 ₹5,202 | 42 ₹4,284 | 110 ₹11,220 | 61.3 ₹6,253 | 41 ₹4,182 | 38 ₹3,876 Lowest | 38 ₹3,876 Lowest |
| 2.00 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 36 | M3 | 140 ₹5,040 | 141 ₹5,076 | 145.53 ₹5,239 | 87 ₹3,132 Lowest | 155 ₹5,580 | 230 ₹8,280 | 169.5 ₹6,102 | 153 ₹5,508 | 139 ₹5,004 | 139 ₹5,004 |
| 3.00 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.98 | M3 | 1,386 ₹4,130 | 1,289 ₹3,841 | 1,325.24 ₹3,949 | 1,459 ₹4,348 | 1,482 ₹4,416 | 1,200 ₹3,576 Lowest | 1,646 ₹4,905 | 1,396 ₹4,160 | 1,270 ₹3,785 | 1,330 ₹3,963 |
| 4.00 | Relaying of Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Manual means. | 1.5 | M3 | 4,105 ₹6,158 | 3,995 ₹5,993 | 4,108 ₹6,162 | 4,352 ₹6,528 | 4,389 ₹6,584 | 4,000 ₹6,000 | 4,959.65 ₹7,439 | 4,327 ₹6,491 | 3,939 ₹5,909 | 3,938 ₹5,907 Lowest |
| 5.00 | Relaying of Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. - Mixing by manual means. | 1.4 | M3 | 5,182 ₹7,255 | 5,037 ₹7,052 | 5,192.49 ₹7,269 | 5,589 ₹7,825 | 5,538 ₹7,753 | 4,800 ₹6,720 Lowest | 7,650 ₹10,710 | 5,455 ₹7,637 | 4,966 ₹6,952 | 4,970 ₹6,958 |
| 6.00Reconstruction of Brick work in following Cement Mortar 1:3 (one cement three sand) using best quality Burnt Clay Brick of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. | |||||||||||||
| 6.01 | Foundation and Basement | 10 | M3 | 5,900 ₹59,000 | 5,774 ₹57,740 | 5,937.47 ₹59,375 | 6,140 ₹61,400 | 6,357 ₹63,570 | 5,800 ₹58,000 | 6,630 ₹66,300 | 6,253 ₹62,530 | 5,692 ₹56,920 Lowest | 5,705 ₹57,050 |
| 7.00 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick), etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 9 | M2 | 737 ₹6,633 | 718 ₹6,462 | 739.11 ₹6,652 | 731 ₹6,579 | 789 ₹7,101 | 480 ₹4,320 Lowest | 860.12 ₹7,741 | 778 ₹7,002 | 708 ₹6,372 | 708 ₹6,372 |
| 8.00Relaying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | |||||||||||||
| 8.01 | Foundation and Basement | 1 | M3 | 5,665 ₹5,665 | 5,510 ₹5,510 | 5,657.1 ₹5,657 | 6,522 ₹6,522 | 6,054 ₹6,054 | 6,000 ₹6,000 | 8,205.45 ₹8,205 | 5,968 ₹5,968 | 5,433 ₹5,433 | 5,432 ₹5,432 Lowest |
Tender Value
Refer Docs
EMD Value
₹9,990
Closing Date
11 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PWD Buildings C and M Division
Executive Engineer PWD Buildings C and M Division Thiruvallur
Special repairs to Leaky roof, water supply and sanitary arrangements flooring and painting work arrangements in Health sub centre at Nemilichery in Thiruvallur District.
2026_PWD_717462_8
8/DB/JDO-1/F-6/2026-27
Open Tender
Civil Works - Buildings
Item Rate
60 days
nemilicherry
Please refer tender document
8 documents required · 8 mandatory
₹0
₹9,990
11 Nov 2026
28 Oct 2026
11 Nov 2026
28 Oct 2026
11 Nov 2026
28 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling and clearing away and carefully stacking the materials useful for reuse of Floor finish and dadooing walls in cement mortar with mosaic tiles / glazed tiles / cuddapah slabs. | 102 | M2 | 54.12 | ₹5,520.24 |
| 2 | Earth work open excavation by manual means in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the excavated earth with a lead of 10 mts. within the compound in places shown by the departmental officers and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. | 36 | M3 | 199.33 | ₹7,175.88 |
| 3 | Supplying and filling in foundation, basement, etc with filling Crushed Stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 2.98 | M3 | 1,815.51 | ₹5,410.22 |
| 4 | Relaying of Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying, consolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers - Mixing by Manual means. | 1.5 | M3 | 5,627.11 | ₹8,440.66 |
| 5 | Relaying of Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers. - Mixing by manual means. | 1.4 | M3 | 7,094.64 | ₹9,932.5 |
| 6Reconstruction of Brick work in following Cement Mortar 1:3 (one cement three sand) using best quality Burnt Clay Brick of size 9" x 4 3/8" x 2 3/4" with class designation of 7.5 conforming to IS 1077-1992 for foundation and basement including Cost of Mortar Plasticizer curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally other type of bond shall be done as directed by the Executive Engineer in charge. | |||||
| 6.01 | Foundation and Basement | 10 | M3 | 8,132.51 | ₹81,325.1 |
| 7 | Supplying and erecting centering for plane surfaces such as RCC Floor Slab, Roof Slab, Loft, Landing Slabs, etc with necessary supports and strutting upto 3.60m height in all floors with all cross bracings using MS Sheets made of 10 gauge thick welded with MS angle of Size 25mm x 25mm x 3mm for boarding laid over steel adjustable span of size 2m x 2m (expandable upto 3.60m) and supported by Steel Adjustable Telescopic Props of Size 2m x 2m (expandable upto 3.60m) made with outer steel pipe with dia 50mm (3.60mm thick) and inner steel pipe with dia 40mm (2.90mm thick), etc complete complying with standard specifications. Steel adjustable span and Steel Adjustable telescopic props shall be provided as directed by the departmental Officers. (Payment for centering shall be given after the concrete is laid). | 9 | M2 | 1,011.91 | ₹9,107.19 |
| 8Relaying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability with about (5 cu.m.) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 cu.m.) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost of reinforcement grill and fabricating charges, centering and shuttering and also including laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). | |||||
| 8.01 | Foundation and Basement | 1 | M3 | 7,761.66 | ₹7,761.66 |
stage.html
html • 0.03 MB
finance_861782.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.14 MB
GeneralCondition.pdf
Additional Documents • 0.49 MB
BOQ_861782.xls
BOQ • 0.41 MB
TenderConditions.pdf
Tender Documents • 0.84 MB
corrigendum.pdf
PDF • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .