| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC L1 |
| 2 | L2₹8.4 LRejected-Finance R 35 NAVEEN NAGAR MDA COLONY MORADABAD | MORADABAD | UTTAR PRADESH | 244001 | ₹8.4 L | L2 | Rejected-Finance L2 |
| 3 | L3₹8.5 LRejected-Finance | ₹8.5 L | L3 | Rejected-Finance L3 |
| 4 | L4₹9.1 LRejected-Finance | ₹9.1 L | L4 | Rejected-Finance L4 |
| 5 | L5₹9.1 LRejected-Finance | ₹9.1 L | L5 | Rejected-Finance L5 |
Tender Value
₹10.8 L
EMD Value
₹22,000
Closing Date
29 Jan 2026, 12:00 pmClosed
EE RED MBD
Vikas Bhavan Moradabad
Construction of a volleyball and badminton court in the premises of Kasturba Gandhi Girls School, Kundarki.
2026_REDUP_1106294_5
1114/RED/NIT/2025-26 Dated 11.12.2025
Open Tender
Civil Works
120 days
Moradabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹22,000
Yes
Moradabad
16 Mar 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
29 Jan 2026
14 Jan 2026
16 Jan 2026
Clearing jungle including up rooting of trunk vegetation grass bush wood trees and sapling of girth upto 30cm. Measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50m. outside the periphery of area cleared as per SI.No. 2.31
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (Under Floor) as per SI.No. 2.25 (a)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per SI no. 4.1.8
Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) as per SI No- 6.1.2
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Upto Plinth Lvl as SI No-5.1.2
Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per SI. No.- 5.22 B.1
Clearing jungle including up rooting of trunk vegetation grass bush wood trees and sapling of girth upto 30cm. Measured at a height of 1 meter above ground level and removal of rubbish upto a distance of 50m. outside the periphery of area cleared as per SI.No. 2.31
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil as per SI.No. 2.8.1
Excavating, supplying and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. (Under Floor) as per SI.No. 2.25 (a)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-lll) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) As per SI no. 4.1.8
Brick work with common burnt clay (non modular) bricks of class -150 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) as per SI No- 6.1.2
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level 1:1.5:3 (1 cement : 1.5 coarse sand (zone-lll) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Upto Plinth Lvl as SI No-5.1.2
Steel reinforcement for R.C.C. work ready to use "cut and bend" rebars of approved make from factory/workshop to construction site including placing in position and binding all complete in Thermo-Mechanically Treated bars of grade Fe-500D or more. As per SI. No.- 5.22 B.1
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
5_Kundarki.pdf
Tender Documents • 0.98 MB
BOQ_2041330.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid