| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹2.3 L+₹12,099.20 (5.56%)Admitted-Finance DINAULI TUNDLA FIROZABAD | FIROZABAD | UTTAR PRADESH | 224172 | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s DHARMVIR SINGH L2 | PADAM SINGH L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work in silt clearance including lift up to 1.50 M and lead upto 30.00 M by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by Engineer-in-charge. | 962 | cum | 42 ₹40,404 Lowest | 45 ₹43,290 |
| 2.00 | Scrapping Internal Section of Existing Channel in Slope With Silt upto 5cm. | 37,892 | sqm | 4.2 ₹1,59,146.4 | 3.1 ₹1,17,465.2 Lowest |
| 3.00 | Cleaning thick bushes and thorny jungle without uprooting all cost of labour or machne and etc. | 11,060 | sqm | 1.9 ₹21,014 Lowest | 3.5 ₹38,710 |
| 4.00 | Finishing walls with acrelic smooth exterior emulsion paint (Apex) of approved brand and manufacture(Asian or Burger) and of required shade on new work two or more coat applied @ 1.67 Ltr/10sqm including one coat of primer applied @ 2.20 kg/10sqm icluding cost of all materials, labours, T&P etc. required for proper completion of the work. | 90 | sqm | 100 ₹9,000 Lowest | 200 ₹18,000 |
Tender Value
Refer Docs
EMD Value
₹6,000
Closing Date
7 Oct 2026, 1:00 pmClosed
EXECUTIVE ENGINEER
IRRIGATION DIVISION FIROZABAD
Silt clearance / scrapping of Mr. Punehra From km. 0.000 to km. 10.500
2026_UPIDC_1188447_30
05/EE/2026-27
Open Tender
Civil Works
Item Wise
20 days
Silt clearance / scrapping of Mr. Punehra From km.
Please refer Tender documents.
2 documents required · 2 mandatory
₹856
₹6,000
9 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
7 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in silt clearance including lift up to 1.50 M and lead upto 30.00 M by manual labour or machines. The earth from clearance to be used in side embankment or to be disposed off on spoil banks or as directed by Engineer-in-charge. | 962 | cum | - | - |
| 2 | Scrapping Internal Section of Existing Channel in Slope With Silt upto 5cm. | 37,892 | sqm | - | - |
| 3 | Cleaning thick bushes and thorny jungle without uprooting all cost of labour or machne and etc. | 11,060 | sqm | - | - |
| 4 | Finishing walls with acrelic smooth exterior emulsion paint (Apex) of approved brand and manufacture(Asian or Burger) and of required shade on new work two or more coat applied @ 1.67 Ltr/10sqm including one coat of primer applied @ 2.20 kg/10sqm icluding cost of all materials, labours, T&P etc. required for proper completion of the work. | 90 | sqm | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 5.71 MB
BOQ_2249008.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .