Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.5 LAccepted-AOC NATUNGANJ RAJBATI WEST GATE BURDWAN | BURDWAN | BURDWAN | WEST BENGAL | L1 | Accepted-AOC L1 | |
| 2 | L2₹34.3 L+₹78,351.40 (2.34%)Rejected-Finance GR 8 ADDA 1 FLOOR CITY CENTRE DURGAPUR 713216 | DURGAPUR | PASCHIM BARDHAMAN | WEST BENGAL | 713216 | L2 | Rejected-Finance L2 | |
| 3 | L3₹36.1 L+₹2.7 L (7.94%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
Refer Docs
EMD Value
₹54,000
Closing Date
3 Apr 2021, 11:30 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer PWD Asansol Electrical Division
Executive Engineer PWD Asansol Electrical Division
Temporary Electrical Installation work for 8eight days with Sound proof DG for power backup etc. for deployment of CAPFSPFTAG HQ under Asansol Durgapur Police Commissionerate for WBLA2021 Election Budbud PS 14 nos and Kanksa PS 13 nos
2021_WBPWD_330168_1
WBPWD/EE /AED /e-NIQ-28/2020-21
Open Tender
ELECTRICAL WORKS ORG
Item Rate
ASANSOL
Please refer Tender documents.
4 documents required · 4 mandatory
₹54,000
30 Jun 2021
15 Mar 2021
5 Apr 2021
16 Mar 2021
3 Apr 2021
16 Mar 2021
180 days
Amount
Distribution wiring in 2 or 3 X 1.5 SQmm single core PVC copper wire to light / fan points incl. fixing holder , switch and double board etc, complete on hire basis and dismantling the same(Av Run 6 Mtr)
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 240V A.C. 450 mm/18" sweep pedestal fan and dismentling the same.
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 240V A.C. 1200/1400 mm/48"/52" sweep ceiling fan with down rod as required and dismentling the same.
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 70-100 watt LED flood light fittings. (for 3 days)
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 6 amp plug with switch on TW/MS board with earthing attachment.(for 3 days)
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 15/20 amp plug with switch on TW/MS board with earthing attachment.(for 3 days)
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 18-20 W LED Tube light fittings & all accessories.(for 3 days)
Do - -do- -do- ( After 3 days)
Supplying & Providing on hire basis pendent light fitting with 100/200 watt lamp holder shade etc. complete incl. dismentling the same. (for 3 days)
Do - -do- -do- ( After 3 days)
Providing on hire basis following switches on wooden plank board or suitable angle iron frame incl. providing inter-connection wiring with socketing earthing attachment etc. a) 415 V, 100 A TPN RCCB main switch.(for 3days)
Do - -do- -do- ( After 3 days)
a) 415 V, 63 A TPN RCCB main switch.(for 3days)
Do - -do- -do- ( After 3 days)
Providing on hire basis following Bus-bar chamber on wooden plank board or suitable angle iron frame incl. providing inter-connection wiring with socketing earthing attachment etc. 415 V, 100 A TPN BBC with four bars.(for 3days)
Do - -do- -do- ( After 3 days)
415 V, 200 A TPN BBC with four bars.(for 3days)
Do - -do- -do- ( After 3 days)
Providing on hire basis including 415V 100A TPN 4 pole change over switch on suitable size wooden plank board incl. Interconnection andearthing arrengement. (for 3 days)
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 415V 63A TPN RCCB main switch as incoming with 6 way TPNDB 18Nos (6-32 A MCB). with providing interconnection wiring and dismantling the same (for 3 days)
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 415V 63A TPN RCCB main switch as incoming with 8 way TPNDB 24Nos (6-32 A MCB). with providing interconnection wiring and dismantling the same (for 3 days)
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply & installation of 240V 32A SPN RCCB main switch as incoming with 2+12 way SPNDB(6-32 A MCB). with providing interconnection wiring and dismantling the same (for 3days)
Do - -do- -do- ( After 3 days)
Providing on hire basis including supply/ drawing of single core copper wire for pelmet screen and sound, metal light and dismantling as follows:- 4×16.0+ 2x10 sqmm PVC copper wire (for 3days)
Do - -do- -do- ( After 3 days)
2×10.0+ 1x6 sqmm PVC copper wire (for 3days)
Do - -do- -do- ( After 3 days)
2×6.0+ 1x4 sqmm PVC copper wire (for 3days)
Do - -do- -do- ( After 3 days)
2×4.0 + 1x2.5 sqmm PVC copper wire (for 3days)
Do - -do- -do- ( After 3 days)
2×1.5 + 1x1.5 sqmm PVC copper wire (for 3days)
Do - -do- -do- ( After 3 days)
2x2.5+1x1.5 sqmm PVC copper wire (for 3days)
Do - -do- -do- ( After 3 days)
Earthing with 50 mm dia GI pipe 2.5 to 3 mtrs long and 6/ 8 SWG GI wire with Galv. nuts, bolts, washers etc. below ground level on hire basis and dismantling the same. (for 3days)
Do - -do- -do- ( After 3 days)
Erection of steel tubular/ wooden pole 1.5 Mtr below the ground as per direction of EIC. The foundation to be made by using brick bats and loose earth. At car parking area for compound lighting. Upto 9 mtr
Do - -do- -do- ( After 3 days)
Providing on hire basis incl. supply/laying of 25 sqmm. 4 core AL/Cable.(for 3days)
Do - -do- -do- ( After 3 days)
Providing on hire basis incl. supply/laying of 16 sqmm. 4 core AL/Cable.(for 3days)
Do - -do- -do- ( After 3 days)
Providing on hire basis incl. supply/laying of 10 sqmm. 2 core AL/Cable.(for 3days)
Do - -do- -do- ( After 3 days)
Sound proof generator for hire basis 15 KVA without fuel(for 3days)
Do - -do- -do- ( After 3 days)
Carrying charges of the afore-said DG set incl. all materials, fuel oil from workshop to site and back to workshop after completion of the said job
Charges for labor for temporary electrical installation. a) 1(One) skilled person DG Operator per Shift per day
b) 1(One) Unskilled person per Shift per day
Cost of Diesel for DG Sets storage at different location & periods. i) 15KVA X23 Nos =3.5 Ltr. (per DG Per hour each) X23NosX 3Hr= 241.5 LTr ( Considering 3Hrs/ Day in each Vanue)
DURGAPUR POWER
TARUN KUMAR BARUA
stage.html
html • 0.05 MB
technical_628490.pdf
PDF • 1.62 MB
techsummary_628490.pdf
PDF • 1.62 MB
finance_628490.pdf
PDF • 0.08 MB
BOQ Comparative Chart
xlsx • 0.01 MB
finsummary_628490.pdf
PDF • 0.08 MB
NIQ28PRO.pdf
PDF • 0.64 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .