Tender Value
₹18.9 Cr
EMD Value
₹37.9 L
Closing Date
29 Aug 2026, 3:00 pm5d left
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1178295_1
11/SE-1/2026-27
Open Tender
Civil Works
Piece-work
180 days
Meerut
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹37.9 L
Office of SE 1st IWC Meerut
20 Aug 2026
20 Aug 2026
29 Aug 2026
20 Aug 2026
29 Aug 2026
20 Aug 2026
24 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance of 60M as per direction of Engineer-in-charge | 428.96 | Cum | - | - |
| 2 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 27,316.37 | Cum | - | - |
| 3 | Dewatering with all cost of power, P.O.L,machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work | 3,67,200 | Hr/HP | - | - |
| 4 | Providing and Fixing Centering and shuttering of R.C.C./C.C. work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 31,706.19 | Sqm | - | - |
| 5 | Providing and laying Cement concrete A20 M15 (1:2:4) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 6,203.8 | Cum | - | - |
| 6 | Providing and laying Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 5,104.95 | Cum | - | - |
| 7 | Providing and laying Reinforced Cement concrete A20 M25 (1:1:2) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work as directed by engineer-in-charge. | 337.5 | Cum | - | - |
| 8 | Providing and laying Reinforcement Fe 550 (SAIL/TATA/ZINDALetc.) in cutting, bending, binding, welding and placing in Position inculiding all cost of material, labour and T&P etc. required for proper completion of work as per directed by engineer-in-charge. | 4.22 | MT | - | - |
| 9 | Earth work in embankment by power transported earth with lead beyond 200 m and upto 1 km including excavation, loading, unloading, comaction, ramming, dressing and all lifts etc. with all cost of labour, material and T&P etc. complete as per direction of Engineer in Charge. | 8,480.75 | Cum | - | - |
| 10 | Supplying and fixing Z-sheet pile driving into the canal for making coffer bundh i/c all cost of material, cutting, welding, painting with bitumen, labour and T&P etc (per M.T.) for proper completion of work.(As per IS Code 2314) | 44.32 | MT | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.61 MB
BOQ_2214181.xls
BOQ • 0.29 MB
TDUpload.pdf
Tender Documents • 6.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].