Loading…
Loading…
Tender Value
₹1.5 L
EMD Value
₹2,996
Closing Date
9 Sept 2026, 6:55 pm
Executive Engineer REW Pulwama
Executive Engineer REW Pulwama
RDDDC2627112425- CO CULVERT NEAR BUND SAW AT BATPORA. BLOCK AWANTIPORA
2026_RDPR_321873_10
e- NIT No. 100/2026-27 Dated 22-08-2026
Open Tender
Civil Works
Percentage
Pulwama
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Pulwama
₹2,996
22 Aug 2026
22 Aug 2026
10 Sept 2026
22 Aug 2026
9 Sept 2026
22 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches or drains (not exceeding 1.5M in width as well as 10Sqm on plan) including dressing of sides ramming of bottoms lift up to 1.5M including getting out the excavated soil and disposal of surplus excavated soil within a lead of 1 M from edge of cutting. | - | cum | - | - |
| 2 | P/L in position of stone soling hand packed tightly incl carriage | - | cum | - | - |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.1:4:8 using crushed stone aggregates. | 1 | cum | - | - |
| 4 | Provinding and laying in position cement concrete of specified grade excluding the cost of centring and shuttering all work upto plinth level in 1:2:4 mix (1cement: 2 coarse sand: 4 graded stone aggregate with 20mm nominal size | - | cum | - | - |
| 5 | plum 20% | 1 | cum | - | - |
| 6 | Centering and shuttering including strutting propping etc for removal of same for Suspended floors, roofs, landings, balconies and access platforms | - | sqm | - | - |
| 7 | Centring and shuttering including propping, strutting and removal of form work for foundations, footings, bases of columns for mass concrete | 1 | sqm | - | - |
| 8 | Backfilling behind abuts and approach by boulders/GSB complete including carriage | 1 | cum | - | - |
| 9 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with 1:1½:3 (1 cement :1½ coarse sand: 3 graded stone aggregate 20 mm nominal size) | - | cum | - | - |
| 10 | Providing and fixing of reinforcement steel | - | kg | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.51 MB
BOQ_1076318.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].