| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.6 LAccepted-AOC | ₹28.6 L | L1 | Accepted-AOC L1 Accepted |
| 2 | L2₹29.6 L+₹96,108.35 (3.36%)Rejected-Finance | ₹29.6 L+₹96,108.35 (3.36%) | L2 | Rejected-Finance Above Estimate Rate |
| Sl No | Description | Qty | Unit | KRN AND CO L2 | R GANESAN L1 |
|---|---|---|---|---|---|
| 1.00Periodic Renewal from PK road to Karaiyur road in Kovanur (via) Neiveli, Valakuruhci Road Km 0/0-1/620 | |||||
| 2.00Advance patchwork to an average thickness upto 50mm using premixed 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved source to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable , including cost and conveyance of 60/70 grade bitumen to worksite and all incidental charges such as storage, handling charges etc, including heating the bitumen for premixing all labour charges and T & P charges for patching thr surface and all other incidental charges etc complete as per MORTH specification. | |||||
| 3.00 | Km 0/0 - 1/0 | 6.73 | Cum | 3,750 ₹25,237.5 | 3,600.93 ₹24,234.26 Lowest |
| 4.00 | km 1/0-1/620 | 4.44 | Cum | 3,750 ₹16,650 | 3,590.37 ₹15,941.24 Lowest |
| 5.00Advance patchwork to an average thickness upto 25mm using premixed 13.20mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved source to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable , including cost and conveyance of 60/70 grade bitumen to worksite and all incidental charges such as storage, handling charges etc, including heating the bitumen for premixing all labour charges and T & P charges for patching thr surface and all other incidental charges etc complete as per MORTH specification. | |||||
| 6.00 | Km 0/0 - 1/0 | 4.12 | Cum | 4,000 ₹16,480 | 3,925.93 ₹16,174.83 Lowest |
| 7.00 | km 1/0-1/620 | 2.57 | Cum | 4,000 ₹10,280 | 3,915.37 ₹10,062.5 Lowest |
| 8.00Applying tack coat over BT surface (not treated with primer) using 2.5 kg of bitumen emulsion per 10 Sqm. Including cost of bitumenouus emulsion including conveyance to actual work spot handling charges including labour charges for brushing, cleaning, and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bitumenous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification. | |||||
| 9.00 | km 0/0-1/650 | 6,107.88 | Sqm | 15 ₹91,618.2 | 13.42 ₹81,967.75 Lowest |
| 10.00Bituminous Concrted Grading II 25-45mm( Using Plastic Waste 6%) Providing and laying bitumenous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bitumenous binder @ 5.4 to 5.6% by weight of total mix and filler, transporting the hotmix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT &H specifications clause 507 complete in all respects. | |||||
Tender Value
₹28.9 L
EMD Value
₹58,000
Closing Date
17 Aug 2023, 3:00 pmClosed
JOINT DIRECTOR/PROJECT DIRECTOR
DRDA, Pudukkottai
Pack-2- Periodic Renewal from L031-PK road to Karaiyur in kovanur road via Neiveli valakurichy KM 0/0-1/620
2023_RDTN_126711_1
PACKAGE No.2 - PMGSY PERIODIC RENEWAL 2022-2023
Open Tender
Civil Works - Roads
Item Rate
120 days
PUDUKKOTTAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹58,000
9 Sept 2025
25 Jul 2023
17 Aug 2023
25 Jul 2023
17 Aug 2023
25 Jul 2023
Amount
Periodic Renewal from PK road to Karaiyur road in Kovanur (via) Neiveli, Valakuruhci Road Km 0/0-1/620
Advance patchwork to an average thickness upto 50mm using premixed 45mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved source to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable , including cost and conveyance of 60/70 grade bitumen to worksite and all incidental charges such as storage, handling charges etc, including heating the bitumen for premixing all labour charges and T & P charges for patching thr surface and all other incidental charges etc complete as per MORTH specification.
Advance patchwork to an average thickness upto 25mm using premixed 13.20mm IRC size HBG crusher chips/metal over the existing BT surface using 44kg of bitumen of 60/70 grade per one cum including cost and conveyance of chips/metal from approved source to work site and stacking them to departmental metric gauge for premeasurement including cost of Bitumen and all taxes payable , including cost and conveyance of 60/70 grade bitumen to worksite and all incidental charges such as storage, handling charges etc, including heating the bitumen for premixing all labour charges and T & P charges for patching thr surface and all other incidental charges etc complete as per MORTH specification.
Applying tack coat over BT surface (not treated with primer) using 2.5 kg of bitumen emulsion per 10 Sqm. Including cost of bitumenouus emulsion including conveyance to actual work spot handling charges including labour charges for brushing, cleaning, and preparing the surface for laying the tack coat and labour and machinery charges for applying the required quantity of bitumenous emulsion including hire, fuel and running charges for all tools and plants employed for the work including all other incidental charges such as barricading and providing danger lights, flags etc., complete as per standard specification.
Bituminous Concrted Grading II 25-45mm( Using Plastic Waste 6%) Providing and laying bitumenous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonne per hour using crushed aggregates of specified grading premixed with bitumenous binder @ 5.4 to 5.6% by weight of total mix and filler, transporting the hotmix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRT &H specifications clause 507 complete in all respects.
Providing and fixing of Name board
Providing and fixing of Logo board
Providing and fixing of Citizen Information Board
Providing and fixing of Sign board
Provision for KM Stones (size 1.65 x .4 x0.15m)
Provision for HM Stones (size 0.75 x 0.23 x0.10m)
Road Marking with hot applied thermoplastic compound with Reflectorising Glass Beads on Bituminous surface
Maintenance of the road
Towards the charges for routline maintenance of the road work executed under PMGSY including dressing of berms by refilling the gully with the earth from borrow pits, cleaning of wild seasonal growth on berms, destilting of side drains and CD works, white washing guard stones, painting of KM, HM stones, parapets, cutting of branches of trees, refixing displaced guard stones, caution boards, speed limit boards etc., with the periodicity for the above activities as prescribed in IRCSP- 20:2002 and as directed by the departmental officers except for the constructional defects which has to be rectified by the contractor at his own cost
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
KRN AND CO
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .