Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 215 G 27 SECTOR 3 ROHINI DELHI 110085 | NORTH WEST | DELHI | 110085 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
₹25.5 L
EMD Value
₹51,007
Closing Date
28 Dec 2020, 3:00 pmClosed
Dy. Dir (Hort.) Dwk/DDA
Dy. Dir (Hort.) Dwk/DDA
M/o Various colony under Dwk. Zone N/A II M/o 45 mtr. wide road no. 202 with RSP and Central verge plantation at dwarka (from red light sec-4/12 and 3/13 to Sec-6/10 and 7/9 red light)
2020_DDA_604167_1
121/DD/Hort.Dwk./DDA/2020-21
Open Tender
Miscellaneous Works
Item Rate
365 days
Dy. Dir (Hort.) Dwk/DDA
Please refer Tender documents
10 documents required · 10 mandatory
₹0
₹51,007
18 Jan 2021
18 Dec 2020
29 Dec 2020
18 Dec 2020
28 Dec 2020
18 Dec 2020
Amount
Complete maintenance of trees (Out side garden features), jobs like making of basin at regular interval i/c watering, weeding, pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department and other T & P material/articles shall be provided by the contractor) and as per direction of officer in charge. Complete maintenance of trees up to 4 & up to 3 year Slow & Fast growing group. Tree Plants = 585 Nos. X 12 Month = 7020 Nos. ( 1 mali for 250 Nos. tree)
Complete maintenance of trees 4-8 & 5-6 year Slow & Fast growing group. Tree Plants= 276 Nos. X 12 Month= 3312 Nos.( 1 mali for 300 Nos. tree)
Complete maintenance of trees beyond 8 year Slow & beyond 6 Fast growing group. Tree Plants= 449 Nos. X 12 Month= 5388 Nos.( 1 mali for 1200 Nos. tree)
Complete maintenance of shrubs (Out side garden features), jobs like making of basin at regular interval i/c watering, weeding, pruning & application of fertilizer etc, (excluding the cost of material which shall be supplied by the department) and as per direction of officer in charge. Shrubs Plants = 7550 Nos. X 12 Month= 90600 Nos.( 1 mali for 1200 Nos. shrubs)
Providing and wartering of plants through water tanker of Horticulture features i.e. tree, shrubs, hedge/edge, ground cover etc. at the site of work. Water tanker having 5000 lit. capacity with one labour for watering i/c cost of water, filling of tanker, wartering at site with all leads and lifts as per direction of officer-in-charge.
Subhash Chander Gupta and Company
S K Associate
DEV HORTICULTURE SERVICE
s k engineers & contractors
SUNIL KUMAR MITTAL
R. K Chauhan
rakesh kumar
Satish Kumar
P.S. KHATANA ASSOCIATES
Hortitech India
manish kumar tanwar
K K Rana Construction Co
M/s Anand Prakash Gupta
PIONEER HORTICULTURIST PVT LTD
Jagjeet singh
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .