Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹68.9 LAccepted-AOC | ₹68.9 L | 1 | Accepted-AOC Y |
| 2 | 2₹68.9 L+₹113.12 (<0.01%)Rejected-Finance 00 NEAR LAXMI MANDIR JHANSI ROAD ORAI JHANSI ROAD RAM NAGAR JALAUN UTTAR PRADESH 285001 UDYAM UP 37 0014656 | JALAUN | UTTAR PRADESH | 285001 | ₹68.9 L+₹113.12 (<0.01%) | 2 | Rejected-Finance N |
Tender Value
₹69.7 L
EMD Value
₹1.4 L
Closing Date
12 Jun 2026, 9:00 amClosed
SE RED Circle Jhansi
SE RED Circle Jhansi
Block Chirgaon ke Chirgaon Nagar mai Master colony se pulia tak dono or nala nirman karya
2026_REDUP_1155905_9
33/SE/RED/Tender/Jhansi/26-27 Date 13-04-2026
Open Tender
Civil Works
Percentage
240 days
Block Chirgaon ke Chirgaon Nagar mai Master colony
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.4 L
Yes
13 Aug 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
12 Jun 2026
1 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supply and fixing sign board i/c letter writting all comp. | - | Per No. | 4,750 | - |
| 2 | Excavation in foundation in moorum mixed soil (in Bundelkhand area) including lift upto 1.5 m. and lead upto 30 m. and including filling, watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge a distance of 30 m. from the foundation trenches. | - | Per Cum. | 174.14 | - |
| 3 | Stone dust filling in foundation trenches as per standard data book for analysis or rates for rural roads | 1 | Per Cum. | 998.45 | ₹997.45 |
| 4 | Cement concrete in 1:4:8 with cement, sand and (22.40-53) mm granite stone ballast (crusher broken) in foundation including supply of all materials, labours and T&P etc. required for proper completion of the work . | - | Per Cum. | 4,018.5 | - |
| 5 | R.C.C. with 1:1½:3 cement, coarse sand and approved 20 mm. gauge granite stone grit including supply of all materials, labour and T&P etc. required for proper completion of work. | 1 | Per Cum. | 5,688.47 | ₹5,682.78 |
| 6 | Mild steel or iron work in reinforcement such as R.B.or RCC work. | 1 | Per Qtl | 6,538.85 | ₹6,532.31 |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
BOQ_2165535.xls
BOQ • 0.30 MB
SBD33new.pdf
Tender Documents • 1.99 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .