| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.6 LAccepted-AOC | L1 | Accepted-AOC Being lowest. | |
| 2 | L2₹37.0 L+₹3.4 L (10.2%)Rejected-Finance | L2 | Rejected-Finance Not lowest | |
| 3 | L3₹41.7 L+₹8.1 L (24.0%)Rejected-Finance 0 HISAR HISAR HARYANA 125004 UDYAM HR 06 0052049 | HISAR | HARYANA | 125004 | L3 | Rejected-Finance Not lowest |
| Sl No | Description | Qty | Unit | Raj Enterprise L3 | Engineers India L1 | R.S.V Associates L2 |
|---|---|---|---|---|---|---|
| 1.00 | Taking down cement plaster or lime plaster on walls /ceiling of any description from concrete or brick wall etc including raking out joints, hacking for key, scrubbing down with water and disposing off the retrieved debris as directed including necessary scaffoldings etc complete all as specified and directed | 3,701.81 | SQM | 25 ₹92,545.25 Lowest | 30 ₹1,11,054.3 | 50 ₹1,85,090.5 |
| 2.00 | Materials and labour for rendering 15mm thick in cement mortar (1:6) on fair faces of brick work or concrete surfaces, finished even and smooth without using extra cement, complete all as specified and directed. | 2,066.4 | SQM | 190 ₹3,92,616 Lowest | 260 ₹5,37,264 | 250 ₹5,16,600 |
| 3.00 | Materials and labour for rendering 20mm thick in two layers of 10 mm thick each in cement mortar (1:4) on fair faces of brick work or concrete surfaces,WPC shall be mixed with morter of top layer, finished even and fair, complete all as specified and directed.complete all as specified and directed. (Note: WPC shall be measured and paid separately as supply only) | 995.81 | SQM | 225 ₹2,24,057.25 Lowest | 350 ₹3,48,533.5 | 310 ₹3,08,701.1 |
| 4.00 | Materials and labour for rendering 5mm thick in cement mortar (1:3) on ceiling surfaces, finished even and smooth without using extra cement, complete all as specified and directed. | 639.6 | SQM | 240 ₹1,53,504 | 210 ₹1,34,316 | 112 ₹71,635.2 Lowest |
| 5.00 | Supply only integral Water Proofing Compound of approved make. | 488.5 | KG | 70 ₹34,195 | 75 ₹36,637.5 | 44 ₹21,494 Lowest |
| 6.00 | Materials and labour for preparation of new plastered surfaces of wall and applying 1mm thick wall care putty of approved make and preparing the surface to receive finishes (primer, distemper, paint etc.) complete all as specified and directed and as per manufacturers instruction. | 3,062.21 | SQM | 60 ₹1,83,732.6 | 42 ₹1,28,612.82 Lowest | 70 ₹2,14,354.7 |
| 7.00 | Materials and labour for complete removal of existing paint from surfaces of wall and applying 1mm thick wall care putty of approved make and preparing the surface to receive finishes (primer, distemper, paint etc.) complete all as specified and directed and as per manufacturers instruction. | 9,729.79 | SQM | 65 ₹6,32,436.35 | 45 ₹4,37,840.55 Lowest | 84 ₹8,17,302.36 |
| 8.00 | Materials and labour for applying three coats of white wash on newly plastered ceiling surface including preparation of surface, complete all as specified and directed. | 639.6 | SQM | 30 ₹19,188 | 30 ₹19,188 | 21 ₹13,431.6 Lowest |
| 9.00 | Materials and labour for preparation old decorated surfaces of ceiling including brooming down or steel wire brushing scraping down smoke shoot, moulds, moss and efflorescent salt sand trading oil and greasy spots and applying two coats of white wash complete all as specified and directed. | 1,635.4 | SQM | 25 ₹40,885 Lowest | 35 ₹57,239 | 30 ₹49,062 |
| 10.00 | Materials and labour for applying two coats of oil bound distemper of approved colour with roller over one coat of primer on newly prepared surfaces of walls complete all as specified and directed. | 8,265.6 | SQM | 130 ₹10,74,528 | 110 ₹9,09,216 | 90 ₹7,43,904 Lowest |
Tender Value
₹46 L
EMD Value
₹92,000
Closing Date
5 Jun 2026, 6:00 pmClosed
GE SEVOKE ROAD
GE Sevoke Road Post Salugara Dist Jalpaiguri PIN 734008
PERIODICAL SERVICES TO CERTAIN JCO AND OR MD ACCN AT SEVOKE ROAD MIL STN UNDER GE SEVOKE ROAD
2026_MES_758706_2
8595/SEV OF 2026-27
Open Tender
Civil Works
Item Rate
180 days
GE SEVOKE ROAD
As per tender documents
8 documents required · 8 mandatory
₹500
GE SEVOKE ROAD
₹92,000
4 Aug 2026
16 May 2026
8 Jun 2026
16 May 2026
5 Jun 2026
30 May 2026
16 May 2026 - 25 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down cement plaster or lime plaster on walls /ceiling of any description from concrete or brick wall etc including raking out joints, hacking for key, scrubbing down with water and disposing off the retrieved debris as directed including necessary scaffoldings etc complete all as specified and directed | 3,701.81 | SQM | - | - |
| 2 | Materials and labour for rendering 15mm thick in cement mortar (1:6) on fair faces of brick work or concrete surfaces, finished even and smooth without using extra cement, complete all as specified and directed. | 2,066.4 | SQM | - | - |
| 3 | Materials and labour for rendering 20mm thick in two layers of 10 mm thick each in cement mortar (1:4) on fair faces of brick work or concrete surfaces,WPC shall be mixed with morter of top layer, finished even and fair, complete all as specified and directed.complete all as specified and directed. (Note: WPC shall be measured and paid separately as supply only) | 995.81 | SQM | - | - |
| 4 | Materials and labour for rendering 5mm thick in cement mortar (1:3) on ceiling surfaces, finished even and smooth without using extra cement, complete all as specified and directed. | 639.6 | SQM | - | - |
| 5 | Supply only integral Water Proofing Compound of approved make. | 488.5 | KG | - | - |
| 6 | Materials and labour for preparation of new plastered surfaces of wall and applying 1mm thick wall care putty of approved make and preparing the surface to receive finishes (primer, distemper, paint etc.) complete all as specified and directed and as per manufacturers instruction. | 3,062.21 | SQM | - | - |
| 7 | Materials and labour for complete removal of existing paint from surfaces of wall and applying 1mm thick wall care putty of approved make and preparing the surface to receive finishes (primer, distemper, paint etc.) complete all as specified and directed and as per manufacturers instruction. | 9,729.79 | SQM | - | - |
| 8 | Materials and labour for applying three coats of white wash on newly plastered ceiling surface including preparation of surface, complete all as specified and directed. | 639.6 | SQM | - | - |
| 9 | Materials and labour for preparation old decorated surfaces of ceiling including brooming down or steel wire brushing scraping down smoke shoot, moulds, moss and efflorescent salt sand trading oil and greasy spots and applying two coats of white wash complete all as specified and directed. | 1,635.4 | SQM | - | - |
| 10 | Materials and labour for applying two coats of oil bound distemper of approved colour with roller over one coat of primer on newly prepared surfaces of walls complete all as specified and directed. | 8,265.6 | SQM | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.50 MB
BOQ_857750.xls
BOQ • 0.28 MB
RE-TENDERDOCUMENTS8595.pdf
Tender Documents • 1.55 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .