Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
Refer Docs
EMD Value
₹42,300
Closing Date
8 Oct 2026, 2:00 pmClosed
EE
EE
3. Ward-30 ke antargat Kakadev Navin Nagar mein Bhawan Sankhya 117/73 Shri Mool Prakash ke Bhawan Sankhya 117/65 Shri Mahesh Chandra Shrivastav ji ke makan ke saamne tak 300 MM vyaas ki 70 meter sewer line badalne evam 06 nag manhole nirman ka karya.
2026_DOLBU_1192111_3
JalKal / 2657 / EE Zone 6
Open Tender
Miscellaneous Works
Percentage
JALKAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹500
FC
₹42,300
8 Oct 2026
3 Oct 2026
8 Oct 2026
3 Oct 2026
8 Oct 2026
3 Oct 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling of C.C. Road including Sorting Out & stacking of Serviceable Mat. including Supply of lab, T&P all comp. (UPJN SOR 2023-24) | 82.44 | Sqm | 404.6 | ₹33,355.22 |
| 2 | Excavation of Foundation in Ordinary soil including Lift Up to 1.50 Mtr With Supply of lab, T&P etc all comp. (UPJN SOR 2023-24 Item Code-3001) | 114.21 | Cum | 291.89 | ₹33,336.76 |
| 3 | Dismantling of 200 mm dia old SW Pipe (UPJN SOR Item Code-3111) | 70 | Mtr | 170.36 | ₹11,925.2 |
| 4 | Concrete work With 20 Gauge Brick Blast, L.Sand & Cement in foundation in Prop. of 10:5:1 including Supply Lab, Mat, T&P etc all Comp. | 5.72 | Cum | 4,747.35 | ₹27,154.84 |
| 5 | Making Necessary Arrangement of Barricating With Sal ballies, Red Flag, Lab, T&P etc all Comp. | 85 | Rmt | 218 | ₹18,530 |
| 6 | 1st Class Brick Work with 1:3 Cement & Coarse Sand mortar & including Supply of lab, Mat, T&P etc all Comp. | 10.66 | Cum | 7,202.9 | ₹76,782.91 |
| 7 | 12 mm thick plaster with 1:3 cement & Sand mortar with Supply of lab, Mat, T&P etc all comp. | 38.88 | Sqm | 237.17 | ₹9,221.17 |
| 8 | Providing Bier to Retain Sewage water etc all Comp. | 4 | Nos | 450 | ₹1,800 |
| 9 | RCC Work with Cement, C.Sand & 20 mm Gauge appd. stone ballast in Prop. of 1:1.5:3 in Slab including Supply of Lab, Mat, T&P etc all comp. | 2.16 | Cum | 11,278.57 | ₹24,361.71 |
| 10 | Mild steel or Iron Work in Slab. | 1.7 | Qtl | 13,900 | ₹23,630 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.83 MB
Tendernotice_2.pdf
PDF • 9.75 MB
BOQ_2249707.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .