Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance BINOLI ROAD GANDHI COLONY BUS STAND BAGPAT UTTAR PRADESH 250611 | BAGHPAT | UTTAR PRADESH | 250611 | Admitted-Finance |
| 2 | Admitted-Finance 59 16 RAM NAGAR ROTI GODAM KRISHNAPURI MATHURA MATHURA UTTAR PRADESH 281001 | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
| 3 | Admitted-Finance 2ND FLOOR SHOP NO 303 MARUTI PLAZA RONCHI BANGAR TOWNSHIP MATHURA | MATHURA | UTTAR PRADESH | 281001 | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹21.2 L
EMD Value
₹21,000
Closing Date
10 Jan 2022, 1:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE ETC Mathura
132 KV S/S Aurangabad Mathura
Work of Patrolling and Annual Maintenance of 220KV and 132 KV Lines Under ETSD-I and ETSD-II Under ETD Mathura
2021_UPTCL_663073_1
ET-52/ETC(M)/21-22
Open Tender
Electrical Works
Lump-sum
365 days
Under ETC Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,770
EE ETD Mathura
₹21,000
15 Jan 2022
23 Dec 2021
11 Jan 2022
23 Dec 2021
10 Jan 2022
23 Dec 2021
120 days
Amount
Regular Tower to Tower ground quarterly patrolling of approximate Total 250.48 Kms. long following lines of 220/132 KV. detection of defects like missing/theft tower members, hot point, puncture insulator disc, dislocation of vibration dampers/damaged conductor/earthwire, checking of foundation & position of tree in the corridor of the line, patrolling shall be done on quarterly basis i.e. 04 times in a year (250.48X4=1001.92 KM).
(a) 132 KV Agra South(400)- Mathura line up to lilo point - 32 km
(b) 132 KV Gokul (220)- Mathura line - 06 km
(c) 132 KV Baad T - Mathura line - 5.5 km
(d) 132 KV Chhata -kosi 1st line - 15.0km
(e) 132 KV Chhata -kosi 2nd line- 14.5km
(f) 132 KV D/C Chhata - kosi (UPSIDC) line - 22.654
(g) 132 KV Gokul (220)-Maanth line -28 km
(h) 220 KV Agra(400)-Gokul line -39.5km
(i) LILO of 220 kv Gokul - hathras at 400 kv maanth Mathura -60km
(j) 220 KV Gokul - Mathura(400) line up to LILO point of 220 kv Gokul - hathras line-20km
(k)Section of 132 KV Maant -Maant line from tower no 76 to 98 of old 132 KV Bamauli -Maant line-7.33km
Tower top patrolling of line of faulty section to ascertain the faults like polluted insulators,defective insulators & fittings & red hot jumpers and tightening of jumpers
Submission of patrolling report on prescribed computerized performa in 4 sets after each patrolling duly binded.
Lopping, chopping and cutting of trees branches above 0.5 metre grith in the 27 Meters corridor line and stacking of above cuttings at proper palce far from the line.
Clearing of nest from the tower insulator formed by birds.
Emergency patrolling of above line during tripping to detect the exact fault location & type of fault.
Fabrication & fixing of missing tower members including carriage of steel angles from s/s store to work site ,punching holes for proper replacements and tightening of nuts and bolts and bolts puching and chamfering at different tower locations.
Fixing and punching of missing nut & bolt of tower including carriage nut & bolt from S/S store to work site nut & bolt provide by department.
Back filling of earth across the tower foundation wherever required including cost of material, labour, T&P etc. and its transportation up to the working site.
Repairing of foundation coping, wherever required including cost of material, labour, T&P etc and its transportation up to the site.
Jumper tightning at tension tower from both side work including providing nut bolt and all T&P for proper tightning
Strengthening/Replacement of damaged jumpers at tension towers or Connecting back Jumper in case of Jumper failure
Replacement of damaged/puncture insulators string at different tower location including cartage of material from store to work site of the above line. All the manpower & T&P shall be provided by tenderers for completion of work (except river tower)
(a) For Replacement of Suspension String
(b ) For tension String
Strengthening of earthwire including replacement /tightening of suspension clamp/copper bond/bull dog clamp as per site requirement.
Stringing of broken earthwire 7/9 SWG (single side per section ) to attend the breakdown ,if any
Stringing of broken Panther /Zebra conductor (per phase per section) to attend the breakdown ,if any
M/S DHARMENDRA CHAUDHARY
MEERA GYAN ENTERPRISES
SHRISTHI ENTERPRISES
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .