| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.4 LAdmitted-Finance KHERMIA GAON NAMRUP PO PARBATPUR PIN 786623 | DIBRUGARH | ASSAM | 786623 | ₹66.4 L | L1 | Admitted-Finance |
| 2 | L2₹71.7 L+₹5.3 L (7.94%)Admitted-Finance NAGAMATI KHEREMIA VILLAGE NAMRUP ROAD PARBATPUR DIBRUGARH 786623 | DIBRUGARH | ASSAM | 786623 | ₹71.7 L+₹5.3 L (7.94%) | L2 | Admitted-Finance |
| 3 | L3₹72.3 L+₹5.9 L (8.83%)Admitted-Finance | ₹72.3 L+₹5.9 L (8.83%) | L3 | Admitted-Finance |
| 4 | L4₹72.7 L+₹6.3 L (9.44%)Admitted-Finance | ₹72.7 L+₹6.3 L (9.44%) | L4 | Admitted-Finance |
| 5 | L5₹74.3 L+₹7.9 L (11.9%)Admitted-Finance | ₹74.3 L+₹7.9 L (11.9%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | B.G. Enterprises L2 | SHRI NITU SONOWAL L1 | Rynaa Constructionz India L8 | PAPU CHALIHA L3 | PANKAJ KUMAR GOGOI L5 | M/S GANPATI ENTERPRISE L4 | HIMANSHU BHUYAN L6 | PANKAJ BAKATIAL L7 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic excavator)/ manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in- charge.(All kind of soil) | 658.13 | cum | 100 ₹65,813 | 144.63 ₹95,185.34 | 223 ₹1,46,762.99 | 73 ₹48,043.49 Lowest | 123.72 ₹81,423.84 | 158 ₹1,03,984.54 | 200 ₹1,31,626 | 213 ₹1,40,181.69 |
| 2.00 | Providing Soling in foundation and under floor with stone/best quality picked jhama brick,sand packed and laid to level and in panel after preparing the subgrade as directed including all labour and materialsand if necessary dewatering,complete. Brick soiling | 280.8 | sqm | 350 ₹98,280 | 347.22 ₹97,499.38 | 400 ₹1,12,320 | 215 ₹60,372 Lowest | 313.4 ₹88,002.72 | 380 ₹1,06,704 | 390 ₹1,09,512 | 521 ₹1,46,296.8 |
| 3.00 | Providing and laying in position cement concrete of specified grade
excluding the cost of centering and shuttering - All work up to plinth
level ,1:5:10 (1 cement : 5 coarse sand (zone-III) derived from natural
sources : 10 graded stone aggregate 40 mm nominal size
derived from natural sources) | 32.76 | cum | 3,500 ₹1,14,660 | 4,259.68 ₹1,39,547.12 | 4,450 ₹1,45,782 | 5,000 ₹1,63,800 | 4,543.25 ₹1,48,836.87 | 4,654 ₹1,52,465.04 | 3,100 ₹1,01,556 Lowest | 4,171.44 ₹1,36,656.37 |
| 4.00 | Providing and laying in position specified grade of reinforced cement
concrete, excluding the cost of centering, shuttering, finishing and
reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural
sources : 3 graded stone aggregate 20 mm nominal size de
rived from natural sources) | 211.9 | cum | 6,000 ₹12,71,400 | 5,888.39 ₹12,47,749.84 Lowest | 7,800 ₹16,52,820 | 6,800 ₹14,40,920 | 6,304.89 ₹13,36,006.19 | 6,433 ₹13,63,152.7 | 6,400 ₹13,56,160 | 6,481 ₹13,73,323.9 |
| 5.00 | Centering and shuttering including strutting, propping etc. and removal
of form for: Foundations, footings, bases of columns, etc. for mass concrete. | 1,695.2 | sqm | 125 ₹2,11,900 | 216.79 ₹3,67,502.41 | 290 ₹4,91,608 | 99 ₹1,67,824.8 Lowest | 273.33 ₹4,63,349.02 | 237 ₹4,01,762.4 | 180 ₹3,05,136 | 204 ₹3,45,820.8 |
| 6.00 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : Cement mortar 1:4 (1 cement : 4 coarse sand) | 334.8 | cum | 8,200 ₹27,45,360 | 5,992.51 ₹20,06,292.35 | 7,800 ₹26,11,440 | 7,900 ₹26,44,920 | 6,513 ₹21,80,552.4 | 6,547 ₹21,91,935.6 | 7,500 ₹25,11,000 | 5,896 ₹19,73,980.8 Lowest |
| 7.00 | CEMENT PLASTER (IN COARSE SAND):15 mm cement plaster on rough side of single or half brick wall of
mix: 1:4 (1 cement: 4 coarse sand) | 3,226.6 | sqm | 235 ₹7,58,251 | 239.14 ₹7,71,609.12 | 270 ₹8,71,182 | 199 ₹6,42,093.4 Lowest | 286.99 ₹9,26,001.93 | 261 ₹8,42,142.6 | 200 ₹6,45,320 | 208 ₹6,71,132.8 |
| 8.00 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. 65 x 65 x 5 mm angle | 1,576.57 | kg | 76 ₹1,19,819.32 | 65.5 ₹1,03,265.34 Lowest | 91 ₹1,43,467.87 | 85 ₹1,34,008.45 | 81.8 ₹1,28,963.43 | 72 ₹1,13,513.04 | 78 ₹1,22,972.46 | 96 ₹1,51,350.72 |
| 9.00 | Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4m or 3.00 m apart and with 9 horizont al R.B.T. reinforced barbed wire, stud tied with G.I. st aples and G.I. clips to retain horizontal, including necessary bolt s or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T .) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately) | 520 | Rm | 200 ₹1,04,000 Lowest | 213.77 ₹1,11,160.4 | 340 ₹1,76,800 | 250 ₹1,30,000 | 261.93 ₹1,36,203.6 | 234 ₹1,21,680 | 680 ₹3,53,600 | 315 ₹1,63,800 |
| 10.00 | Steel reinforcement for R.C.C. work including straightening, cutting,
bending, placing in position and binding all complete upto plinth level:Mild steel and Medium Tensile steel bars | 18,512.15 | Kg | 72 ₹13,32,874.8 | 62.62 ₹11,59,230.83 Lowest | 81 ₹14,99,484.15 | 70 ₹12,95,850.5 | 74.64 ₹13,81,746.88 | 68.41 ₹12,66,416.18 | 77 ₹14,25,435.55 | 93 ₹17,21,629.95 |
Tender Value
Refer Docs
EMD Value
₹1.7 L
Closing Date
15 Sept 2025, 3:00 pmClosed
Dy G M CnP
APL Namrup
Construction of new boundary wall running parallel to Dhodar Ali(APWD road) from Gate No-1 to towards NTPS(Phase-II) at APL , Namrup
2025_ICD_47101_1
APL/CnP/Civil/25-26/512
Open Tender
Civil Works - Building
Item Rate
120 days
APL Namrup
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,600
₹1.7 L
Yes
4 Nov 2025
29 Aug 2025
16 Sept 2025
29 Aug 2025
15 Sept 2025
29 Aug 2025
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .