Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.5 LAdmitted-Technical | L1 | Admitted-Technical BQR satisfied | |
| 2 | L2₹14.2 L+₹1.8 L (14.1%)Admitted-Technical | L2 | Admitted-Technical BQR satisfied | |
| 3 | L3₹15.5 L+₹3.0 L (24.0%)Rejected-Technical | L3 | Rejected-Technical BQR conditions not satisfied |
| Sl No | Description | Qty | Unit | YAMINEE ELECTRICAL PROJECTS PRIVATE LIMITED L2 | RMITHA POWER AND INFRA (OPC) PRIVATE LIMITED L1 | V BEST ENGINEERS L3 |
|---|---|---|---|---|---|---|
| 1.00 | Supply of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm | 0.8 | KM | 12,00,000 ₹11,32,800 | 10,50,000 ₹9,91,200 Lowest | 11,00,000 ₹10,38,400 |
| 2.00 | Supply of Cable Straight Through Joint Kit suitable for 95 sq. mm | 1 | Set | 6,000 ₹7,080 | 4,600 ₹5,428 Lowest | 5,000 ₹5,900 |
| 3.00 | Supply of T Jointing Kit | 1 | Set | 200 ₹236 | 10 ₹11.8 Lowest | 1,000 ₹1,180 |
| 4.00 | Supply of End Termination Kit | 4 | Set | 5,200 ₹24,544 | 4,500 ₹21,240 | 1,000 ₹4,720 Lowest |
| 5.00 | Supply of Suspension Clamp Assembly including Pole Clamps | 21 | Set | 860 ₹21,310.8 | 780 ₹19,328.4 | 500 ₹12,390 Lowest |
| 6.00 | Supply of Dead End Clamp / Anchor Clamp Assembly including Brackets, Pole Clamps | 8 | Set | 950 ₹8,968 | 860 ₹8,118.4 | 500 ₹4,720 Lowest |
| 7.00 | Supply of Bolt & Nuts for AB Cable | 28 | Loc | 125 ₹4,130 | 100 ₹3,304 Lowest | 100 ₹3,304 Lowest |
| 8.00 | Supply of Spiral Earth Electrodes | 28 | No. | 320 ₹10,572.8 | 284 ₹9,383.36 Lowest | 1,000 ₹33,040 |
| 9.00 | Supply of Grounding Connection for Messenger Wire | 28 | No. | 125 ₹4,130 | 100 ₹3,304 Lowest | 2,000 ₹66,080 |
| 10.00 | Labour Charges for Erection of 11 KV Three Phase Aerial Bunched Cable of size 3 X 95 + 1 X 95 sq mm | 0.8 | KM | 1,28,456.25 ₹1,21,262.7 | 1,16,482.5 ₹1,09,959.48 Lowest | 1,39,500 ₹1,31,688 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
13 Dec 2021, 3:00 pmClosed
The Superintending Engineer/Tirupur EDC
OFFICE OF THE SUPERINTENDING ENGINEER, TIRUPUR ELECTRICITY DISTRIBUTION CIRCLE, 3rd FLOOR, KRBS TOWER, 208 / 650, METTUPALAYAM BUS STOP, PERUMANALLUR ROAD, TIRUPUR 641 602, TAMILNADU.
SURVEY, SUPPLY, ERECTION, TESTING and COMMISSIONING OF 11 KV THREE PHASE AERIAL BUNCHED XLPE INSULATED ALUMINIUM CABLE
2021_EB_215210_1
Spec.No.W.30/2021-22 Dt.27.11.2021
Open Tender
Electrical Works
Turn-key
172 days
33KV CG Pudhur SS Tirupur EDC
3 documents required · 3 mandatory
₹0
₹10,000
Yes
30 Dec 2021
29 Nov 2021
14 Dec 2021
29 Nov 2021
13 Dec 2021
29 Nov 2021
29 Nov 2021 - 13 Dec 2021
stage.html
html • 0.03 MB
tech_eval.pdf
finance_254748.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .