Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹19.8 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹19.8 L+₹5,344.69 (0.27%)Accepted-Finance | L2 | Accepted-Finance Accepted | |
| 3 | Not Admitted-Fee/PreQual/Technical | - | Not Admitted-Fee/PreQual/Technical Others-Document Not Furnished |
| Sl No | Description | Qty | Unit | K Ganesan L2 | SAMBASIVAN CONTRACTOR L1 |
|---|---|---|---|---|---|
| 1.001.Construction of 1,00,000 litre Sump,Providing New Motor,Panel Board,GI Pipe,Cable Wire And Pipe Line Construction of Pump Room @ Beerjepalli H/O Beerjepalli.Es.Amt.Rs:-20.00 Lakhs | |||||
| 2.00 | Earthwork excavation in sand, silt other loose soil wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc. with an initial lead of 10m and lift of 2m. | 11.64 | cum | 246.91 ₹2,874.03 | 246.25 ₹2,866.35 Lowest |
| 3.00 | Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m | 32.58 | cum | 246.91 ₹8,044.33 | 246.25 ₹8,022.83 Lowest |
| 4.00 | Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m | 18.62 | cum | 246.91 ₹4,597.46 | 246.25 ₹4,585.18 Lowest |
| 5.00 | Supplying and filling in foundation and basement with filling M-Sand including water consolidating etc., | 4.65 | cum | 1,401.44 ₹6,516.7 | 1,397.66 ₹6,499.12 Lowest |
| 6.00 | Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed | 4.65 | cum | 4,926.31 ₹22,907.34 | 4,913.03 ₹22,845.59 Lowest |
| 7.00Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs | |||||
| 8.00 | upto 1.50 m & upto 4.50 m below GL | 18.66 | cum | 8,844.92 ₹1,65,046.21 | 8,821.08 ₹1,64,601.35 Lowest |
| 9.00 | Above GL 0-4.50 m Height | 18.2 | cum | 8,847.07 ₹1,61,016.67 | 8,823.22 ₹1,60,582.6 Lowest |
| 10.00Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle | |||||
Tender Value
₹20 L
EMD Value
₹20,000
Closing Date
30 Jul 2025, 3:00 pmClosed
The Block Developement Officer (V.P) Shoolagiri
The Block Development Office Shoolagiri
Krishnagiri District Shoolagiri Block under the Scheme Mines and Minerals _ 2025_26 Construction of 1,00,000litre Sump, New Motor, Panel Board, GI Pipe, Cable Wire And Pipe Line at Beerjepalli in Beerjepalli Panchayat Package No_2025_26_SGI_44
2025_RDTN_586227_1
Rocno_6055_2024_A4
Open Tender
Civil Works
Item Rate
180 days
The Block Development Office Shoolagiri
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹20,000
Yes
The Block Development Office Shoolagiri
31 Oct 2025
28 Jul 2025
30 Jul 2025
28 Jul 2025
30 Jul 2025
28 Jul 2025
29 Jul 2025
Amount
1.Construction of 1,00,000 litre Sump,Providing New Motor,Panel Board,GI Pipe,Cable Wire And Pipe Line Construction of Pump Room @ Beerjepalli H/O Beerjepalli.Es.Amt.Rs:-20.00 Lakhs
Earthwork excavation in sand, silt other loose soil wet sand or silt not under water, light black cotton soil, sandy loam and ordinary soil including excavated earth etc. with an initial lead of 10m and lift of 2m.
Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m
Earthwork excavation in hard stiff clay,black cotton, hard red earth, shales,murrams, ordinary gravel stoney earth mixed with 50% fair sized boulders etc.,with an initial lead of 10m and lift of 2m
Supplying and filling in foundation and basement with filling M-Sand including water consolidating etc.,
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Cement concrete 1:1.5:3 using 20mm ISS HBG metal for all RCC item of works excluding cost of Rein forcement and fabricating charges, centering and shuttering but including curing and providing fixtures like fan clamps in the RCC floor or roof slabs
upto 1.50 m & upto 4.50 m below GL
Above GL 0-4.50 m Height
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
For 0.00M to 3.30M (Curved Surface)
For 0.00 to 3.30 M (FOR ROUND COLUMN)
For 3.30 M- 4.3 M (Plane Surface)
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Providing and fixing of cut stone (Rough dressed) set in CM 1:3 of size 0.60 X 0.60 X 0.30 M at site including cost of all materials, labour charge
Providing AC Cowl of 0.15 m dia using 20mm HBG stone including cost of all materials, centering, shuttering,strutting,reinforcement, placing of concrete, finishing, curing and fixing in position on the roof slab with mosquito proof net arrangement and etc.,
Supply,Delivery and fixing of CI Manhole frame with cover of following size and as directed by TWAD Board Officers.including cost of all materials, fixing of MS clamps,Bolt and nuts etc.,complete
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification.
Supplying and fixing in position of RCC (1:1.5:3) in side access lader of following size using 20mm size HBS jelly including cost of all materials,centring, shuttering,strutting,fabrication and placing in position of reinforcement, finishing, curing etc.,Complete
Provision for supply & fixing of MS ladder including Painting etc. complete.
Filling in Basement with excavated Earth in layers of not more than 15cm. Thick well rammed, watered and consolidated complying with standard specifications etc., complete.
Providing Motor Panel Board And Pipe Line Arrangements (Sub Estimate)
OPENWELL SUBMERSIBLE PUMPSET AS PER IS 14220 / 2002 WITHOUT PANEL BOARD Cost of 15.00 HP 1000lpm x100m
15.00 HP THREE PHASE PANEL BOARD STAR- DELTA WITH TWO LEVEL GUARD AND AUTO START
PVC INSULATED AND SHEATHED 3 CORE FLAT TYPE COPPER CABLE CONFORMING TO IS 694/1990 4 sqmm copper submersible cable as per ISI
Labour charges for the erection of 15.00 HP submersible pumpset in openwell including fixing and jointing submersible cable with proper clamps upto the starter to required depth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, Voltmeter, Ammeter, three pilot (indicating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pumpset and trail run for 10 days.
Supply and delivery of following GI/PVC pipes and specials as per relevant ISI specification for the sche
50mm GI Pipe
50mm GI Coupling
50mm GI Flanget Set
50mm GM Gate Valve
50mm GI Elbow
50mm GI Tee
50mmx65mm GI Reducer
75mm HDPE Pipes -PE100-PN- 6
100 Amps three phase 500 V 4 pole Change over switch
Construction of Pump Room (Sub Estimate)
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation inmcluding watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Random Rubble Masonry in cement Mortar 1 : 5 for foundation and basement using New Stones including necessary provision for Bond stones with simultaneous flush pointing with the same mortar above ground level complying with standard specifications.
Brick work in cm 1:5 Mix using new country bricks including cost and Conveyance of all site etc. complete.
Supplying erecting steel centering for lintel, sunshade and Roof slab etc complete
Cement concerete 1:1.5:3 using 20mm.H.B.G.jelly for all R .c.c. items of works excluding cost of reinforcement and fabricating charges, centering and shuttering but including curing but providing fixtures like fanclamps
Supply and fabrication of steel including , cutting, bending and binding wires etc. complete.
Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work).
Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three M.Sand) 10mm thick including hacking the surfaces, providing cement mortar nosing, beading for sunshades, staircases, steps, landing slabs and curing, etc., in all floors complying with standard specification and as directed by the departmental officers
Providing the following thickness of Granolothic pattern floor finishing with plain cement concrete cc 1:2: 4 using 10 mm to 12 mm size hard broken stone jelly and the top rubbed smooth etc complete complying with standard specification
Plastering in CM 1:5 mix using 12mm thick including cost conveyance of all site etc. complete.
Plastering in CM 1:4 mix using 20mm thick including cost conveyance of all site etc. complete.
Painting Two Coats Approved Plastic Emultion Paint with one coat primer over New Cement Plastered surface including cost and conveyance of materials and labour charges etc complete.Schedule ItemNo.359 – B) - 10.00 Sqm.
Painting two Coats over New iron Works using best quality of enamel paint including cost and conveyance of materials and labour charges etc complete. - 10.00 Sqm.
Supply and Cost of Steel door , Window, Ventilator Door (0.90 x 2.10m)
Supply And Fixing OF RCC Jolly
Provision for Name Board Charges
Towards Cost of Name Board
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
K Ganesan (BID ID -1414090)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .