Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.3 LAccepted-AOC | ₹6.3 L | L1 | Accepted-AOC accepted |
| 2 | Rejected-Technical CHENDARAPATTY | - | - | Rejected-Technical Above the Estimate Rate |
| Sl No | Description | Qty | Unit | SRI SAKTHI CONSTRUCTIONS L2 | SHRI BUILDERS L1 |
|---|---|---|---|---|---|
| 1.00Supply and Delivery of following 90mm Dia HDPE Pipe as per standard specification as directed by Departmental officers | |||||
| 1.01 | 90 MM HDPE Pipe | 1,300 | Rm | 250.55 ₹3.3 L | 250.45 ₹3.3 L |
| 1.02 | 90 MM PVC Pipe | 470 | Rm | 142.55 ₹66,998.50 | 142.5 ₹66,975 |
| 2.00Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings) | |||||
| 2.01 | 90 MM HDPE Pipe | 717 | CM | 194.5 ₹1.4 L | 194 ₹1.4 L |
| 3.00Laying and Joining of Supplied HDPE Pipes | |||||
| 3.01 | 90 MM HDPE Pipe | 1,770 | No | 18.8 ₹33,276 | 18.72 ₹33,134.40 |
| 4.00Refilling the Excavated earth for pipe line trench as directed by Departmental officers | |||||
| 4.01 | 90 MM HDPE Pipe | 717 | No | 42.9 ₹30,759.30 | 42.85 ₹30,723.45 |
| 5.00Refilling the Excavated earth for pipe line trench as directed by Departmental officers | |||||
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
10 Mar 2026, 3:00 pmClosed
Executive Officer
Town Panchayat Office Sentharapatti
Extention of Pipe line atWard No1 Kondayampalli Main Road in Sentharappatty Town Panchayat
2026_DTP_671718_1
25-1/2026
Open Tender
Civil Works
Sentharapatty Town Panchayat
refer Tender Notice
2 documents required · 2 mandatory
₹0
₹15,000
Yes
16 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
10 Mar 2026
7 Mar 2026
Supply and Delivery of following 90mm Dia HDPE Pipe as per standard specification as directed by Departmental officers
90 MM HDPE Pipe
90 MM PVC Pipe
Earth work excavation and depositing on bank with initial lead of 10 m and lift of 2 M in narrow trenches having bed width 1.25m & below for laying of pipes for water supply and sewerage works in the following type of soils as directed by Departmental officers (Measurement as per Surveying Data with reference to Drawings)
90 MM HDPE Pipe
Laying and Joining of Supplied HDPE Pipes
90 MM HDPE Pipe
Refilling the Excavated earth for pipe line trench as directed by Departmental officers
90 MM HDPE Pipe
Refilling the Excavated earth for pipe line trench as directed by Departmental officers
90 mm Dia pvc lbow
90 mm Dia pvc tee
90 mm Dia gate valve
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_807229.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.44 MB
BOQ_807229.xls
BOQ • 0.22 MB
Download all tender documents and submit your bid