Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹44.6 LAccepted-AOC | L1 | Accepted-AOC Lowest quoted rate and stands as L1 | |
| 2 | L2₹47.0 L+₹2.3 L (5.26%)Rejected-AOC | L2 | Rejected-AOC Quoted rate higher L1 and stands as L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Labour License is not uptodate |
Tender Value
₹47.0 L
EMD Value
₹93,939
Closing Date
10 Jan 2020, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer_Guwahati West Division_Irrigati
Office of The Executive Engineer_OGuwahati West Division_Irrigation_Guwahati_8
Earth work RCC work Brick work shuttering plastering etc
2019_ID_15570_1
02 Makeli Ph-III_SOPD-SCSP_2019-20 dt 24_12_19
Open Tender
Civil Works
Item Rate
180 days
Vill 2 No Makeli_Boko
Please refer Tender documents.
6 documents required · 6 mandatory
₹1,000
Executive Engineer_Guwahati West Division_Irrigati
₹93,939
30 Jan 2020
27 Dec 2019
10 Jan 2020
27 Dec 2019
10 Jan 2020
27 Dec 2019
365 days
Amount
Construction of RCC Canal RBMC from ch 240.00m to 496.00m
Earthwork in excavation in foundation of canal structures in ail types of soils as per design and drawing including dressing the foundation, shoring etc. removing the surplus spoils by head load to safe distance from the working place and depositing the required spoils in uniform layers, dressing, watering, breaking clods to not more than 10 mm cube with compensation, complete as directed at site.(lncluding bailing out stagnant rain water where necessary). A) In all types of soils (except soil mixed with gravel and boulders.) (i) (For normal lead of 30 m and lift of 1.5 m)
Soling in foundation at all levels including filling intersides, ramming etc complete as directed and of specifiedthickness with 9 cm brick on flat including sand packing.
CC work in proportion 1:3:6 in foundation / abutment /piers / wing walls etc. with hard river shingles of size 13 mm to 25 mm including curing, dewatering with timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
RCC work in slab, abutment cap and above abutment, pier cap, pedestal, dirt wall etc. in proportion 1.2:4 with hard river shingles of size 6 mm to 20 mm with proper reinforcement as per design including necessary curing, dewatering etc. with necessary timber shuttering, scaffolding etc. where necessary, complete as directed. (Shuttering, scaffolding cost will be paid separately).
Centering and shuttering including propping,nailing, bolting with earth oiling inside 9.2(ii face etc and removal of forms after completion of CC and RCC works etc, complete ) as directed. (Measurement to be taken on the face area timbered), (ii) With 38 mm thick wood plank (Measure volume of concrete)
Supplying fitting fixing and laying reinforcement (TATA) in position in RCC 12 3 workincluding cutting, bending, cranking with two piles 0.91 M (20 BWG) annealed wire hooking tying, complete as directed
12 mm cement plastering including clearing surface and curing, complete as directed, (i) In proportion 1:3
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50% shrinkage allowance from the gross quantity).
Turfing with grass sode of largest possible rectangular and minimum size 30 cm X 30 0 cm X 10 cm placing closely after dressing hard the surface and fixing sode with split bamboo pegs, watering till the grass grows with lead up to 90 M and lift of 1.50 M, complete as directed.
Construction of Earthen Canal LC
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.5% shrinkage allowance from the gross quantity)
Construction of Earthen Canal LC1
Earthwork in filling in all soils in canal embankment and bed filling as per design section and grade by cart carriage for a minimum distance of 1 KM including paying compensation of earth obtained from private land if any loading, unloading, spreading the same in embankment in layers not exceeding 15 cm thick including clearing light jungle, removing trees upto 15 cm dia and uprooting roots and stumps etc. from the seat of the embankment, breaking clods not more than 10 mm cube, ramming, dressing and roughening the seat of the embankment, profiling etc. with all lift, complete as directed. (Payment will be made after deduction of 12.50% shrinkage allowance from the gross auantitv).
Ponkaj Deka
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .