| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹15.1 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹15.2 L+₹15,989.11 (1.06%)Accepted-Finance | L2 | Accepted-Finance accepted |
Tender Value
₹15.5 L
EMD Value
₹16,000
Closing Date
12 Feb 2020, 3:00 pmClosed
Project Director
DRDA Krishnagiri
Krishnagiri DT Renovation or Rejuvenation of Ponds and Ooranies from State Finance Commission Grants 2019 20 Krishnagiri Block TN 04 KRI 290 3 Ponds
2020_RDTN_155928_1
Roc_No_5732_2019_R4_20_01_2020
Open Tender
Civil Works - Water Works
Item Rate
180 days
Krishnagiri
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹16,000
DRDA Krishnagiri
14 Feb 2020
30 Jan 2020
12 Feb 2020
30 Jan 2020
12 Feb 2020
30 Jan 2020
3 Feb 2020
Amount
Renovation of Peyanapalli Eri at Palayabeyanapalli H/o.Pachiganapalli.
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc.,
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Provision for Name board arrangements
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete for channel
Construction of Surplus Weir
Earth work excavating and depositing on bank with initial lead of 10mt and lift of 2mt in hard stiff clay ,stiff black cotton,hard red .earth,shales,murrum,gravel,stoney earth and earth mixed with small size boulders as per ss 20 A. ( For Hard soil ) For roads, supply channels, desilting of MI Tanks, Pond & Kulam.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle below GL
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle above GL
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Rough stone dry packing for aprons and revetments , including all cost and conveyance of men and materials etc., all complete rate for- 1 cum
.Renovation of Kottagundu Kuttai at Kuttakollai H/o:Sembadamuthur
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc.,
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete for channel
Provision for Name board arrangements
Provision for Boundry Stone
Construction of Surplus Weir
Earthwork Excavation for foundation in all Soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etcusing mild steel sheets of size 90 x 60 cm and 10 guage stiffened, welded with mild steel angles of size 25mmx25mmx3mm for boarding laid over silver oak (countrywood) scantlings of size 10cm x 6.5cm spaced of about 90cm centre to centre and supported by casurina props of 10cm to 13cm dia spaced at 75cm centre to centre complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Below Ground Level
Above Ground level
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for bed blocks
Cement concrete 1 : 1.5 : 3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Renovation of Mel Manthoppo kuttai at Kuttakollai H/o:Sembadamuthur
Clearing Scrub Jungle without alignment and uprooting of wild vegetation, bushes, shrubs, saplings and trees of girth upto 300mm for the strengthening of the bund and the ground shall be left in a perfectly clean condition etc.,
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete
Earthwork in all Soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100m deploying earth moving machinery and tipeers including benching, formation of bunds, breaking clods, sectioning etc., complete for channel
Provision for Name board arrangements
Provision for Boundry Stone
Repairs of Surplus Weir
Earth work excavating and depositing on bank with initial lead of 10mt and lift of 2mt in hard stiff clay ,stiff black cotton,hard red .earth,shales,murrum,gravel,stoney earth and earth mixed with small size boulders as per ss 20 A. ( For Hard soil ) For roads, supply channels, desilting of MI Tanks, Pond & Kulam.
Cement concrete 1 : 4 : 8 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed
Supplying & Erecting centering for sides & soffiots including necessary supports & strutting upto 3.29m height for plane surfaces in all floors with all cross bracings using mild steel sheets of size 90 x 60cm & 10 gauge stiffened, welded with steel angle
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Cement concrete 1 : 1.5 :3 mix using 20mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed.
Plastering with cm 1 : 5, 20 mm thick over the cement concrete for floor finishing including curing etc.. Complete the work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
A SARAVANARAJ
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .