Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.5 LAccepted-AOC | ₹75.5 L Quoted ₹76.1 L | L1 | Accepted-AOC Agreement accepted by SE |
| 2 | L2₹77.7 LRejected-Finance | ₹77.7 L | L2 | Rejected-Finance Second Lowest tenderer for L2 |
| 3 | L3₹78.5 LRejected-Finance NO 17 NEW CAUVERY NAGAR THANJAVUR 613 001 | THANJAVUR | TAMIL NADU | 613001 | ₹78.5 L | L3 | Rejected-Finance Third Lowest tenderer for L3 |
| Sl No | Description | Qty | Unit | SRI JAGATHI CONSTRUCTION L3 | SIVASUBRAMANIAN RAMASAMY L1 | B SARAVANAKUMAR L2 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for fixing and removing of barricading arrangements using 10 to 13 cm Casurina Props of tying 60cm below ground level fixing and 2.10m above ground level fixing and 5 to 8 cm dia Casurina Props five rows horizontally horizontally 0.45m above ground level and tying with new coir rope and removing the all materials after the counting is over. (3 days) | 2,099.6 | Rmt | 275 ₹5.8 L | 265 ₹5.6 L | 272 ₹5.7 L |
| 1.01 | Hire charges for materials for the above item( for 3 days) | 2,099.6 | Rmt | 81 ₹1.7 L | 79 ₹1.7 L | 80 ₹1.7 L |
| 1.02 | Hire charges for materials for the above item( for 13 days) | 736.2 | Rmt | 352 ₹2.6 L | 340 ₹2.5 L | 348 ₹2.6 L |
| 2.00 | Charges for supplying, fixing and removing of barricading arrangements using 10 to 13 mm dia Casurina Props 3.30m height vertically @ 75cm c/c and tied horizontally with same casurina props 5 rows tying with new coir rope and removing the same after counting is over. (16 days) | 191.2 | Rmt | 406 ₹77,627.20 | 400 ₹76,480 | 402 ₹76,862.40 |
| 2.01 | Hire charges for materials for the above item( for 16 days) | 191.2 | Rmt | 649 ₹1.2 L | 630 ₹1.2 L | 643 ₹1.2 L |
| 3.00Hire Charges for movable steel barricading in size 2.40m length 1.50m height including cost of labour for shifting and arrangements, conveyance charges and removing the all materials after the counting is over etc., complete as per standard specifications. (for 16 days) | ||||||
| 3.01 | Hire charges for materials for the above item( for 16 days) | 8 | Nos | 24,960 ₹2.0 L | 24,360 ₹1.9 L | 24,720 ₹2.0 L |
| 4.00 | Charges for Supplying, erection and removing for G.I Temporary Shed using Casurina props vertically and tied horizontally at top for purlins and fixing GI sheet above the purlins etc., complete complying with standard specifications. | 297 | Sq.m | 233 ₹69,201 | 225 ₹66,825 | 231 ₹68,607 |
| 4.01 | Hire charges for materials for the above item(3days) | 147.7 | Sq.m | 44 ₹6,498.80 | 43 ₹6,351.10 | 43 ₹6,351.10 |
| 4.02 | Hire charges for materials for the above item( for 16days) | 9 | Sq.m | 233 ₹2,097 | 225 ₹2,025 | 231 ₹2,079 |
Tender Value
₹75.5 L
EMD Value
₹47,800
Closing Date
8 Apr 2026, 3:00 pmClosed
Superintending Engineer
Office of the Superintending Engineer, PWD., Building Construction and Maintenance Circle, Thanjavur-1
Providing Safety barricading arrangements to Strong Room, sealing Room and counting Hall for 173 Thiruvaiyaru Assembly Constituency 174 Thanjavur Assembly Constituency and 175 Orathanadu Assembly Constituency at Thanjavur
2026_PWD_675530_2
98-1-2025-2026
Open Tender
Civil Works - Buildings
30 days
Thanjavur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹47,800
3 Jun 2026
6 Apr 2026
9 Apr 2026
6 Apr 2026
8 Apr 2026
6 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Charges for fixing and removing of barricading arrangements using 10 to 13 cm Casurina Props of tying 60cm below ground level fixing and 2.10m above ground level fixing and 5 to 8 cm dia Casurina Props five rows horizontally horizontally 0.45m above ground level and tying with new coir rope and removing the all materials after the counting is over. (3 days) | |||||
| 1.01 | Hire charges for materials for the above item( for 3 days) | - | Rmt | - | - |
| 1.02 | Hire charges for materials for the above item( for 13 days) | - | Rmt | - | - |
| 2Charges for supplying, fixing and removing of barricading arrangements using 10 to 13 mm dia Casurina Props 3.30m height vertically @ 75cm c/c and tied horizontally with same casurina props 5 rows tying with new coir rope and removing the same after counting is over. (16 days) | |||||
| 2.01 | Hire charges for materials for the above item( for 16 days) | - | Rmt | - | - |
| 3Hire Charges for movable steel barricading in size 2.40m length 1.50m height including cost of labour for shifting and arrangements, conveyance charges and removing the all materials after the counting is over etc., complete as per standard specifications. (for 16 days) | |||||
| 3.01 | Hire charges for materials for the above item( for 16 days) | - | Nos | - | - |
| 4Charges for Supplying, erection and removing for G.I Temporary Shed using Casurina props vertically and tied horizontally at top for purlins and fixing GI sheet above the purlins etc., complete complying with standard specifications. | |||||
| 4.01 | Hire charges for materials for the above item(3days) | - | Sq.m | - | - |
| 4.02 | Hire charges for materials for the above item( for 16days) | - | Sq.m | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
ConThanjavur.pdf
Tender Documents • 2.21 MB
BOQ_811912.xls
BOQ • 0.43 MB
Download all tender documents and submit your bid