| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC NO 6 76 EAST STREET THOPPUR MADURAI 625008 | MADURAI | MADURAI | TAMIL NADU | 625008 | ₹8.2 L Quoted ₹9.6 L | L1 | Accepted-AOC AWARD OF CONTRACT |
| 2 | L2₹9.7 LRejected-Finance 1 250 Y KODIKULAM KODIKULAM POST MADURAI 625 104 | MADURAI | MADURAI | TAMIL NADU | 625104 | ₹9.7 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | C RAJASEKARAN L1 | BOSE & CO L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in all type of soils including all labour charges including initial lead, lift, etc. complete.
Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. SS 20 B @ 40% | 19.1 | M3 | 126 ₹2,406.6 | 125 ₹2,387.5 Lowest |
| 2.00 | Earth work excavation for foundation in all type of soils including all labour charges including initial lead, lift, etc. complete.
Earth work excavation for foundation in soft disintegrated rock, latarite soft rock or kankar not riquiring blasting with an initial lead of 10 m and lift of 2m etc., complete. @ 40% | 19.1 | M3 | 180 ₹3,438 Lowest | 180 ₹3,438 Lowest |
| 3.00 | Earth work excavation for foundation in all type of soils including all labour charges including initial lead, lift, etc. complete.
Hard Rock measured in solid including blasting & stacking @ 20% | 9.55 | M3 | 342 ₹3,266.1 | 300 ₹2,865 Lowest |
| 4.00 | PCC 1:3:6, using 40mm HBG metal foundation including cost of cement, all materials, labour, lead, lift, etc. complete. | 10 | M3 | 6,300 ₹63,000 Lowest | 7,500 ₹75,000 |
| 5.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, without form work, including of all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For raft concrete. | 16 | M3 | 9,000 ₹1,44,000 Lowest | 9,000 ₹1,44,000 Lowest |
| 6.00 | Brickwork in CM 1:5 mix using II class chamber bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete. | 18 | M3 | 7,200 ₹1,29,600 Lowest | 9,000 ₹1,62,000 |
| 7.00 | Plastering with cm 1:3, 12mm thick including cost of cement, all materials,curing, labour, lead and lift etc., complete. | 129 | M2 | 270 ₹34,830 Lowest | 300 ₹38,700 |
| 8.00 | Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete. | 1.04 | MT | 90,000 ₹93,600 | 60,000 ₹62,400 Lowest |
| 9.00 | Painting the outside walls with exterior emulsion two coats over a primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete. | 129 | M2 | 270 ₹34,830 Lowest | 300 ₹38,700 |
| 10.00 | Supply and Filling of Red gravel for SS Yard filling, stacking to the department , Labour for filling watering and consolidation yard as per std. spec.including cost of materials labour lead,lift etc | 182 | M3 | 720 ₹1,31,040 Lowest | 770 ₹1,40,140 |
Tender Value
Refer Docs
EMD Value
₹10,000
Closing Date
23 Feb 2026, 12:00 pmClosed
SE/GCC/Madurai
SE/GCC/Madurai
Providing Extension cable Duct 110/11 KV SS at Kappalur in Madurai EDC
2026_EB_659545_1
SE/GCC/Madurai F. Specn. No.071/2025-26
Limited
Civil Works
Works
90 days
Madurai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹10,000
9 Jun 2026
17 Feb 2026
24 Feb 2026
17 Feb 2026
23 Feb 2026
17 Feb 2026
Earth work excavation for foundation in all type of soils including all labour charges including initial lead, lift, etc. complete. Earth work excavation for foundation in hard stiff clay, stiff black cotton hard red earth, shales, muram, gravel, stoney earth and earth mixed with small size boulders with an initial lead, lift, etc, complete. SS 20 B @ 40%
Earth work excavation for foundation in all type of soils including all labour charges including initial lead, lift, etc. complete. Earth work excavation for foundation in soft disintegrated rock, latarite soft rock or kankar not riquiring blasting with an initial lead of 10 m and lift of 2m etc., complete. @ 40%
Earth work excavation for foundation in all type of soils including all labour charges including initial lead, lift, etc. complete. Hard Rock measured in solid including blasting & stacking @ 20%
PCC 1:3:6, using 40mm HBG metal foundation including cost of cement, all materials, labour, lead, lift, etc. complete.
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, without form work, including of all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For raft concrete.
Brickwork in CM 1:5 mix using II class chamber bricks of size 9"x 4 3/8"x2"3/4" for super structure including cost of all materials, labour, lead, lift, curing, etc., complete.
Plastering with cm 1:3, 12mm thick including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Providing steel reinforcement for RCC works including cost of steel rod binding wire and placing in postion of the steel reinforcement all materials, lead and lift etc., complete.
Painting the outside walls with exterior emulsion two coats over a primer coat of approved colour and quality including cost of all matreials, lead and lift etc., complete.
Supply and Filling of Red gravel for SS Yard filling, stacking to the department , Labour for filling watering and consolidation yard as per std. spec.including cost of materials labour lead,lift etc
Supplying and filling of Stone dust in SS area for fire prvention materials as per standard specification including cost of all materials lead lift etc complete.
Supplying & Filling of 20mm HBG metal in the SS Yard stacking to the departnment including labour for filling watering and consolidation yard as per std. spec.inciuding transport of materials ,labour lead, lift etc
SGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
CGST to be quoted in Percentage (value alone) Ex. 9%, it should be entered as 9 only
Inter-state GST @18% for other than Tamil Nadu supplier. If the contractor is within Tamil Nadu may be quoted as "0" only
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.37 MB
BOQ_791327.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].