Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹24.5 CrAdmitted-Finance | ₹24.5 Cr | L1 | Admitted-Finance |
| 2 | L2₹28.5 CrAdmitted-Finance RG METRO ARCADE SECTOR 11 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | ₹28.5 Cr | L2 | Admitted-Finance |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | HL HANDA AND CO L1 | ENVIRO INFRA ENGINEERS LIMITED L2 |
|---|---|---|---|---|---|
| 1.00 | Operation and Maintenance Charges for five year and entire satisfaction to the Engineer-in- Charge | 1 | Complete Job | 1,50,000 ₹1.5 L | 1,00,000 ₹1 L |
| 2.00 | Main Pumping Station
Design, Construction, erection, testing and commissioning of MPS and its required components including OandM for 5 years after one year defect liability period and 3 months test trial run period - i.e RCC Inlet Chamber, Screen Chamber, Rectangular Collecting tank in two compartments with partition wall, Panel Room of 35 Sqm suitable for 10.00 MLD average flow with peak factor of 2.25 landscaping of the
campus providing and installing of 5 No. Submersible sewage Pumping sets of i.e 1 No. of 10400LPM (624m3/hr) 2 No. of 6950 LPM ( 416 m3/hr) and 2 No. of 3500 LPM (208 m3/hr) with 20.00 mtr head each suitable LT Panel. All the infrastructure required to be executed at site to make the MPS functional is included in the scope of work for lump sump job. All All the pumping machinery, panel board, level sensor etc. shall be controlled by PLC and SCADA and shall be synchronized with PLC panels at MPS and STP site through broadband internal facility. | 1 | Complete Job | 2,00,00,000 ₹2 Cr | 4,50,00,000 ₹4.5 Cr |
| 3.00 | Sewage Treatment Plant
Design, Construction, Erection Testing and Commissioning of 10.00 MLD Capacity Sewage Treatment Plant based on Sequential Batch Reactor of rectangular shape (SBR) Technology complete in all respects including of Tertiary Treatment unit Civil Works, Mechanical Works and Electrical Works. Supplying and Installation of Odour
Control System : Biotrickling Filter plus Activated Carbon Polishing stage complete in all respects as per satisfaction of the Engineer in charge. Providing and installing 12 No. CCTV Cameras. High Mast Light 12 No. Construction of Boundary wall constructed over RCC Columns at 3 metre centre to centre with expansion joint at 30 mtr centre to centre with total length of 665 metre as per satisfaction of
the Engineer in charge. Construction of Cement Concrete Pathway 400 m x 3 m wide as per satisfaction of the Engineer in charge. Construction of 4 No. Staff Quarters of 61 Sqm area each and Site clearance as per satisfaction of the Engineer in charge. | 1 | Complete Job | 22,50,00,000 ₹22.5 Cr | 24,00,00,000 ₹24 Cr |
Updated dates
Tender Value
₹25.1 Cr
EMD Value
₹50.2 L
Closing Date
9 Mar 2026, 12:00 pmClosed
Narender Kumar Payal
Construction Division-II
Construction of Sewage Treatment Plant of 10.00 MLD based on SBR (Sequential Batch Reactor) Technology in Sector-29, Pinjore Kalka Urban Comple
2025_HRY_485585_1
20259B31A5F2 AE41 4CA9 AEE9 DCCA5D5BAB9F2239003
Open Tender
Civil Works
750 days
Pinjore
2 documents required · 2 mandatory
₹20,000
₹50.2 L
Yes
Chief Engineer, PMDA Panchkula
30 May 2026
26 Nov 2025
9 Mar 2026
26 Nov 2025
9 Mar 2026
26 Nov 2025
10 Dec 2025
Operation and Maintenance Charges for five year and entire satisfaction to the Engineer-in- Charge
Sewage Treatment Plant Design, Construction, Erection Testing and Commissioning of 10.00 MLD Capacity Sewage Treatment Plant based on Sequential Batch Reactor of rectangular shape (SBR) Technology complete in all respects including of Tertiary Treatment unit Civil Works, Mechanical Works and Electrical Works. Supplying and Installation of Odour Control System : Biotrickling Filter plus Activated Carbon Polishing stage complete in all respects as per satisfaction of the Engineer in charge. Providing and installing 12 No. CCTV Cameras. High Mast Light 12 No. Construction of Boundary wall constructed over RCC Columns at 3 metre centre to centre with expansion joint at 30 mtr centre to centre with total length of 665 metre as per satisfaction of the Engineer in charge. Construction of Cement Concrete Pathway 400 m x 3 m wide as per satisfaction of the Engineer in charge. Construction of 4 No. Staff Quarters of 61 Sqm area each and Site clearance as per satisfaction of the Engineer in charge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 14.03 MB
BOQ_563619.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid