Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC | ₹4.1 L | L1 | Accepted-AOC Accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical Rejected |
| Sl No | Description | Qty | Unit | Elaiyaraja Arumugam L1 | PRAKASH L2 |
|---|---|---|---|---|---|
| 1.01 | Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation | 10.08 | cum | 131 ₹1,320.48 | 135 ₹1,360.80 |
| 1.02 | Filling with good GSB(Granular Sub base) including all cost and conveyance of all materials and all labour charges etc., complete. | 20.38 | cum | 2,133 ₹43,470.54 | 2,135 ₹43,511.30 |
| 1.03 | Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using Country wood props & Scantlings complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete. | 75.6 | cum | 250 ₹18,900 | 270 ₹20,412 |
| 1.04 | Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 7.73 | cum | 6,640.21 ₹51,328.82 | 6,645 ₹51,365.85 |
| 1.05 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 20.38 | cum | 5,886.77 ₹1.2 L | 5,890 ₹1.2 L |
| 1.06 | Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete | 14.7 | cum | 7,184.98 ₹1.1 L | 7,184.98 ₹1.1 L |
| 1.07 | Provision for Tar Pad | 2.89 | cum | 234.3 ₹677.13 | 234.3 ₹677.13 |
| 1.08 | Provision for Name Board | 1 | Nos | 4,500 ₹4,500 | 4,500 ₹4,500 |
| 1.09 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | Nos | 62,241.94 ₹62,241.94 | 62,547.21 ₹62,547.21 |
Tender Value
₹4.1 L
EMD Value
₹4,120
Closing Date
2 Mar 2026, 4:00 pmClosed
BDO (VP)
Block Development Office Nallur
Providing CC road at south Street at A.Chittur panchayat
2026_RDTN_667351_29
B1/0251/2026
Open Tender
Civil Works - Roads
90 days
Nallur
As Per Tender
4 documents required · 4 mandatory
₹0
₹4,120
Yes
12 Apr 2026
28 Feb 2026
2 Mar 2026
28 Feb 2026
2 Mar 2026
28 Feb 2026
Earth work excavation and depositing on bank with in initial lead of 10m and lift of 2m in hard gravelly soil as per SS 20 B for foundation
Filling with good GSB(Granular Sub base) including all cost and conveyance of all materials and all labour charges etc., complete.
Supplying and erecting centering shuttering including necessary supports for plane surface in foundation and basement and in all floors for R C C column footing column plinth beam, beams, roof slabs, staircase steps, bed blocks, critical pier etc using Country wood props & Scantlings complete complying with standard specifications and as directed by departmental officers including conveyance of all materials to site and proper centering etc complete.
Cement concrete 1:3:6 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Cement concrete 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing, laying and curing etc complete
Provision for Tar Pad
Provision for Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_803378.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.60 MB
BOQ_803378.xls
BOQ • 0.30 MB
ChitturCC12.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid