Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.5 CrAccepted-Finance GRAM ALIPUR MORNA TEHSIL MAWANA DISTRICT MEERUT UTTAR PRADESH 245001 | 245001 | L1 | Accepted-Finance L1 | |
| 2 | L2₹2.7 Cr+₹17.8 L (7.08%)Rejected-Finance FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.7 Cr+₹22.1 L (8.80%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹2.8 Cr+₹28.1 L (11.2%)Rejected-Finance FAIZABAD TEHSIL BEHAT DISTRICT SAHARANPUR UTTAR PRADESH | BEHAT | SAHARANPUR | UTTAR PRADESH | L4 | Rejected-Finance L4 | |
| 5 | L5₹2.8 Cr+₹31.6 L (12.5%)Rejected-Finance | L5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | NARESH KUMAR L1 | MA AND SONS L2 | ARUN KUMAR GUPTA L5 | Arun Kumar L4 | mamber singh L3 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance as per direction of Engineer-in-charge | 110.19 | Cum | 300 ₹33,057 | 400 ₹44,076 | 466.2 ₹51,370.58 | 234 ₹25,784.46 Lowest | 500 ₹55,095 |
| 2.00 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 2,178 | Cum | 10 ₹21,780 Lowest | 70 ₹1,52,460 | 90 ₹1,96,020 | 66 ₹1,43,748 | 80 ₹1,74,240 |
| 3.00 | Dewatering with all cost of power, P.O.L,machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work | 87,013.44 | Hr/HP | 11.5 ₹10,00,654.56 Lowest | 15 ₹13,05,201.6 | 36 ₹31,32,483.84 | 36 ₹31,32,483.84 | 24 ₹20,88,322.56 |
| 4.00 | Providing and Fixing M.S Centering and shuttering of RCC/CC work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 5,829.44 | Sqm | 410 ₹23,90,070.4 | 420 ₹24,48,364.8 | 517.5 ₹30,16,735.2 | 199 ₹11,60,058.56 Lowest | 410 ₹23,90,070.4 |
| 5.00 | Providing and laying Cement concrete A20 M15 (1:2:4) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 703.58 | Cum | 5,200 ₹36,58,616 | 4,200 ₹29,55,036 Lowest | 4,925.48 ₹34,65,465.7 | 5,130 ₹36,09,365.4 | 5,200 ₹36,58,616 |
| 6.00 | Providing and Fixing Precast Cement Concrete A20M20(1:1.5:3) tile laying in Canal Side Slope with its proper mixig, shuttering, placing, curing etc including all cost of material T&P, labour etc.complete. | 173.67 | Cum | 6,700 ₹11,63,589 | 5,800 ₹10,07,286 Lowest | 6,158.3 ₹10,69,511.09 | 6,600 ₹11,46,222 | 6,600 ₹11,46,222 |
| 7.00 | Providing and laying Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 856.86 | Cum | 6,000 ₹51,41,160 | 5,600 ₹47,98,416 | 5,468.99 ₹46,86,154.49 Lowest | 5,900 ₹50,55,474 | 5,600 ₹47,98,416 |
| 8.00 | Providing and laying Cement concrete A20 M10 (1:3:6) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work as directed by engineer-in-charge. | 510.4 | Cum | 4,900 ₹25,00,960 | 3,500 ₹17,86,400 Lowest | 4,467.11 ₹22,80,010.39 | 4,949 ₹25,25,969.6 | 4,600 ₹23,47,840 |
| 9.00 | Providing and laying Reinforcement Fe 550 (SAIL/TATA/JINDAL etc.) in cutting, bending, binding, welding and placing in Position inculiding all cost of material, labour and T&P etc. required for proper completion of work as per directed by engineer-in-charge. | 18.97 | MT | 70,500 ₹13,37,385 | 60,000 ₹11,38,200 Lowest | 67,114.49 ₹12,73,161.78 | 69,000 ₹13,08,930 | 74,000 ₹14,03,780 |
| 10.00 | Earth work in embankment by power transported earth with lead beyond 200 m and upto 1 km including excavation, loading, unloading, comaction, ramming, dressing and all lifts etc. with all cost of labour, material and T&P etc. complete as per direction of Engineer in Charge. | 14,113 | Cum | 70.6 ₹9,96,377.8 Lowest | 90 ₹12,70,170 | 162 ₹22,86,306 | 169 ₹23,85,097 | 120 ₹16,93,560 |
Tender Value
₹3.1 Cr
EMD Value
₹6.3 L
Closing Date
30 Sept 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE 1st IWC Meerut
Office of SE 1st IWC Meerut
As per the NIT
2026_UPIDC_1185387_15
13/SE-1/2026-27
Open Tender
Civil Works
Piece-work
90 days
Muzaffarnagar
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.3 L
Office of SE 1st IWC Meerut
15 Oct 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
30 Sept 2026
24 Sept 2026
25 Sept 2026
90 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling brick work or cement concrete in cement mortar including stacking of material with in distance as per direction of Engineer-in-charge | 110.19 | Cum | - | - |
| 2 | Earth work in excavation in foundation in all type of soil with all lead and lift, including back filling,watering and ramming of excavated earth into the trenches or into the space between the structure, the sides of foundation trenches with removal and disposal of surplus earth required for proper completion of work as directed by the engineer-in-charge | 2,178 | Cum | - | - |
| 3 | Dewatering with all cost of power, P.O.L,machines, pump, well point system and operator etc. with assembling and deassembling of machines etc. required for proper completion of work | 87,013.44 | Hr/HP | - | - |
| 4 | Providing and Fixing M.S Centering and shuttering of RCC/CC work including cost of all material, labour and T&P required for proper completion of work as directed by engineer-in-charge. | 5,829.44 | Sqm | - | - |
| 5 | Providing and laying Cement concrete A20 M15 (1:2:4) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 703.58 | Cum | - | - |
| 6 | Providing and Fixing Precast Cement Concrete A20M20(1:1.5:3) tile laying in Canal Side Slope with its proper mixig, shuttering, placing, curing etc including all cost of material T&P, labour etc.complete. | 173.67 | Cum | - | - |
| 7 | Providing and laying Cement concrete A20 M20 (1:1.5:3) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work. | 856.86 | Cum | - | - |
| 8 | Providing and laying Cement concrete A20 M10 (1:3:6) with mechanical mixing & vibration, curing etc. including all cost of material, labour, T&P etc. complete required for proper completion of work as directed by engineer-in-charge. | 510.4 | Cum | - | - |
| 9 | Providing and laying Reinforcement Fe 550 (SAIL/TATA/JINDAL etc.) in cutting, bending, binding, welding and placing in Position inculiding all cost of material, labour and T&P etc. required for proper completion of work as per directed by engineer-in-charge. | 18.97 | MT | - | - |
| 10 | Earth work in embankment by power transported earth with lead beyond 200 m and upto 1 km including excavation, loading, unloading, comaction, ramming, dressing and all lifts etc. with all cost of labour, material and T&P etc. complete as per direction of Engineer in Charge. | 14,113 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.59 MB
BOQ_2240783.xls
BOQ • 0.30 MB
TDUploadLOT10.pdf
Tender Documents • 6.83 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .