Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC | ₹1.4 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹1.4 CrRejected-AOC | ₹1.4 Cr | L2 | Rejected-AOC Rejected |
| 3 | L3₹1.4 CrRejected-AOC | ₹1.4 Cr | L3 | Rejected-AOC Rejected |
| 4 | L4₹1.5 CrRejected-AOC | ₹1.5 Cr | L4 | Rejected-AOC Rejected |
| Sl No | Description | Qty | Unit | Sri Sivasakthi Associates L3 | S.K CONSTRUCTION L4 | Kheerthi Associates L1 | M/S MRD CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismantling clearing away and carefully stacking materials useful for reuse for any thickness of RCC complete etc., complete complying with standard specification and as directed by the departmental officer. | 23 | cum | 4,830 ₹1,11,090 | 4,900 ₹1,12,700 | 4,900 ₹1,12,700 | 4,500 ₹1,03,500 Lowest |
| 2.00 | Dismantling clearing away and carefully stacking materials use for reuse for any thickness of brick/stone masonry in cement mortar walls under 3 m height etc complete complying with standard specification and as directed by the departmental officersl. | 39.9 | cum | 315 ₹12,568.5 | 330 ₹13,167 | 300 ₹11,970 | 280 ₹11,172 Lowest |
| 3.00 | Removal of Weld Mesh arrangements frames etc., complete complete as directed by the Departmental officers. | 127.4 | sqm | 173.25 ₹22,072.05 | 190 ₹24,206 | 165 ₹21,021 | 160 ₹20,384 Lowest |
| 4.00 | Dismantling clearing away and carefully stacking materials useful for reuse for any thickness of wall AC Sheet Roofing without roof timbers complete as directed by the Departmental officers. | 275.3 | sqm | 21 ₹5,781.3 | 20 ₹5,506 | 18 ₹4,955.4 | 17 ₹4,680.1 Lowest |
| 5.00 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers.- Upto 2.40m Footing Depth.
Data worked out for 48 m3 per day/8 hrs. | 267 | cum | 383.25 ₹1,02,327.75 | 400 ₹1,06,800 | 365 ₹97,455 | 350 ₹93,450 Lowest |
| 6.00 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 34.4 | cum | 2,300 ₹79,120 | 2,300 ₹79,120 | 2,115 ₹72,756 | 2,100 ₹72,240 Lowest |
| 7.00 | Refilling with excavated earth other than sand with an initial head load of 100 mts. and depositing the earth as shown by the departmental officers in layers of not more than 15cm thick well rammed with surface vibrator, watered and consolidated etc., complete complying with standard specification and as directed by the departmental officers. | 76 | cum | 170 ₹12,920 | 170 ₹12,920 | 160 ₹12,160 Lowest | 175 ₹13,300 |
| 8.00 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. | 69 | cum | 483 ₹33,327 | 480 ₹33,120 | 465 ₹32,085 Lowest | 470 ₹32,430 |
| 9.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 19.5 | cum | 5,775 ₹1,12,612.5 | 5,700 ₹1,11,150 | 5,600 ₹1,09,200 Lowest | 5,800 ₹1,13,100 |
| 10.00 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for flooring including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 27 | cum | 5,775 ₹1,55,925 | 5,800 ₹1,56,600 | 5,600 ₹1,51,200 Lowest | 5,900 ₹1,59,300 |
Tender Value
₹1.4 Cr
EMD Value
₹78,000
Closing Date
13 Nov 2025, 3:00 pmClosed
Chief Engineer
Office of Chief Engineer, PWD Projects, Chepauk, Chennai 5
Construction of two multipurpose halls in Govt Polytechnic College at Bargur in Kirishnagiri Dist.
2025_HE_619252_1
Bargur_2025
Open Tender
Civil Works
Lump-sum
150 days
Bargur
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹78,000
7 Mar 2026
31 Oct 2025
14 Nov 2025
31 Oct 2025
13 Nov 2025
31 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Bargur_condition.pdf
Tender Documents • 2.54 MB
BOQ_740262.xls
BOQ • 0.40 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].