Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical AG 112 SALT LAKE CITY SECTOR II UNIT 608 6TH FLOOR KOLKATA 700091 | 24 PARAGANAS NORTH | WEST BENGAL | 700091 | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 3 | Admitted-Fee/PreQual/Technical 5A GOBINDA SARKAR LANE KOLKATA 700 012 | KOLKATA | WEST BENGAL | 700012 | Admitted-Fee/PreQual/Technical |
| 4 | Admitted-Fee/PreQual/Technical N A | Admitted-Fee/PreQual/Technical |
| 5 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹3.3 L
EMD Value
₹6,617
Closing Date
16 Mar 2026, 11:30 amClosed
Sri. Tapas Manna AE KESD-1
11A Mirza GalibStreet Kolkata
Repair and renovation works in Muslim Prayer Hall within the campus of Khadya Bhawan Building 11A, Mirza Galib Street, Kolkata 87.
2026_WBPWD_1015401_1
WBPWD/AE /eNIT-15/KESD-I /2025-26
Open Tender
CIVIL WORKS
Percentage
20 days
11A Mirza GalibStreet
Please refer Tender documents.
4 documents required · 4 mandatory
₹6,617
Yes
8 Sept 2026
28 Feb 2026
18 Mar 2026
2 Mar 2026
16 Mar 2026
2 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 90 | Sq.M | 19 | ₹1,710 |
| 2 | (a) Applying 2 coats of bonding agent with synthetic multi functional rubber emulsion having adhesive and water proofing properties by mixing with water in proportion (1 bonding agent : 4 water : 6 cement) as per Manufacturer's specification [Cement to be supplied by the Department] | 90 | Sq.M | 88 | ₹7,920 |
| 3 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface]
(i) With 1:6 cement mortar
(b) 20 mm thick plaster | 90 | Sq.M | 172 | ₹15,480 |
| 4 | Applying Interior grade Acrylic Primer of approved quality and brand on plastered or cencrete surface old or new surface to receive Distemper/ Acrylic emulsion paint including scraping and preparing the surface throughly, complete as per manufacturer's specification and as per direction of the EIC. (In Ground Floor)
(a) One Coat ii) Solvent based interior grade Acrylic Primer | 180 | Sq.M | 33.7 | ₹6,066 |
| 5 | Applying Acrylic Emulsion Paint of approved make and brand on walls and ceiling including sand papering in intermediate coats including putty (to be done under specific instruction of Superintending Engineer) : (Two coats) ii) Luxury Quality | 180 | Sq.M | 70 | ₹12,600 |
| 6 | Supplying, fitting and fixing of false ceiling framework with powder coated
exposed G.I. grid suspension system (E-Grid T 2430/1510 or equivalent load carrying capacity with mid span deflection not exceeding 1/360 span with hanger spacing of 1200mm c/c ) consisting of Main Runner 3600 mm long, Cross Tee 1200 mm / 600 mm long and Wall Angle. The Wall Angle shall be fixed on PVC Dash Fasteners on the perimeter of the wall by steel screws with distance 300mm c/c. The Main Runners to be placed @ 1200 mm. The Cross Tee 1200mm will be inserted in the pre-cut slots of Main Runner at regular interval of 600 mm to form a modular grid of 1200mm X 600mm. Additional Cross Tees of 600 mm shall be placed perpendicular to the Cross Tee 1200 mm long to finally form a grid of 600 mm X 600 mm. Grid of module size 600 mm X 600 mm shall be supported by 6 mm dia G.I. wire from purlins / soffit. all complete as per drawing & directions of Engineer-in-charge. | 44 | Sq.M | 341 | ₹15,004 |
| 7 | A. Exposed False-ceiling Work --
(a) Supplying, fitting & fixing High Pressure steam Cured Non Asbestos fibre cement standard ceiling board (Density > 1300Kg per Cu.m. ) of size595mm X595mm conforming IS 14862 and type B, catagory III of ISO 8336, tested as per AS-1530 Part 3 and BS-476 Part 4,5,6,7 & 8, should be placed in the Grid module to form a false ceiling all complete as per drawing & direction of Engineer - in- Charge.
False ceiling with (i) 4mm thick Fibre Cement Standard ceiling board. | 44 | Sq.M | 225 | ₹9,900 |
| 8 | Labour for Chipping of concrete surface before taking up Plastering work. | 44 | Sq.M | 21 | ₹924 |
| 9 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm
nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety | 6.6 | Cu.M | 5,257.21 | ₹34,697.59 |
| 10 | Artificial stone in floor, dado, staircase etc with cement concrete (1:2:4) with stone chips, laid in panels as directed with topping made with ordinary or white cement (as necessary) and marble dust in proportion (1:2) including smooth finishing and rounding off corners including raking
out joints or roughening of concrete surface and application of cement slurry before flooring works using cement @ 1.75 kg/sq.m all complete including all materials and labour. In ground floor.
3 mm. thick topping (High polishing grinding on this item is not permitted with ordinary cement). Using grey cement
(i) 35 mm. thick | 53 | Sq.M | 327.21 | ₹17,342.13 |
stage.html
html • 0.12 MB
tech_bid_open.pdf
cancelled_1.pdf
pdf • 0.05 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
BOQ_2497267.xls
BOQ • 0.29 MB
2911_.pdf
Tender Documents • 1.86 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .