Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹30.5 LAdmitted-Fee/PreQual/Technical/Finance 26 P BLOCK KUNJ VIHAR YASHODA NAGAR KANPUR NAGAR UTTAR PRADESH 208011 | KANPUR NAGAR | UTTAR PRADESH | 208011 | -16.99% | ₹30.5 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹31.2 L+₹73,072.80 (2.40%)Admitted-Fee/PreQual/Technical/Finance | -15.00% | ₹31.2 L+₹73,072.80 (2.40%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L2₹31.2 L+₹73,072.80 (2.40%)Admitted-Fee/PreQual/Technical/Finance 001 HPS MARKET KANPUR GANDHI CHAURAHA RAEBARELI UTTAR PRADESH 229206 UDYAM UP 62 0025959 | RAE BARELI | UTTAR PRADESH | 229206 | -15.00% | ₹31.2 L+₹73,072.80 (2.40%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 4 | L3₹33.0 L+₹2.6 L (8.42%)Admitted-Fee/PreQual/Technical/Finance 11 126 GWAL TOLI KANPUR | KANPUR | KANPUR | UTTAR PRADESH | -10.00% | ₹33.0 L+₹2.6 L (8.42%) | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹36.7 L
EMD Value
₹3.7 L
Closing Date
16 Sept 2026, 3:00 pmClosed
CE KNN
CE KNN moti jheel
Construction of RCC Nala from Rehan Paints Store To Raju Dari house in Sujatganj ward99 Zone02
2026_NNKAN_1182534_1
356/AA-2/2026-27
Open Tender
Civil Works
Fixed-rate
90 days
kanpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,793
₹3.7 L
19 Sept 2026
5 Sept 2026
16 Sept 2026
5 Sept 2026
16 Sept 2026
5 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in execavation in foundation and under plinth area lift 1.5 m lead 30 m with all charges complete. | 440 | cum | 170 | ₹74,800 |
| 2 | Providing and Laying of Cement concrete 1:5:10 Cement,C.Sand and 40mm gauge stone ballast etc all complete. | 44 | cum | 5,450 | ₹2,39,800 |
| 3 | Reinforcement cement concrete work in 1:1.5:3 grade excluding cost of centering, shuttering and finishing. For Column work. | 169.75 | cum | 7,590 | ₹12,88,402.5 |
| 4 | Mild steel or iron work in plain worksuch as reinforced concrete to required shape as necessary including binding for proper completion of work. | 133.25 | qtl | 7,200 | ₹9,59,400 |
| 5 | Centering and Shuttering including strutting propping etc and removal of walls (any thickness) etc all complete. | 1,280 | sqm | 390 | ₹4,99,200 |
| 6 | Disposal of surplus earth/ malwa upto 3Km etc all complete. | 396.9 | cum | 116.96 | ₹46,421.89 |
| 7 | Supply and Inogration board with padestal of stainless steel made etc all complete. | 1 | Nos | 3,840 | ₹3,840 |
| 8 | Add 18% G.S.T | 1 | tax | 5,60,135.59 | ₹5,60,135.59 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.23 MB
BOQ_2223520.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .