Loading…
Loading…
Tender Value
₹2.0 L
EMD Value
₹3,940
Closing Date
29 Sept 2026, 6:00 pmDue tomorrow
Executive Engineer RRWD SMC
Executive Engineer RIGHT RIVER WORKS DIVISON REGAL LANE LAL CHOWK
Construction of Lane from the main road to the H/O Ghulam Qadir at Bonamsar Sonwar
2026_HAUDD_325188_19
NOTICE INVITING ETENDER No. 35 of 2026-2027 Dated 18.09.2026 RRWD SMC
Open Tender
Civil Works
Percentage
30 days
Bonamsar Sonwar
Please refer Tender documents.
2 documents required · 2 mandatory
₹205
FA/CAO AC NO 0216010200000007
₹3,940
21 Sept 2026
21 Sept 2026
30 Sept 2026
21 Sept 2026
29 Sept 2026
21 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix) | 8.92 | Cum | 1,725.2 | ₹15,388.78 |
| - | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centering and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 2.42 | Cum | 5,733.6 | ₹13,875.31 |
| - | Chequerred precast cement concrete tiles 22mm thick in footpath and courtyard, jointed with neat cement slurry mixed with pigment to match the shade of the tiles, including rubbing, cleaning and curing complete, on 20 mm thick bed of cement mortar 1:4 (1 cement: 4 coarse sand). Light shade using white cement | 105.94 | Sqm | 1,293.6 | ₹1,37,043.98 |
| - | Providing laying and fixing of PVC pipes of make grade B incld excavation and refilling complete job as directed at site including carriages up to site of work Camp. 200 mm | 70 | Rft | 330 | ₹23,100 |
| - | Carriage of material from source to dumping site by MT
Aggregates/Sand | 3.26 | Cum | 344.49 | ₹1,123.04 |
| - | Structural steel work in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Welded | 50 | Kgs | 138.2 | ₹6,910 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.22 MB
BOQ_1098743.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .